Street · 354 of 8,516 by permit count
Building permits on Hastings Ave
The City of Toronto has 427 building permits on record for Hastings Ave, going back to 1993. Those permits created 16 homes and removed 8, a net change of +8. Declared construction value totals $13.1M. Half of the 411 permits issued here came through within 13 days of the application. The most recent permit was applied for Oct 8, 2026 at 65 Hastings Ave.
- Permits on record
- 4271993–2026
- Declared construction value
- $13.1Mas filed, not adjusted
- Homes created
- 16dwelling units
- Homes removed
- 8net +8
- Typical wait
- 13 days14 days faster than the city
Permits issued per year
Zoning
- Most common zone
- R100.0% of permits · by-law 10.10
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 422of 427 on record
The zoning categories the permits on Hastings Ave fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M4L
Looking for one address on Hastings Ave? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 8, 2026 | Second Suite (New) | Proposal to add a kitchen to an existing finished basement. Convert existing basement to a second suite. | $6K | Open |
| Oct 8, 2026 | Building Permit Related(PS) | Plumbing - Proposal to add a kitchen to an existing finished basement. | — | Open |
| Sep 28, 2026 | New Laneway / Rear Yard Suite | Proposal to construct a new 2 storey laneway suite in the rear yard. | $75K | Open |
| Sep 16, 2026 | Second Suite (New) | Application to have the existing living area within basement designated as a secondary suite. | $6K | Closed |
| Sep 14, 2026 | Interior Alterations | REV01: Proposed widening of the rear entrance opening.Proposed interior alterations for remodeling the 1st Floor | — | Open |
| Sep 10, 2026 | New Laneway / Rear Yard Suite | NEW CONSTRUCTION OF A 2-STOREY LANEWAY SUITE | $100K | Open |
| Sep 10, 2026 | Building Permit Related (DR) | Drain - NEW CONSTRUCTION OF A 2-STOREY LANEWAY SUITE | — | Open |
| Sep 10, 2026 | Building Permit Related(MS) | HVAC - NEW CONSTRUCTION OF A 2-STOREY LANEWAY SUITE | — | Open |
| Sep 10, 2026 | Building Permit Related(PS) | Plumbing - NEW CONSTRUCTION OF A 2-STOREY LANEWAY SUITE | — | Open |
| Sep 2, 2026 | Building Permit Related(MS) | Revision 01: Mechanical HVAC system revised to electrical ducted heat pump instead of ductless heatpump and ducted ERVHVAC - Proposed new detached laneway suite with garage. | — | Open |
| Sep 1, 2026 | Demolition | Proposed demolish existing SFD detached for new construction of 2 storey SFD detached with basement walkout | — | Demolition |
| Sep 1, 2026 | Building Permit Related(PS) | Plumbing - Proposed demolish existing SFD detached for new construction of 2 storey SFD detached with basement walkout | — | Open |
| Sep 1, 2026 | Building Permit Related(MS) | HVAC - Proposed demolish existing SFD detached for new construction of 2 storey SFD detached with basement walkout | — | Open |
| Sep 1, 2026 | Building Permit Related (DR) | Drain - Proposed demolish existing SFD detached for new construction of 2 storey SFD detached with basement walkout | — | Open |
| Sep 1, 2026 | New Building | Proposed demolish existing SFD detached for new construction of 2 storey SFD detached with basement walkout | $1.0M | New build |
| Jun 11, 2026 | Deck | Proposal to reconstruct the front deck | $20K | Closed |
| May 29, 2026 | Back Water Valve (Sewer only) | Install stand alone Backwater Valve | — | Closed |
| Jan 19, 2026 | Party Wall Admin Permits | Proposal for admin permit for work related to 136 hastings ave | $1K | Open |
| Jan 15, 2026 | Building Permit Related (DR) | Drain - Proposal to underpin the existing basement, remove and build a new walk-up, deck, steps and add a bathroom on the second floor | — | Closed |
