Postal area · 94 of 98 by permit count
Building permits in M5E
The City of Toronto has 2,817 building permits on record for the M5E postal area, going back to 1989. Those permits created 1,973 homes and removed 0, a net change of +1,973. Declared construction value totals $1.1B. The most recent permit was applied for Sep 9, 2026 at 42 Colborne St.
- Permits on record
- 2,8171989–2026
- Declared construction value
- $1.1Bas filed, not adjusted
- Homes created
- 1,973dwelling units
- Homes removed
- 0net +1,973
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Sep 9, 2026 | 42 Colborne St | Sprinklers | Proposed sprinkler design drawings including hydraulic calculations for interior alteration for golf simulator facility with restaurant and bar. Related to permit # 26-194927 BLD 00 BA | $150K | Open |
| Sep 9, 2026 | 47 Colborne St | Fire Damage | Revision 01 - structural repairs/replacement of floor joists.Proposed repairs to base building provisions following a fire. No extension or addition. | — | Open |
| Sep 4, 2026 | 41 Front St E | Building Permit Related(PS) | Plumbing - Proposal for interior alterations for tenant fit out to existing unit. Unit 300 | — | Open |
| Sep 4, 2026 | 41 Front St E | Interior Alterations | Proposal for interior alterations for tenant fit out to existing unit. Unit 300 | $2.4M | Open |
| Sep 4, 2026 | 1 Front St E | Certified Tents | Proposed installation of ONE 30'x45' temporary tent (Cert # 25 135 938) for an event. Tent will be anchored by concrete weights. Install is Sept 21st and removal is Sept 24th. Event is Sept 23rd. | — | Open |
| Sep 4, 2026 | 41 Front St E | Building Permit Related(MS) | HVAC - Proposal for interior alterations for tenant fit out to existing unit. Unit 300 | — | Open |
| Sep 3, 2026 | 2A Church St | Building Permit Related(PS) | Plumbing Revision 01 - Revision for the extanded natural gas piping to connect CP-43 NG Generator at 2 Church St and the existing natural gas distribution system to the proposed new Enbridge gas station----------------------------------------------------------Revision: Application for permit revisio | — | Open |
| Sep 1, 2026 | 47 Colborne St | Interior Alterations | Repairs to base building provisions following a fire. No extension or addition. Fit-up work to be submitted by others - restaurant. Convenience address is 45 Colborne St | $50K | Open |
| Aug 27, 2026 | 18 Yonge St | Other(PS) | Kitec piping replacement | $6K | Open |
| Aug 26, 2026 | 42 Colborne St | Building Permit Related(MS) | HVAC - Proposed interior alterations to convert existing restaurant to lounge. | — | Open |
| Aug 26, 2026 | 18 Yonge St | Other(PS) | Proposed kitec piping replacement | $6K | Open |
| Aug 26, 2026 | 42 Colborne St | Building Permit Related(PS) | Plumbing - Proposed interior alterations to convert existing restaurant to lounge. | — | Open |
| Aug 26, 2026 | 42 Colborne St | Interior Alterations | Proposed interior alterations to convert existing retail space to golf simulator facility with restaurant and bar.Base building permit is under 65 King St E. GK | $1.5M | Open |
| Aug 25, 2026 | 1 Yonge St | Building Permit Related(MS) | REV 01: to add office space, commercial/retail units and self-storage lockers. HVAC - Proposal for demolition of 5 storey podium component of the Toronto Star Building. (39671 Sq.M) Renovation for the tower component including patch work floors 1-5, and relocate mechanical penthouse to the roof of t | — | Open |
| Aug 24, 2026 | 33 Yonge St | Building Permit Related(PS) | Plumbing - Interior alterations to an existing office suite, including the demolition and construction of interior partitions and ceilings, construction of new offices and a kitchen, and associated HVAC modifications. | — | Open |
| Aug 24, 2026 | 33 Yonge St | Building Permit Related(MS) | HVAC - Interior alterations to an existing office suite, including the demolition and construction of interior partitions and ceilings, construction of new offices and a kitchen, and associated HVAC modifications. | — | Open |
| Aug 19, 2026 | 33 Yonge St | Interior Alterations | Interior alterations to an existing office suite, including the demolition and construction of interior partitions and ceilings, construction of new offices and a kitchen, and associated HVAC modifications. | $300K | Open |
| Aug 18, 2026 | 1 Yonge St | Building Permit Related(PS) | Plumbing - Toronto Star Building Renovation (Phase 2) includes proposed parking structural (Level 2-4), and gounod level retails | — | Open |
| Aug 18, 2026 | 1 Yonge St | Building Permit Related(MS) | HVAC - Toronto Star Building Renovation (Phase 2) includes proposed parking structural (Level 2-4), and gounod level retails | — | Open |
| Aug 17, 2026 | 1 Yonge St | Multiple Projects | Toronto Star Building Renovation (Phase 2) includes proposed parking structural (Level 2-4), and gounod level retails | $1.0M | Open |
