Building permits on Lake Shore Blvd E

The City of Toronto has 824 building permits on record for Lake Shore Blvd E, going back to 1988. Those permits created 23 homes and removed 0, a net change of +23. Declared construction value totals $714.2M. Half of the 755 permits issued here came through within 49 days of the application. The most recent permit was issued Sep 25, 2026 at 259 Lake Shore Blvd E.

Permits on record
8241988–2026
Declared construction value
$714.2Mas filed, not adjusted
Homes created
23dwelling units
Homes removed
0net +23
Typical wait
49 days22 days slower than the city

Permits issued per year

20002026 (part year)

Zoning

Most common zone
R66.8% of permits · by-law 10.10
In detached-house zones
0.0%38.0% below the city’s 38.0%
Permits with a zone
343of 824 on record
  • Residential229 · 67%
  • Employment Industrial111 · 32%
  • Open Space3 · 1%

The zoning categories the permits on Lake Shore Blvd E fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Most common work

Structures worked on

Postal areas

Where this street runs

Other streets in M4L

Queen St E5,175 permits
Gerrard St E3,058 permits
Rhodes Ave813 permits
Kenilworth Ave709 permits
Waverley Rd702 permits
Woodfield Rd562 permits
Ashdale Ave524 permits
Hastings Ave427 permits