| Jan 15, 2026 | Building Permit Related(PS) | Plumbing - Proposal to underpin the existing basement, remove and build a new walk-up, deck, steps and add a bathroom on the second floor | — | Closed |
| Jan 15, 2026 | Multiple Projects | Proposal to underpin the existing basement, remove and build a new walk-up, deck, steps and add a bathroom on the second floor | $200K | Open |
| Dec 19, 2025 | Back Water Valve (Sewer only) | Proposal to install Back Water Valve | — | Closed |
| Dec 5, 2025 | Building Permit Related(MS) | HVAC - PROPOSED INTERIOR ALTERATIONS TO BASEMENT, GROUND, AND SECOND FLOOR | — | Open |
| Oct 1, 2025 | Building Permit Related (DR) | Drain - Proposed new detached laneway suite with garage. | — | Open |
| Sep 25, 2025 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to remove wall on main floor and interior renovations. | — | Closed |
| Sep 22, 2025 | Interior Alterations | Proposed interior alterations to remove wall on main floor and interior renovations. | $20K | Closed |
| Sep 18, 2025 | Building Permit Related(MS) | HVAC - Proposed to construct single storey rear addition to existing house | — | Closed |
| Aug 13, 2025 | Building Permit Related (DR) | Drain - PROPOSED INTERIOR ALTERATIONS TO BASEMENT, GROUND, AND SECOND FLOOR | — | Closed |
| Aug 12, 2025 | Interior Alterations | PROPOSED INTERIOR ALTERATIONS TO BASEMENT, GROUND, AND SECOND FLOOR | $70K | Closed |
| Aug 12, 2025 | Building Permit Related(PS) | Plumbing - PROPOSED INTERIOR ALTERATIONS TO BASEMENT, GROUND AND SECOND FLOOR | — | Closed |
| Aug 12, 2025 | New Laneway / Rear Yard Suite | REV 01 - Changes to the exterior wall assembly including insulation, changes in floor level heights, increase in maximum height of the ancillary building, new rear West door, changes to the interior stairs & changes to the 2nd floor layout.Proposed new detached laneway suite with garage. | — | Open |
| Jun 18, 2025 | Back Water Valve (Sewer only) | Installation of Backwater valve. | — | Closed |
| May 15, 2025 | Addition(s) | REV 01: Revised layout to the west portion of the basement and main floor/.Proposed to construct single storey rear addition to existing house | — | Closed |
| May 9, 2025 | Back Water Valve (Sewer only) | Proposal for installation of backwater valve. | — | Closed |
| Jan 9, 2025 | Porch | Proposal for porch (to issue permit of a portion of deck that was built in 2012 without a permit) | $5K | Open |
| Dec 20, 2024 | Deck | Proposed new covered deck to the existing single family dwelling. | $20K | Closed |
| Dec 6, 2024 | Building Permit Related(PS) | Plumbing - Proposed to construct single storey rear addition to existing house | — | Closed |
| Oct 24, 2024 | Deck | Proposed new covered deck to the existing single family dwelling. | $20K | Closed |
| Oct 11, 2024 | Deck | Proposed new covered deck to the existing single family dwelling. | $20K | Closed |
| Sep 4, 2024 | Porch | Proposed front lawn landscaping and extension of front porch. | $20K | Closed |
The 40 most recent of 427 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Hastings Ave with a permit on record · 121
- 12 Hastings Ave1 permit · to 2026
- 13 Hastings Ave3 permits · to 2018
- 14 Hastings Ave1 permit · to 2012
- 15 Hastings Ave7 permits · to 2017
- 16 Hastings Ave1 permit · to 2014
- 17 Hastings Ave7 permits · to 2017
- 19 Hastings Ave6 permits · to 2003
- 21 Hastings Ave1 permit · to 2019
- 23 Hastings Ave2 permits · to 1999
- 24 Hastings Ave3 permits · to 2022
- 27 Hastings Ave1 permit · to 2010
- 28 Hastings Ave1 permit · to 2016
- 30 Hastings Ave3 permits · to 2020
- 31 Hastings Ave12 permits · to 2024
- 34 Hastings Ave7 permits · to 2022
- 35 Hastings Ave2 permits · to 2025
- 36 Hastings Ave5 permits · to 2010
- 38 Hastings Ave3 permits · to 2018
- 40 Hastings Ave3 permits · to 2025
