Neighbourhood · 1 of 158 by permit count
Building permits in Yonge-Bay Corridor
The City of Toronto has 42,660 building permits on record for the Yonge-Bay Corridor neighbourhood, going back to 1973. That is more than any other neighbourhood in Toronto. Those permits created 2,611 homes and removed 9, a net change of +2,602. Declared construction value totals $9.3B. Half of the 41,280 permits issued here came through within 18 days of the application. The most recent permit was issued Oct 30, 2026 at 100 Front St W.
- Permits on record
- 42,6601973–2026
- Declared construction value
- $9.3Bas filed, not adjusted
- Homes created
- 2,611dwelling units
- Homes removed
- 9net +2,602
- Typical wait
- 18 days9 days faster than the city
Permits issued per year
Zoning
- Most common zone
- CR99.7% of permits · by-law 40.10
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 33,716of 42,660 on record
The zoning categories the permits in Yonge-Bay Corridor fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Minor variances at the Committee of Adjustment
- Applications on record
- 69since 2016
- Approved
- 98.0%7.2% above the city · 49 decided
- Median time to a decision
- 131 days11 days slower than the city
Some projects in Yonge-Bay Corridor need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. Back to back, that is about 149 days, not the 18 days the permit figure alone suggests. How variances work, and the approval rates.
Most common work
Structures worked on
Postal areas
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Oct 30, 2026 | 100 Front St W | Interior Alterations | Revision 02: adding new gypsum ceilings, revision of sprinkler layouts, addition of lighting, and the associated HVAC and electrical updates.Interior renovation of the retail corridor off of the east entrance at the lobby level. | — | Open |
| Oct 30, 2026 | 200 Bay St | Building Permit Related(PS) | Plumbing - Proposal for interior alterations for the tenant fit-out of an existing office space | — | Open |
| Oct 30, 2026 | 199 Bay St | Electromagnetic Locks | REV01: Proposed revision to add an additional 3 maglocksProposed installation of maglocks | — | Open |
| Oct 30, 2026 | 4 King St W | Sprinklers | Sprinkler permit drawings for building permit 25 269649 BLD 00 BA. | $5K | Open |
| Oct 30, 2026 | 200 Bay St | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposal for interior alterations for the tenant fit-out of an existing office space | — | Open |
| Oct 30, 2026 | 111 Richmond St W | Sprinklers | Proposal for fsu permit application for a demo back-to-base project. | $80K | Open |
| Oct 30, 2026 | 200 Bay St | Interior Alterations | Proposal for interior alterations for the tenant fit-out of an existing office space | $1K | Open |
| Oct 30, 2026 | 79 Wellington St W | Sprinklers | This project consists in designing and installing a modification to the existing sprinkler system due to new renovation for level 6 in an existing 30-storey building. OBC Classificiation : D (see 26 212429) | $48K | Open |
| Oct 30, 2026 | 200 Bay St | Building Permit Related(MS) | HVAC - Proposal for interior alterations for the tenant fit-out of an existing office space | — | Open |
| Oct 30, 2026 | 199 Bay St | Electromagnetic Locks | Proposal for fire/security upgrade and install 1 maglock power supply for existing maglock basement collaboration door. | $25K | Open |
| Oct 30, 2026 | 161 Bay St | Interior Alterations | Proposal for interior alterations to accommodate a tenant fit out within Suite 4240 | $2.4M | Open |
| Oct 30, 2026 | 77 King St W | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposal for Office Tennat fit out | — | Open |
| Oct 30, 2026 | 604 Bay St | Partial Permit - Foundation | Conditional Permit - Part Permit - Proposal for construction of 16-storey mixed-use rental apartment building with 2 levels below grade. | — | Open |
| Oct 29, 2026 | 77 King St W | Building Permit Related(PS) | Plumbing - TORONTO DOMINION CENTRE TOWER 2, CONCOURSE LEVEL,CRU #42A RETURN TO BASE FOR THE CADILLAC FAIRVIEW CORPORATION LIMITED | — | Open |
| Oct 29, 2026 | 105 Adelaide St W | Building Permit Related(MS) | HVAC - Interior alterations - Unit 10A - Restaurant | — | Open |
| Oct 29, 2026 | 790 Bay St | Other(FS) | New water service and fire service to existing medical building, addition of back flow preventer on fire protection service. -Standpipe/sprinkler | $500K | Open |
| Oct 29, 2026 | 790 Bay St | Backflow Prevention Devices (Water only) | New water service and fire service to existing medical building, addition of back flow preventer on fire protection service. - Back flow preventer | $500K | Open |
