Street · 10 of 8,567 by permit count
Building permits on St Clair Ave W
The City of Toronto has 6,015 building permits on record for St Clair Ave W, going back to 1973. That is the 10th busiest street in the city. Those permits created 1,540 homes and removed 35, a net change of +1,505. Declared construction value totals $1.1B. The most recent permit was issued Sep 11, 2026 at 55 St Clair Ave W.
- Permits on record
- 6,0151973–2026
- Declared construction value
- $1.1Bas filed, not adjusted
- Homes created
- 1,540dwelling units
- Homes removed
- 35net +1,505
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Where this street runs
Yonge-St.Clair 1,811 permits
Junction Area 1,419 permits
Wychwood 786 permits
Rockcliffe-Smythe 766 permits
Corso Italia-Davenport 638 permits
Casa Loma 308 permits
Weston-Pelham Park 189 permits
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 11, 2026 | Interior Alterations | Proposal for interior alterations to an existing office space | $50K | Open |
| Sep 10, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to an existing office space | — | Open |
| Sep 10, 2026 | Other(TS) | Proposed air structure (tennis bubble) installed from Oct 6, 2026 to Apr 6, 2027 | — | Open |
| Sep 9, 2026 | Sign Building Permit Related | 1 wall sign**MIZZICA** | — | Open |
| Sep 8, 2026 | Interior Alterations | Rev 01: Revision to permit, proposal for interior alterations to the second floor (not in original scope) and changes to the main floor and basement (as bubbled)Proposal for interior alterations to the ground and basement levels for new restaurant, greater than 30 seats. | — | Open |
| Sep 8, 2026 | Building Permit Related(PS) | Plumbing - Proposed interior alterations of existing Group D offices - UNIT 800 & 900 | — | Open |
| Sep 8, 2026 | Building Permit Related(MS) | REV 01: Revision to permit (as bubbled)HVAC - Proposal for interior alterations to the ground and basement levels for new restaurant, greater than 30 seats. | — | Open |
| Sep 8, 2026 | Building Permit Related(PS) | Plumbing - Proposed interior alterations for legalization of existing conditions. | — | Open |
| Sep 8, 2026 | Other(BA) | Proposal to install retractable glazing system on existing balcony. | $32K | Open |
| Sep 8, 2026 | Building Permit Related(MS) | HVAC - Proposed interior alterations for legalization of existing conditions. | — | Open |
| Sep 8, 2026 | Building Permit Related(MS) | HVAC - Proposed interior alterations of existing Group D offices - UNIT 800 & 900 | — | Open |
| Sep 8, 2026 | Interior Alterations | Proposed interior alterations for legalization of existing conditions. | $5K | Open |
| Sep 8, 2026 | Other(BA) | Proposal to install retractable glazing system on existing balcony. | $26K | Open |
| Sep 8, 2026 | Interior Alterations | Proposed interior alterations of existing Group D offices - UNIT 800 & 900 | $150K | Open |
| Sep 4, 2026 | Interior Alterations | Proposed interior alterations to basement and ground floor to convert existing retail space to a clinic (RMT, Chiro, Physio) | $100K | Open |
| Sep 4, 2026 | Building Permit Related(MS) | HVAC - Proposed interior alterations to basement and ground floor to convert existing retail space to a personal service shop. | — | Open |
| Sep 1, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior demolition of partition layouts and ceilings. | — | Open |
| Sep 1, 2026 | Interior Demolition | Proposal for interior demolition of partition layouts and ceilings. | — | Demolition |
| Sep 1, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior demolition of partition layouts and ceilings. | — | Open |
| Aug 31, 2026 | Electromagnetic Locks | Proposal for maglock installation. | $1K | Open |
| Aug 28, 2026 | New Building | REV02: Proposed revision to account for updates to barrier free suite designation distribution on floors 2-4, 7-8 & 11-12; no change to overall dwelling unitsRevision 01: Revision to permit to include addition of room included at the top of elevator shaft for maintenance accessNew construction of 13 | — | New build |
| Aug 27, 2026 | Interior Alterations | INTERIOR ALTERATIONS TO COMBINE UNITS A & B AT THE GROUND FLOOR GROUP 'E' NEW TENANT - RESTAURANT/CAFE. | $90K | Open |
| Aug 27, 2026 | Building Permit Related(MS) | HVAC - Interior fit-out permit application (Building, HVAC and Plumbing) for a new restaurant, Il Fornello, at 2650 St. Clair ave W. The new restaurant is located at the southwest corner of the existing building. | — | Open |
| Aug 25, 2026 | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193212 B01 00 NH.MODEL NAME "FLORENCE" Block E - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193111 B01 00 NH. MODEL NAME "FLORENCE" Block C - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193111 B01 00 NH. MODEL NAME "HANLEY" Block C - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Reflect City comments in permit 23193153 B01 00 NH. MODEL NAME "FRENCH" Block D - 8 back-to-back townhouses | — | New build |
| Aug 25, 2026 | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall, revised exterior wall assembly between Blocks A/B (which is considered one block), and revisions to assemblies to reflect City comments in permit 23192883 B01 00 NH. MODEL NAME "HANLEY" Block B - 1 | — | New build |
| Aug 25, 2026 | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall, revised exterior wall assembly between Blocks A/B (which is considered one block), and revisions to assemblies to reflect City comments in permit 23192883 B01 00 NH. MODEL NAME "FLORENCE" Block B - | — | New build |
| Aug 25, 2026 | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193111 B01 00 NH. MODEL NAME "FLORENCE" Block C - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193212 B01 00 NH.Revision: deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193212 B01 00 N | — | New build |
| Aug 25, 2026 | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193111 B01 00 NH. MODEL NAME "FLORENCE" Block C - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Reflect City comments in permit 23193153 B01 00 NH. MODEL NAME "FRENCH" Block D - 8 back-to-back townhouses | — | New build |
| Aug 25, 2026 | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall, revised exterior wall assembly between Blocks A/B (which is considered one block), and revisions to assemblies to reflect City comments in permit 23192883 B01 00 NH. MODEL NAME "FLORENCE" Block B - | — | New build |
| Aug 25, 2026 | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193212 B01 00 NH.MODEL NAME "FLORENCE" Block E - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193111 B01 00 NH. MODEL NAME "FLORENCE" Block C - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193111 B01 00 NH. MODEL NAME "FLORENCE" Block C - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193212 B01 00 NH.MODEL NAME "HANLEY" Block E - 18 back-to-back townhouses with parking garage for the 18 townhouses | — | New build |
| Aug 25, 2026 | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193212 B01 00 NH.MODEL NAME "FLORENCE" Block E - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | Building Permit Related(PS) | Plumbing - Interior fit-out permit application (Building, HVAC and Plumbing) for a new restaurant, Il Fornello, at 2650 St. Clair ave W. The new restaurant is located at the southwest corner of the existing building. | — | Open |
The 40 most recent of 6,015 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.