- 41 Hastings Ave3 permits · to 2015
- 43 Hastings Ave2 permits · to 2025
- 46 Hastings Ave5 permits · to 2018
- 47 Hastings Ave3 permits · to 2004
- 48 Hastings Ave1 permit · to 2016
- 50 Hastings Ave5 permits · to 2019
- 51 Hastings Ave3 permits · to 2015
- 52 Hastings Ave2 permits · to 2015
- 56 Hastings Ave8 permits · to 2016
- 57 Hastings Ave2 permits · to 2010
- 58 Hastings Ave5 permits · to 2016
- 59 Hastings Ave5 permits · to 2016
- 60 Hastings Ave5 permits · to 2016
- 61 Hastings Ave1 permit · to 2008
- 63 Hastings Ave3 permits · to 2018
- 65 Hastings Ave10 permits · to 2026
- 70 Hastings Ave1 permit · to 2024
- 71 Hastings Ave3 permits · to 2009
- 72 Hastings Ave2 permits · to 2026
- 73 Hastings Ave4 permits · to 2022
- 74 Hastings Ave4 permits · to 2012
- 76 Hastings Ave6 permits · to 2014
- 77 Hastings Ave4 permits · to 2016
- 78 Hastings Ave6 permits · to 2016
- 79 Hastings Ave7 permits · to 2020
- 80 Hastings Ave7 permits · to 2022
- 81 Hastings Ave4 permits · to 2021
- 82 Hastings Ave3 permits · to 2013
- 83 Hastings Ave5 permits · to 2017
- 84 Hastings Ave6 permits · to 2011
- 86 Hastings Ave1 permit · to 2010
- 88 Hastings Ave4 permits · to 2010
- 90 Hastings Ave9 permits · to 2026
- 94 Hastings Ave4 permits · to 2007
- 96 Hastings Ave20 permits · to 2026
- 98 Hastings Ave5 permits · to 2016
- 101 Hastings Ave1 permit · to 2000
- 102 Hastings Ave3 permits · to 2013
- 105 Hastings Ave7 permits · to 2015
- 106 Hastings Ave2 permits · to 2018
- 107 Hastings Ave5 permits · to 2020
- 109 Hastings Ave5 permits · to 2020
- 112 Hastings Ave1 permit · to 2005
- 132 Hastings Ave3 permits · to 2019
- 134 Hastings Ave1 permit · to 2026
- 135 Hastings Ave2 permits · to 2026
- 136 Hastings Ave3 permits · to 2026
- 137 Hastings Ave1 permit · to 2010
- 138 Hastings Ave4 permits · to 2017
- 139 Hastings Ave1 permit · to 2016
- 141 Hastings Ave3 permits · to 2016
- 144 Hastings Ave9 permits · to 2023
- 146 Hastings Ave1 permit · to 2020
- 147 Hastings Ave1 permit · to 2021
- 149 Hastings Ave3 permits · to 2012
- 150 Hastings Ave1 permit · to 2014
- 151 Hastings Ave1 permit · to 1997
- 160 Hastings Ave5 permits · to 2012
- 170 Hastings Ave3 permits · to 2021
- 172 Hastings Ave3 permits · to 2010
- 174 Hastings Ave1 permit · to 2026
- 175 Hastings Ave1 permit · to 2021
- 179 Hastings Ave2 permits · to 2021
- 180 Hastings Ave4 permits · to 2025
- 186 Hastings Ave2 permits · to 2014
- 188 Hastings Ave2 permits · to 2010
- 190 Hastings Ave6 permits · to 2025
- 191 Hastings Ave1 permit · to 2021
- 192 Hastings Ave7 permits · to 2020
- 193 Hastings Ave4 permits · to 2021
- 200 Hastings Ave1 permit · to 2025
- 201 Hastings Ave3 permits · to 2012
- 206 Hastings Ave4 permits · to 2010
- 208 Hastings Ave3 permits · to 2007
- 210 Hastings Ave1 permit · to 2012
- 214 Hastings Ave2 permits · to 2017
- 216 Hastings Ave1 permit · to 2016
- 217 Hastings Ave1 permit · to 2014
- 219 Hastings Ave3 permits · to 2015
- 242 Hastings Ave2 permits · to 2010
- 243 Hastings Ave3 permits · to 2017
- 244 Hastings Ave1 permit · to 2020
- 246 Hastings Ave9 permits · to 2023
- 247 Hastings Ave2 permits · to 2010
- 248 Hastings Ave5 permits · to 2023
- 249 Hastings Ave3 permits · to 2017
- 250 Hastings Ave10 permits · to 2024
- 254 Hastings Ave4 permits · to 2024
- 255 Hastings Ave3 permits · to 2016
- 258 Hastings Ave2 permits · to 2020
- 261 Hastings Ave1 permit · to 2025
- 263 Hastings Ave4 permits · to 2013
- 264 Hastings Ave4 permits · to 2015
- 265 Hastings Ave6 permits · to 2017
- 266 Hastings Ave1 permit · to 2016
- 268 Hastings Ave1 permit · to 2016
- 270 Hastings Ave2 permits · to 2016
- 271 Hastings Ave3 permits · to 2023
- 272 Hastings Ave5 permits · to 2024
- 273 Hastings Ave5 permits · to 2008
- 276 Hastings Ave4 permits · to 2022
- 278 Hastings Ave2 permits · to 2016