Street · 336 of 8,567 by permit count
Building permits on Farnham Ave
The City of Toronto has 442 building permits on record for Farnham Ave, going back to 1992. Those permits created 14 homes and removed 7, a net change of +7. Declared construction value totals $25.6M. The most recent permit was applied for Sep 1, 2026 at 122 Farnham Ave.
- Permits on record
- 4421992–2026
- Declared construction value
- $25.6Mas filed, not adjusted
- Homes created
- 14dwelling units
- Homes removed
- 7net +7
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 1, 2026 | Building Permit Related(MS) | HVAC - Proposal for 2 storey rear addition to existing 3 storey SFD | — | Open |
| Aug 17, 2026 | Building Permit Related(PS) | Plumbing - Proposal to construct a new three-storey single family dwelling with walk-out stair, rear deck and integral garage.See also 24-130542 ZAP 00 ZR & 24-138258 STE 12 MV | — | Open |
| Aug 17, 2026 | Building Permit Related(PS) | Plumbing - Proposal to construct a new three-storey single family dwelling with walk-out stair, rear deck and integral garage.See also 24-130536 ZAP 00 ZR & 24-138257 STE 12 MV | — | Open |
| Aug 17, 2026 | Building Permit Related (DR) | Drain - Proposal to construct a new three-storey single family dwelling with walk-out stair, rear deck and integral garage.See also 24-130542 ZAP 00 ZR & 24-138258 STE 12 MV | — | Open |
| Aug 17, 2026 | Building Permit Related (DR) | Drain - Proposal to construct a new three-storey single family dwelling with walk-out stair, rear deck and integral garage.See also 24-130536 ZAP 00 ZR & 24-138257 STE 12 MV | — | Open |
| Aug 17, 2026 | Demolition | Proposal to demolish existing two-storey single family dwelling & sever the property into two residential lots.See also 24-138250 STE 12 CO | — | Demolition |
| Aug 14, 2026 | New Building | Proposal to construct a new three-storey single family dwelling with walk-out stair, rear deck and integral garage.See also 24-130542 ZAP 00 ZR & 24-138258 STE 12 MV | $950K | New build |
| Aug 14, 2026 | New Building | Proposal to construct a new three-storey single family dwelling with walk-out stair, rear deck and integral garage.See also 24-130536 ZAP 00 ZR & 24-138257 STE 12 MV | $950K | New build |
| Jul 9, 2026 | Interior Alterations | Revision to increase the height of the side guardrail into 6 screen walls. on the 3rd floor deck.Proposal for Interior Alterations including deck on third floor to an existing SFD-detached dwelling. | — | Open |
| Jun 26, 2026 | Other(SR) | Proposed residential rooftop solar PV system consisting of 8 roof-mounted solar panels with a total capacity of 4 kW, combined with a 27 kWh battery energy storage system (Tesla Powerwall 3 + Expansion). | $50K | Closed |
| Jun 12, 2026 | Other(SR) | Proposed residential rooftop solar PV system consisting of 8 roof-mounted solar panels with a total capacity of 4 kW, combined with a 27 kWh battery energy storage system (Tesla Powerwall 3 + Expansion). | $50K | Closed |
| Apr 20, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to an existing 3 storey SFD-semi dwelling. | — | Open |
| Apr 17, 2026 | Addition(s) | Revision 1: The project will consist of the construction of a one storey addition on the west side and a one storey addition on the east side of the existing one storey Arena Building, and add a Level 2 in the existing Arena Building. The Project will contain a gymnasijm and fitness facilitiues in a | — | Open |
| Feb 2, 2026 | Party Wall Admin Permits | Proposal for party wall admin permit to 136 Farnham Ave | $1K | Open |
| Feb 2, 2026 | Interior Alterations | Rev 01: changes to basement and second floor layouts, new underpinning added to scopeProposal for interior alterations to an existing 3 storey SFD-semi dwelling. | — | Open |
| Jan 27, 2026 | Building Permit Related (DR) | Drain - Proposal for interior alterations to an existing 3 storey SFD-semi dwelling. | — | Open |