Looking for one address on Lake Shore Blvd E? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Sep 25, 2026 Shoring Shoring and Excavation for the purpose of remediation $1.0M Open
Aug 7, 2026 Electromagnetic Locks Proposal to install eight (8) electromagnetic locks. $30K Open
Jul 22, 2026 Interior Alterations Proposed interior alterations and change of use from office to event space (D to A2 Occupancy), including washroom, lighting, and finishes. Maximum Occupant Load = 918 persons $1.0M Open
Jul 22, 2026 Building Permit Related(MS) HVAC - Proposed interior alterations and change of use from office to event space, including washroom, lighting, and finishes. — Open
Jul 22, 2026 Building Permit Related(PS) Plumbing - Proposed interior alterations and change of use from office to event space, including washroom, lighting, and finishes. — Open
May 25, 2026 Building Permit Related (DR) REVISION 01: PROPOSED REVISIONS AND CHANGE IN CONSULTANTSDrain - Proposal to construct 3 new buildings - Building "B2' which consists of 182 dwelling units, 14 storey's, and retail at grade. Building "C+G" consists of one 49 storey and 15 storey combined building with 591 dwelling units and retail a — Open
May 25, 2026 Building Permit Related(PS) REVISION 01: PROPOSED REVISIONS AND CHANGE IN CONSULTANTSPlumbing - Proposal to construct 3 new buildings - Building "B2' which consists of 182 dwelling units, 14 storey's, and retail at grade. Building "C+G" consists of one 49 storey and 15 storey combined building with 591 dwelling units and retai — Open
May 25, 2026 New Building Conditional Permit - Proposal to construct 3 new buildings - Building "B2' which consists of 182 dwelling units, 14 storey's, and retail at grade. Building "C+G" consists of one 49 storey and 15 storey combined building with 591 dwelling units and retail at grade, and Building "F" which consists of — New build
May 21, 2026 Building Permit Related(MS) HVAC - Renovation to an existing classroom and office spaces for the Université de l'Ontario français. — Closed
May 20, 2026 Interior Alterations Renovation to an existing classroom and office spaces for the Université de l'Ontario français. $10K Closed
May 19, 2026 Interior Alterations Proposal for interior alteration (altering and existing laundry to bathroom) $5K Open
May 19, 2026 Building Permit Related(PS) Plumbing - Proposal for interior alteration (altering and existing laundry to bathroom) — Open
May 6, 2026 Shoring Proposal to install perimeter shoring and excavate all contaminated soil (full depth excavation) $8.5M Open
Apr 29, 2026 Unspecified Deferred Fees from folder 19 173743 (RSN-4593388) ZoningProcess RSN 62721912 — Open
Mar 12, 2026 Demolition Demolition of existing washroom building for the park and replace with 2 new prefabricated washrooms. — Demolition
Mar 6, 2026 Sign Building Permit Related 1 GROUND SIGN**MAYFAIR CLUBS** — Closed
Feb 24, 2026 Demolition Proposal for demolition of the existing buildings located at 259 & 291 Lakeshore Blvd E. — Demolition
Dec 12, 2025 Sign Building Permit Related 1 GROUND SIGN**MAYFAIR CLUBS** — Closed
Dec 10, 2025 Sign Building Permit Related 1 GROUND SIGN**MAYFAIR CLUBS** — Closed
Nov 13, 2025 Building Permit Related(MS) HVAC - Modification of maintenance access ladders and platforms, heat tracing toroof edge, provision of a hoist. — Open
Nov 13, 2025 Interior Alterations Modification of maintenance access ladders and platforms, heat tracing toroof edge, provision of a hoist. $2.0M Open
Sep 9, 2025 Site Service Proposal for: -Grading and drainage adjustments, including the removal of the existing catch basin, installation of sub-drains, and a new catch basin.- Replacement of concrete curb and installation of a new concrete pad to facilitate access to the new substation.- Construct a fenced concrete slab wi $5.0M Open
Aug 26, 2025 Building Permit Related(PS) Plumbing - Proposed change of use to convert existing workshop into a two-storey offiuce building. — Closed
Aug 26, 2025 Building Permit Related(MS) HVAC - Proposed change of use to convert existing workshop into a two-storey offiuce building. — Closed
Aug 26, 2025 Multiple Projects Proposed change of use to convert existing workshop into a two-storey office building by creating a second-level. — Open
Jun 27, 2025 Back Water Valve (Sewer only) Proposal to install a backwater valve on the sanitary line in existing SFD-townhouse. — Open
Apr 29, 2025 Building Permit Related(PS) Plumbing - Proposing the temporary use of two trailers in the designated trailer parking area to serve as an office and a laboratory. One trailer will function as the office, while the other will be utilized as the lab. This arrangement will remain in place until the building renovations are complet — Open
Apr 29, 2025 Building Permit Related(MS) HVAC - Proposing the temporary use of two trailers in the designated trailer parking area to serve as an office and a laboratory. One trailer will function as the office, while the other will be utilized as the lab. This arrangement will remain in place until the building renovations are completed, — Open
Apr 29, 2025 Trailers Proposing the temporary use of two trailers in the designated trailer parking area to serve as an office and a laboratory. One trailer will function as the office, while the other will be utilized as the lab. This arrangement will remain in place until the building renovations are completed, ensurin — Open
Apr 8, 2025 Partial Permit - Structural Framing Conditional Permit - Part Permit - Proposal to construct 3 new buildings - Building "B2' which consists of 182 dwelling units, 14 storey's, and retail at grade. Building "C+G" consists of one 49 storey and 15 storey combined building with 591 dwelling units and retail at grade, and Building "F" whic — Closed
Apr 8, 2025 Building Permit Related(MS) HVAC - Proposal to construct 3 new buildings - Building "B2' which consists of 182 dwelling units, 14 storey's, and retail at grade. Building "C+G" consists of one 49 storey and 15 storey combined building with 591 dwelling units and retail at grade, and Building "F" which consists of 374 dwelling u — Open
Mar 18, 2025 Building Permit Related(PS) Plumbing - Interior alterations for steam room, washroom and shower area — Closed
Mar 18, 2025 Building Permit Related(MS) HVAC - Interior alterations for steam room, washroom and shower area — Closed
Mar 18, 2025 Interior Alterations Interior alterations for steam room, washroom and shower area, $300K Closed
Jan 21, 2025 Fire Alarm Proposal for Fire Alarm Panel Update FX-2000 Mircom to FX-4000 Mircom-All zones remain the same. $7K Closed
Nov 20, 2024 Building Permit Related(PS) Plumbing - proposal for interio alterations to existing washroom and office area — Closed
Nov 4, 2024 Site Service Install site services in connection with subdivision application for a new Public Park. $1.0M Open
Oct 7, 2024 Electromagnetic Locks REVISION 01: one additional mag lock at ground floor level to serve the building Proposed installation of two (2) maglocks on gound level and one (1) on 12th level REVISED (refer to buble on sheet number E000)1 - MAG-LOCK ON P1 (ARCHITECTURAL DOOR P1-04B)2 - MAG-LOCKS ON GROUND FLOOR (ARCHITECTURAL — Closed
Sep 23, 2024 Interior Alterations Revision to pool detailsRevision 01:Revision to building permit 21 249872 to include additional electrical work to support interior fit up work. Interior fit up by owner for new fitness facility, swimming pool and related HVAC and PLB - Level 2 of mixed use building - Sugar Wharf Fitness Center — Closed
Sep 13, 2024 Building Permit Related(PS) Plumbing - Proposal for interior alterations for a dental office — Closed

The 40 most recent of 824 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Lake Shore Blvd E with a permit on record · 82