| Oct 29, 2026 | 200 Bay St | Building Permit Related(MS) | HVAC - Interior renovation for the addition of 3 new offices within suite | — | Open |
| Oct 29, 2026 | 95 Wellington St W | Other(FS) | 17th Floor: -Remove temporary upright sprinklers.-Relocate up to two (2) fire hose cabinets. -Supply and install up to one (1) fire hose cabinet, c/w SV. Wiring and programming by others.-Supply and install up to one hundred fifty-seven (157) white concealed pendent sprinklers.-Supply and install up | $205K | Open |
| Oct 29, 2026 | 77 King St W | Building Permit Related(MS) | HVAC - TORONTO DOMINION CENTRE TOWER 2, CONCOURSE LEVEL,CRU #42A RETURN TO BASE FOR THE CADILLAC FAIRVIEW CORPORATION LIMITED | — | Open |
| Oct 29, 2026 | 105 Adelaide St W | Interior Alterations | Interior alterations - Unit 10A - Restaurant | $350K | Open |
| Oct 29, 2026 | 100 King St W | Building Permit Related(MS) | HVAC - Proposed interior alterations of existing suite for the Department of Foreign Affairs - Ireland. | — | Open |
| Oct 29, 2026 | 77 King St W | Interior Alterations | TORONTO DOMINION CENTRE TOWER 2, CONCOURSE LEVEL,CRU #42A RETURN TO BASE FOR THE CADILLAC FAIRVIEW CORPORATION LIMITED | $150K | Open |
| Oct 29, 2026 | 790 Bay St | Site Service | New water service and fire service to existing medical building, addition of back flow preventer on fire protection service. - site services | $500K | Open |
| Oct 29, 2026 | 105 Adelaide St W | Building Permit Related(PS) | Plumbing - Interior alterations - Unit 10A - Restaurant | — | Open |
| Oct 29, 2026 | 79 Wellington St W | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to existing office. | — | Open |
| Oct 29, 2026 | 100 Wellington St W | Building Permit Related(MS) | REV02: Proposed revision to existing ductworkRevisions 01: Revisions to existing ductwork, and existing fire dampers to remain and Landlord to apply for separate permit for maintenance HVAC - Proposal for interior alterations - Back to base level P2, P1, Plaza level 4, 8, 9, 10, 19, 33. 33 Mezzanine | — | Open |
| Oct 29, 2026 | 79 Wellington St W | Interior Alterations | Proposal for interior alterations to existing office. | $1.4M | Open |
| Oct 29, 2026 | 79 Wellington St W | Building Permit Related(MS) | HVAC - Proposal for interior alterations to existing office. | — | Open |
| Oct 29, 2026 | 555 University Ave | Building Permit Related(MS) | REV 01: Revisions to combination fire/smoke damper (FSD) system on Levels 9 and 10: FSD duct smoke detectors (factory-mounted/wired) connected to the fire alarm system on dedicated zones per floor(Mechanical MCN-05R1, Electrical ECN-08), and relocation of one ceiling access panel in Soiled Utility R | — | Open |
| Oct 29, 2026 | 200 Bay St | Interior Alterations | Interior renovation for the addition of 3 new offices within suite | $85K | Open |
| Oct 29, 2026 | 555 University Ave | Interior Alterations | REV 01: Revisions to combination fire/smoke damper (FSD) system on Levels 9 and 10: FSD duct smoke detectors (factory-mounted/wired) connected to the fire alarm system on dedicated zones per floor(Mechanical MCN-05R1, Electrical ECN-08), and relocation of one ceiling access panel in Soiled Utility R | — | Open |
| Oct 28, 2026 | 130 King St W | HVAC: Groups D & E | Proposal for interior demolition to bring the 17th floor back to base. | $1K | Open |
| Oct 28, 2026 | 161 Bay St | Building Permit Related(MS) | HVAC - INTERIOR ALTERATIONS TO CEILING TILES, LIGHT FIXTURES AND DEVICES. | — | Open |
| Oct 28, 2026 | 130 Adelaide St W | Interior Alterations | Proposal for interior alterations to existing office | $500K | Open |
| Oct 28, 2026 | 181 Bay St | Building Permit Related(MS) | HVAC - Proposed interior alterations of existing office. | — | Open |
| Oct 28, 2026 | 595 Bay St | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposed an interior alteration | — | Open |
| Oct 28, 2026 | 181 Bay St | Interior Alterations | Proposed interior alterations of existing office. | $3.0M | Open |
| Oct 28, 2026 | 320 Bay St | Building Permit Related(PS) | Revision 01: Plumbing - Proposal for interior alterations to office space | — | Open |
| Oct 28, 2026 | 181 Bay St | Sprinklers | This project consists of design and alteration of existing sprinkler system for tenant fit-up. The starting point for installation is existing branch line/cross main. Ref: 26 151717 BLD 00 BA | $37K | Open |
The 40 most recent of 42,660 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.