| Jan 20, 2026 | Sign Building Permit Related | 2 Wall Sign | — | Closed |
| Jan 16, 2026 | Building Permit Related (DR) | Drain - Proposal for interior alterations to second floor. | — | Open |
| Jan 16, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to second floor. | — | Open |
| Jan 16, 2026 | Interior Alterations | Proposal for interior alterations to second floor. | $230K | Open |
| Dec 16, 2025 | Interior Alterations | Proposal for interior alterations | $230K | Closed |
| Dec 16, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations | — | Closed |
| Nov 28, 2025 | Multiple Projects | Proposal for 2 storey rear addition to existing 3 storey SFD | $20K | Open |
| Sep 25, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to an existing 3 storey SFD-semi dwelling. | — | Open |
| Jul 14, 2025 | Building Permit Related(PS) | Plumbing - Proposal for Interior Alterations to an existing SFD-detached dwelling. | — | Open |
| May 8, 2025 | Sprinklers | Proposal to install overhead wet sprinkler system in a new health & wellness centre of a college | $350K | Closed |
| Feb 28, 2025 | Other(BA) | Proposed installing joining door between two residential adjacent condo units 410 and 412 | $5K | Closed |
| Feb 28, 2025 | Other(BA) | Proposed installing joining door between two residential adjacent condo units 410 and 412 | $5K | Closed |
| Feb 20, 2025 | Building Permit Related (DR) | Drain - Proposal to perform interior alterations (stair, guard, rail and general restoration). | — | Open |
| Feb 20, 2025 | Building Permit Related(PS) | Plumbing - Proposal to perform interior alterations (stair, guard, rail and general restoration). | — | Open |
| Feb 20, 2025 | Interior Alterations | Proposal to perform interior alterations (stair, guard, rail and general restoration). | $50K | Open |
| Aug 19, 2024 | Back Water Valve (Sewer only) | Proposed backwater valve installation. | — | Open |
| Aug 17, 2024 | Back Water Valve (Sewer only) | Back Water Valve | — | Open |
| Aug 13, 2024 | Multiple Projects | REVISION#1: TO THE REAR YARD DECKProposed two storey addition (119.99 m2 ) and proposed interior alterations (257 m2) | — | Closed |
| Aug 12, 2024 | Site Service | Modifying existing and adding new catch basins, manholes and pipe as per the attached plumbing data sheet and civil drawings | $100K | Open |
| May 14, 2024 | Building Permit Related(MS) | HVAC - Proposed two storey addition (119.99 m2 ) and proposed interior alterations (257 m2) | — | Closed |
| Mar 18, 2024 | New Building | IAN AIR STRUCTURE TO COVER THE SPORTS COURT THIS IS TEMPORARY(Maximum 26 weeks in place) | $500K | New build |
| Feb 21, 2024 | Building Permit Related (DR) | Drain - The project will consist of the construction of a one storey addition on the west side and a one storey addition on the east side of the existing one storey Arena Building, and add a Level 2 in the existing Arena Building. The Project will contain a gymnasijm and fitness facilitiues in addti | — | Closed |
| Feb 21, 2024 | Building Permit Related(PS) | Plumbing - The project will consist of the construction of a one storey addition on the west side and a one storey addition on the east side of the existing one storey Arena Building, and add a Level 2 in the existing Arena Building. The Project will contain a gymnasijm and fitness facilitiues in ad | — | Closed |
| Feb 21, 2024 | Building Permit Related(MS) | HVAC - The project will consist of the construction of a one storey addition on the west side and a one storey addition on the east side of the existing one storey Arena Building, and add a Level 2 in the existing Arena Building. The Project will contain a gymnasijm and fitness facilitiues in addtio | — | Closed |
The 40 most recent of 442 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.