  • 0 Lake Shore Blvd E4 permits · to 2025
  • 55 Lake Shore Blvd E105 permits · to 2026
  • 95 Lake Shore Blvd E2 permits · to 2024
  • 125 Lake Shore Blvd E4 permits · to 2006
  • 143 Lake Shore Blvd E50 permits · to 2026
  • 215 Lake Shore Blvd E16 permits · to 2026
  • 259 Lake Shore Blvd E14 permits · to 2026
  • 291 Lake Shore Blvd E17 permits · to 2021
  • 307 Lake Shore Blvd E21 permits · to 2026
  • 351 Lake Shore Blvd E5 permits · to 2020
  • 470 Lake Shore Blvd E1 permit · to 2024
  • 480 Lake Shore Blvd E5 permits · to 2018
  • 520 Lake Shore Blvd E5 permits · to 2020
  • 570 Lake Shore Blvd E1 permit · to 2021
  • 685 Lake Shore Blvd E7 permits · to 2024
  • 750 Lake Shore Blvd E4 permits · to 2018
  • 755 Lake Shore Blvd E4 permits · to 2026
  • 801 Lake Shore Blvd E27 permits · to 2026
  • 805 Lake Shore Blvd E5 permits · to 2005
  • 829 Lake Shore Blvd E6 permits · to 2021
  • 915 Lake Shore Blvd E6 permits · to 2022
  • 945 Lake Shore Blvd E6 permits · to 2022
  • 1015 Lake Shore Blvd E55 permits · to 2025
  • 1025 Lake Shore Blvd E40 permits · to 2024
  • 1313 Lake Shore Blvd E133 permits · to 2025
  • 1561 Lake Shore Blvd E11 permits · to 2025
  • 1590 Lake Shore Blvd E3 permits · to 2014
  • 1675 Lake Shore Blvd E37 permits · to 2024
  • 1681 Lake Shore Blvd E1 permit · to 2019
  • 1792 Lake Shore Blvd E3 permits · to 2007
  • 1794 Lake Shore Blvd E2 permits · to 2006
  • 1796 Lake Shore Blvd E3 permits · to 2006
  • 1798 Lake Shore Blvd E2 permits · to 2006
  • 1800 Lake Shore Blvd E2 permits · to 2006
  • 1802 Lake Shore Blvd E4 permits · to 2008
  • 1804 Lake Shore Blvd E4 permits · to 2016
  • 1806 Lake Shore Blvd E3 permits · to 2006
  • 1808 Lake Shore Blvd E3 permits · to 2006
  • 1810 Lake Shore Blvd E2 permits · to 2006
  • 1816 Lake Shore Blvd E5 permits · to 2003
  • 1818 Lake Shore Blvd E5 permits · to 2003
  • 1820 Lake Shore Blvd E5 permits · to 2003
  • 1822 Lake Shore Blvd E7 permits · to 2017
  • 1824 Lake Shore Blvd E5 permits · to 2003
  • 1826 Lake Shore Blvd E5 permits · to 2003
  • 1828 Lake Shore Blvd E5 permits · to 2003
  • 1830 Lake Shore Blvd E5 permits · to 2003
  • 1832 Lake Shore Blvd E5 permits · to 2003
  • 1834 Lake Shore Blvd E5 permits · to 2003
  • 1836 Lake Shore Blvd E5 permits · to 2003
  • 1838 Lake Shore Blvd E5 permits · to 2003
  • 1840 Lake Shore Blvd E5 permits · to 2003
  • 1842 Lake Shore Blvd E5 permits · to 2003
  • 1844 Lake Shore Blvd E5 permits · to 2003
  • 1846 Lake Shore Blvd E6 permits · to 2016
  • 1848 Lake Shore Blvd E5 permits · to 2003
  • 1850 Lake Shore Blvd E5 permits · to 2003
  • 1852 Lake Shore Blvd E5 permits · to 2003
  • 1854 Lake Shore Blvd E5 permits · to 2003
  • 1856 Lake Shore Blvd E5 permits · to 2003
  • 1858 Lake Shore Blvd E5 permits · to 2003
  • 1860 Lake Shore Blvd E5 permits · to 2003
  • 1862 Lake Shore Blvd E5 permits · to 2003
  • 1864 Lake Shore Blvd E5 permits · to 2003
  • 1866 Lake Shore Blvd E5 permits · to 2003
  • 1868 Lake Shore Blvd E5 permits · to 2003
  • 1870 Lake Shore Blvd E5 permits · to 2003
  • 1872 Lake Shore Blvd E4 permits · to 2017
  • 1874 Lake Shore Blvd E3 permits · to 2000
  • 1876 Lake Shore Blvd E3 permits · to 2000
  • 1878 Lake Shore Blvd E3 permits · to 2000
  • 1880 Lake Shore Blvd E3 permits · to 2000
  • 1882 Lake Shore Blvd E4 permits · to 2010
  • 1884 Lake Shore Blvd E3 permits · to 2000
  • 1886 Lake Shore Blvd E3 permits · to 2000
  • 1888 Lake Shore Blvd E4 permits · to 2012
  • 1890 Lake Shore Blvd E4 permits · to 2016
  • 1892 Lake Shore Blvd E4 permits · to 2014
  • 1894 Lake Shore Blvd E8 permits · to 2021
  • 1896 Lake Shore Blvd E3 permits · to 2000
  • 1898 Lake Shore Blvd E6 permits · to 2026
  • 1900 Lake Shore Blvd E3 permits · to 2000
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
824
Data through
2026-10-29
Refresh
Daily from the City
Sheet
STR-666