Neighbourhood · 66 of 158 by permit count
Building permits in Rockcliffe-Smythe
The City of Toronto has 5,758 building permits on record for the Rockcliffe-Smythe neighbourhood, going back to 1985. Those permits created 437 homes and removed 89, a net change of +348. Declared construction value totals $372.1M. The most recent permit was issued Sep 10, 2026 at 81 Delemere Ave.
- Permits on record
- 5,7581985–2026
- Declared construction value
- $372.1Mas filed, not adjusted
- Homes created
- 437dwelling units
- Homes removed
- 89net +348
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Sep 10, 2026 | 81 Delemere Ave | Building Permit Related(MS) | HVAC - Proposal for new two storey rear addition, interior renovations to all floors of existing single family dwelling | — | Open |
| Sep 9, 2026 | 43 Mould Ave | Building Permit Related(PS) | Plumbing - PROPOSED 2 STOREY LANEWAY SUITE | — | Open |
| Sep 9, 2026 | 137 Foxwell St | Building Permit Related(MS) | HVAC - Proposed new 4-unit multiplex. Demo existing house and garage. | — | Open |
| Sep 9, 2026 | 43 Mould Ave | New Laneway / Rear Yard Suite | PROPOSED 2 STOREY LANEWAY SUITE | $500K | Open |
| Sep 9, 2026 | 40 Brendwin Rd | Porch | proposal for adding of 5m2 portico on existing front porch | $10K | Open |
| Sep 9, 2026 | 115 Black Creek Blvd | Back Water Valve (Sewer only) | INSTALL BACK WATER VALVE | — | Open |
| Sep 9, 2026 | 43 Mould Ave | Building Permit Related (DR) | Drain - PROPOSED 2 STOREY LANEWAY SUITE | — | Open |
| Sep 9, 2026 | 137 Foxwell St | New Building | Proposed new 4-unit houseplex. Demo existing house and garage. | $1.5M | New build |
| Sep 9, 2026 | 137 Foxwell St | Demolition | To demolish existing dwelling and construct a new 4-unit houseplex | — | Demolition |
| Sep 4, 2026 | 94 Eileen Ave | Building Permit Related(PS) | Rev :01 - Revision to plumbing permitPlumbing - Proposal for multiple projects (secons storey rear addition, rear yard deck and interior alterations). | — | Open |
| Sep 4, 2026 | 94 Eileen Ave | Multiple Projects | REVISION 02: Permit revisionREVISION 01:Proposal for multiple projects (second storey rear addition, rear yard deck and interior alterations). | — | Open |
| Sep 1, 2026 | 156 Spears St | Multiple Projects | Revision not to build the second floor addition and proposed rear addition. Proposal for ground floor plus basement. .Proposal for interior alterations and a second floor addition. (Refer to #26-140248 BLD for Admin. permit) | — | Open |
| Aug 27, 2026 | 15 Duern St | Building Permit Related(MS) | HVAC - Proposed two-storey additions, underpinning, and interior alterations to convert an existing two-storey detached dwelling from a single-family residence into three dwelling units. | — | Open |
| Aug 27, 2026 | 15 Duern St | Multiple Projects | Proposed two-storey additions, underpinning, and interior alterations to convert an existing two-storey detached dwelling from a single-family residence into three dwelling units. | $400K | Open |
| Aug 27, 2026 | 2650 St Clair Ave W | Building Permit Related(MS) | HVAC - Interior fit-out permit application (Building, HVAC and Plumbing) for a new restaurant, Il Fornello, at 2650 St. Clair ave W. The new restaurant is located at the southwest corner of the existing building. | — | Open |
| Aug 27, 2026 | 15 Duern St | Building Permit Related (DR) | Drain - Proposed two-storey additions, underpinning, and interior alterations to convert an existing two-storey detached dwelling from a single-family residence into three dwelling units. | — | Open |
| Aug 27, 2026 | 15 Duern St | Building Permit Related(PS) | Plumbing - Proposed two-storey additions, underpinning, and interior alterations to convert an existing two-storey detached dwelling from a single-family residence into three dwelling units. | — | Open |
| Aug 26, 2026 | 39 Blakley Ave | Interior Alterations | Revision 04- Remove proposed R12 insulation note on bsmt plan (A2) and section (A4)Revision 03- Adding front porch.Proposal for interior alterations to an existing SFD-detached dwelling. | — | Closed |