| Aug 12, 2026 | 33 Yonge St | Building Permit Related(MS) | HVAC - Proposal for interior alterations to demolition of existing walls, doors and ceiling; new finishes, interior walls and doors (including suite entrance), plumbing, mechanical, electrical, and lighting to convert Drycleaners into a Golf Simulator. Unit 105. | — | Open |
| Aug 12, 2026 | 33 Yonge St | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to demolition of existing walls, doors and ceiling; new finishes, interior walls and doors (including suite entrance), plumbing, mechanical, electrical, and lighting to convert Drycleaners into a Golf Simulator. Unit 105. | — | Open |
| Aug 12, 2026 | 33 Yonge St | Interior Alterations | Proposal for interior alterations to demolition of existing walls, doors and ceiling; new finishes, interior walls and doors (including suite entrance), plumbing, mechanical, electrical, and lighting to convert Drycleaners into a Golf Simulator. Unit 105. | $33K | Open |
| Aug 11, 2026 | 67 Front St E | Interior Alterations | Proposed interior alterations for tenant fit-out to change use from night club to pod hotel. Scope of work includes new washrooms, lounge, and sleeping area. | $500K | Open |
| Aug 7, 2026 | 80 Front St E | Building Permit Related(PS) | Plumbing - Interior residential renovation to existing residential condo. Moving existing Washer/Dryer to new closet, renovate upper bathroom, infill floor where open. | — | Open |
| Aug 7, 2026 | 80 Front St E | Interior Alterations | Interior residential renovation to existing residential condo. Moving existing Washer/Dryer to new closet, renovate upper bathroom, infill floor where open. | $50K | Open |
| Aug 7, 2026 | 80 Front St E | Building Permit Related(MS) | HVAC - Interior residential renovation to existing residential condo. Moving existing Washer/Dryer to new closet, renovate upper bathroom, infill floor where open. | — | Open |
| Aug 4, 2026 | 47 Colborne St | Fire Damage | Repairs to base building provisions following a fire. No extension or addition. Fit-up work to be submitted by others - restaurantConvenience address is 45 Colborne St | — | Closed |
| Aug 4, 2026 | 33 Yonge St | Sprinklers | Replacement of the existing P1 and P2 level dry sprinkler distribution piping and sprinklers due to age and condition. Existing valves to remain. | $200K | Open |
| Jul 31, 2026 | 33 Yonge St | Other(MS) | Adding split AC unit in P1 level storage room. | $20K | Open |
| Jul 28, 2026 | 8 Market St | Other(BA) | Exterior brick wall repairs | $450K | Open |
| Jul 21, 2026 | 69 Yonge St | Building Permit Related(MS) | HVAC - Proposed interior alteration - renovation consists of the interior conversion of an existing office building into a 162-key Marriott hotel. The existing ground-floor retail spaces will remain as-is, with no modifications to their current use or layout. | — | Open |
| Jul 21, 2026 | 69 Yonge St | Building Permit Related(PS) | Plumbing - Proposed interior alteration - renovation consists of the interior conversion of an existing office building into a 162-key Marriott hotel. The existing ground-floor retail spaces will remain as-is, with no modifications to their current use or layout. | — | Open |
| Jul 17, 2026 | 48 Yonge St | Building Permit Related(MS) | Revision 1: Layout of new walls revised throughout scope of workHVAC - Proposal for interior alterations to demo existing office space, construction of new layout. | — | Open |
| Jul 16, 2026 | 69 Yonge St | Interior Alterations | Proposed interior alteration - renovation consists of the interior conversion of an existing office building into a 162-key Marriott hotel. The existing ground-floor retail spaces will remain as-is, with no modifications to their current use or layout. | $1K | Open |
| Jul 16, 2026 | 1 Yonge St | Building Permit Related(PS) | REV 01: to add office space, commercial/retail units and self-storage lockers. Plumbing - Proposal for demolition of 5 storey podium component of the Toronto Star Building. (39671 Sq.M) Renovation for the tower component including patch work floors 1-5, and relocate mechanical penthouse to the roof | — | Open |
| Jul 16, 2026 | 25 The Esplanade | Garage Repair/Reconstruction | Parking Garage Repairs at 25, 35 & 45 The Esplanade. | $7.9M | Open |
| Jul 6, 2026 | 18 Yonge St | Other(PS) | Kitec piping replacement for Unit 3009 | $6K | Closed |
| Jun 29, 2026 | 44 Wellington St E | Sprinklers | Proposed Interior alterations to an existing restaurant on the ground floor - FSU sprinkler work associated w/ permit no. 25 249567 BLD 00 BA | $500K | Open |
| Jun 22, 2026 | 6 Church St | Building Permit Related(MS) | HVAC - Proposed Pet Wash Store (Goup A2 to Group D) | — | Open |
The 40 most recent of 2,817 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.