thepermitmap

Monthly report · May 2024

Toronto building permits, May 2024

The City of Toronto issued 2,629 building permits in May 2024, −4.2% on April 2024 and −3.5% on May 2023. Between them they cover 2,359 new homes and $1.3B of declared construction value. Yonge-Bay Corridor took the most permits of any neighbourhood, at 105.

Permits issued
2,629−4.2% on April 2024
Homes created
2,359net +2,271 after 88 removed
Declared construction value
$1.3Bas filed, not adjusted
Demolitions
101full demolition permits

Where the building happened

The 15 busiest of Toronto’s 158 neighbourhoods this month. Permit count and new homes are different questions: Yonge-Bay Corridor led on permits, while Banbury-Don Mills added the most homes at 1,769. A permit without a dwelling unit is usually a renovation, a mechanical system or a sign.

What the permits were for

Largest projects by declared value

Issued Address Work What was filed Value Status
May 3, 2024 1150 Eglinton Ave E New Building 32 storey residential apartment building containing 308 dwelling units, a 39 storey residential apartment building containing 379 dwelling units, three levels of underground parking, amenity areas, and a 3 level podium connecting the two towers - Crosstown Block 12 - Phase 1 towers 1 and 2 $322.5M New build
May 3, 2024 1150 Eglinton Ave E New Building Proposal to construct a new 34 storey residential condo with 377 residential suites - BUILDING 3, Crosstown Block 12, Phase 2. See also 19 242909 NNY 16 SA.East tower $168.0M New build
May 30, 2024 844 Don Mills Rd New Building Construction of a 27 storey mixed use building with 390 affordable rental residential units, long term care, retail and daycare space, and 2 levels of below grade parking garage $132.5M New build
May 2, 2024 1150 Eglinton Ave E New Building Proposal to construct a new 8 storey residential condo with 191 residential units Crosstown Block 12, Phase 3. . $101.0M New build
May 27, 2024 1755 Steeles Ave W Addition(s) Construct extension to existing steam plant on Sanofi campus to house two new 75000lb/hr boilers(correct set of plans inserted @ 03.01.2024-MC) $81.0M Closed
May 3, 2024 65 Dundas St E Interior Alterations Proposal for renovation and conversion of existing Hotel Building into affordable housing by City of Toronto. Scope of work includes renovating the interior spaces and finishes and associated Mechanical, Electrical and Plumbing services as per the new program requirements. This application is for Ph $48.0M Open
May 10, 2024 40 Playfair Ave Interior Alterations Full renovation of floors 2 - 5 of the Fusco wing. The renovations will include walls, celing, floors, bathrooms, HVAC, Plumbing, Nurse Call. The roof will be repaired as well. $40.0M Open
May 3, 2024 1150 Eglinton Ave E New Building Proposal to construct a new 3 storey, stacked, and back to back townhousesCrosstown Block 12, Phase 3. . $25.0M New build
May 27, 2024 155 Falstaff Ave New Building Proposed to construct a new 2 storey (6474 Sq.M) elementary school with child care centre. $22.2M New build
May 24, 2024 610 University Ave Interior Alterations proposing renovation of interior floor area on the 2nd, 5th and 10th storey of the Princess Margaret Cancer Centre building and corresponding work on 6th storey mechanical room. $21.0M Open

The 10 most expensive permits issued in May 2024, the largest at $322.5M on 1150 Eglinton Ave E. Declared value is the applicant’s own estimate on the form, not a contract price or an assessment.

How to read this, and what it is not

This counts permits the City issued in May 2024, not permits applied for. An issued permit is a decision that has happened, which is what makes the month a real unit. A permit applied for in May 2024 may not be issued for months and will appear in that month instead. Permit counts are not construction: a single build often takes separate building, plumbing, HVAC and drain permits, so 2,629 permits is fewer than 2,629 projects.

32 of this month’s permits were for laneway or garden suites — see the running count. Figures are rebuilt daily from the City’s open data and can revise as the City updates its own records, so a month keeps settling for a while after it ends. Nothing here is hand-entered. Full sources and caveats: method. A year earlier, in May 2023, the City issued 2,724 permits covering 834 homes.

Journalists and researchers are welcome to quote these figures with a link to this page. Underlying data is the City of Toronto’s, under the Open Government Licence.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
2,629
Refresh
Daily from the City
Sheet
RPT-202405