| Aug 26, 2026 | 15 Outlook Ave | Retaining Wall | Proposed retaining wall at he rear yard between 15 and 11 Outlook Ave. | $5K | Open |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193111 B01 00 NH. MODEL NAME "HANLEY" Block C - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Reflect City comments in permit 23193153 B01 00 NH. MODEL NAME "FRENCH" Block D - 8 back-to-back townhouses | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall, revised exterior wall assembly between Blocks A/B (which is considered one block), and revisions to assemblies to reflect City comments in permit 23192883 B01 00 NH. MODEL NAME "HANLEY" Block B - 1 | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall, revised exterior wall assembly between Blocks A/B (which is considered one block), and revisions to assemblies to reflect City comments in permit 23192883 B01 00 NH. MODEL NAME "FLORENCE" Block B - | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193111 B01 00 NH. MODEL NAME "FLORENCE" Block C - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193212 B01 00 NH.Revision: deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193212 B01 00 N | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193111 B01 00 NH. MODEL NAME "FLORENCE" Block C - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Reflect City comments in permit 23193153 B01 00 NH. MODEL NAME "FRENCH" Block D - 8 back-to-back townhouses | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193111 B01 00 NH. MODEL NAME "FLORENCE" Block C - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall, revised exterior wall assembly between Blocks A/B (which is considered one block), and revisions to assemblies to reflect City comments in permit 23192883 B01 00 NH. MODEL NAME "FLORENCE" Block B - | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193212 B01 00 NH.MODEL NAME "FLORENCE" Block E - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193111 B01 00 NH. MODEL NAME "FLORENCE" Block C - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193212 B01 00 NH.MODEL NAME "HANLEY" Block E - 18 back-to-back townhouses with parking garage for the 18 townhouses | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193212 B01 00 NH.MODEL NAME "FLORENCE" Block E - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | Building Permit Related(PS) | Plumbing - Interior fit-out permit application (Building, HVAC and Plumbing) for a new restaurant, Il Fornello, at 2650 St. Clair ave W. The new restaurant is located at the southwest corner of the existing building. | — | Open |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall, revised exterior wall assembly between Blocks A/B (which is considered one block), and revisions to assemblies to reflect City comments in permit 23192883 B01 00 NH. MODEL NAME "FLORENCE" Block B - | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193111 B01 00 NH. MODEL NAME "FLORENCE" Block C - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall, revised exterior wall assembly between Blocks A/B (which is considered one block), and revisions to assemblies to reflect City comments in permit 23192883 B01 00 NH. MODEL NAME "FLORENCE" Block B - | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall and revisions to assemblies to reflect City comments in permit 23193111 B01 00 NH. MODEL NAME "HANLEY" Block C - 18 back-to-back townhouses | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: Roof design revised to engineered wood truss system. Revision: Deletion of 2hr fire wall, revised exterior wall assembly between Blocks A/B (which is considered one block), and revisions to assemblies to reflect City comments in permit 23192883 B01 00 NH. MODEL NAME "FLORENCE" Block B - | — | New build |
| Aug 25, 2026 | 2650 St Clair Ave W | New Building | Revision 02: See attached revised Architectural and Structural Drawings for Block A. Roof design revised to engineered wood truss system. Revision: deletion of 2hr fire wall, revised exterior wall assembly between Blocks A/B (which is considered one block), and revisions to assemblies to reflect Cit | — | New build |
The 40 most recent of 5,758 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.