Street · 22 of 8,516 by permit count
Building permits on Front St W
The City of Toronto has 4,092 building permits on record for Front St W, going back to 1990. That is the 22nd busiest street in the city. Those permits created 4,139 homes and removed 0, a net change of +4,139. Declared construction value totals $2.7B. Half of the 3,834 permits issued here came through within 28 days of the application. The most recent permit was issued Oct 30, 2026 at 100 Front St W.
- Permits on record
- 4,0921990–2026
- Declared construction value
- $2.7Bas filed, not adjusted
- Homes created
- 4,139dwelling units
- Homes removed
- 0net +4,139
- Typical wait
- 28 days1 day slower than the city
Permits issued per year
Zoning
- Most common zone
- CRE58.2% of permits · by-law 50.10
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 1,396of 4,092 on record
The zoning categories the permits on Front St W fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Minor variances at the Committee of Adjustment
- Applications on record
- 24since 2016
Some projects on Front St W need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. How variances work, and the approval rates.
Most common work
Structures worked on
Postal areas
Where this street runs
Other streets in M5V
Looking for one address on Front St W? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 30, 2026 | Interior Alterations | Revision 02: adding new gypsum ceilings, revision of sprinkler layouts, addition of lighting, and the associated HVAC and electrical updates.Interior renovation of the retail corridor off of the east entrance at the lobby level. | — | Open |
| Oct 30, 2026 | Building Permit Related(PS) | Plumbing - Proposal for existing offices to be converted into office and broadcasting studios. | — | Open |
| Oct 30, 2026 | Building Permit Related(MS) | HVAC - Proposal for existing offices to be converted into office and broadcasting studios. | — | Open |
| Oct 30, 2026 | Alternative Solution | Proposal for alternative solution for the turnstiles for access control to meet the intent of the OBC for egress and barrier-free accessibility requirements | — | Open |
| Oct 30, 2026 | Fire Alarm | Proposed modernaization and replacement of the existing Fire Alarm Control Panel (FACP) serving two existing residential condominium buildings, | $50K | Open |
| Oct 30, 2026 | Interior Alterations | Proposal for existing offices to be converted into office and broadcasting studios. | $900K | Open |
| Oct 29, 2026 | Building Permit Related(PS) | Plumbing - Interior alterations for a new restaurant tenant fit-out, including associated HVAC and plumbing work. | — | Open |
| Oct 29, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to level 1, 07 and 08. | — | Open |
| Oct 29, 2026 | Temporary Structures | Proposal for one tiny pub and one pergola at the well open area, install date November 24th 2026 , tear down dates : November 30th 2026 | — | Open |
| Oct 29, 2026 | Interior Alterations | Proposal for interior alterations to level 1, 07 and 08. | $38.0M | Open |
| Oct 29, 2026 | Interior Alterations | Interior alterations for a new restaurant tenant fit-out, including associated HVAC and plumbing work. | $150K | Open |
| Oct 29, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to level 1, 07 and 08. | — | Open |
| Oct 29, 2026 | Building Permit Related(MS) | HVAC - Interior alterations for a new restaurant tenant fit-out, including associated HVAC and plumbing work. | — | Open |
| Oct 28, 2026 | Sprinklers | Proposed removal and installation of sprinklers on the 6th, 7th and 8th floors. | $241K | Open |
| Oct 28, 2026 | Fire Alarm | REV 03: Revision to permit due to change of height to sprinkler layout in the Truck Tunnel. REV 02 - Revision to sprinkler drawings - Revision to permit due to elevation change to sprinkler layout in the Truck Tunnel. REV 01 - Revision descriped in application formThe scope of work includes the remo | — | Open |
| Oct 28, 2026 | Other(BA) | Structural slab infill at openings on L4&6. | $300K | Open |
| Oct 28, 2026 | Building Permit Related(PS) | REV 01: Providing plumbing system design for the USEP building. Related to Main Building Permit 22 237137 BLD 00 NBPlumbing - Construction of new platforms, with canopies and vertical access elements, such as stairs and elevators and a new concourse area below the new platforms that will connect the | — | Open |
| Oct 28, 2026 | Fire Alarm | Proposed modernaization and replacement of the existing Fire Alarm Control Panel (FACP) serving two existing residential condominium buildings, | $50K | Open |
| Oct 27, 2026 | Electromagnetic Locks | Proposal to install twenty six (26) maglocks. Eight (8) on 2nd floor, Nine (9)on 3rd floor and Nine (9) on 4th floor. Please see the attached drawings # E-302, 303 & 304 on page # 5, 6 & 7 of 8. | $26K | Open |
| Oct 26, 2026 | Alternative Solution | Proposed alternative solution to permit the application of 3.13 of the OBC for the north and south open exterior platforms and to permit the platform clearance time of 4 min to be measured to a protected route on the platform due to extended platform lengths, travel time, and available platform egre | — | Open |
| Oct 26, 2026 | Temporary Structures | Proposal to erect temporary yurt structure for The Well. Set up on October 19, 2026 and Tear down on Mar 31, 2027. | — | Open |
| Oct 26, 2026 | Interior Alterations | REVISION - designate the patio as a private patio Proposal for interior alterations -Restaurant greater than 30 seats | — | Open |
| Oct 23, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to renovate office space at Unit 310. | — | Open |
| Oct 23, 2026 | Interior Alterations | Proposal for interior alterations to renovate office space at Unit 310. | $200K | Open |
| Oct 23, 2026 | Building Permit Related(MS) | REV 01: Providing heating, ventilation and air conditioning system design for the USEP building. Related to main building permit 22 237137 BLD 00 NBHVAC - Construction of new platforms, with canopies and vertical access elements, such as stairs and elevators and a new concourse area below the new pl | — | Open |
| Oct 23, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to renovate office space at Unit 310. | — | Open |
| Oct 22, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alteration | — | Open |
| Oct 22, 2026 | Interior Alterations | Proposal for interior alteration | $100K | Open |
| Oct 21, 2026 | Interior Alterations | INTERIOR ALTERATIONS TO EAST WING TOWER INCLUDING SUITES AND CORRIDORS | $49.0M | Open |
| Oct 21, 2026 | Building Permit Related(MS) | HVAC - INTERIOR ALTERATIONS TO EAST WING TOWER INCLUDING SUITES AND CORRIDORS | — | Open |
| Oct 21, 2026 | Building Permit Related(PS) | Plumbing - INTERIOR ALTERATIONS TO EAST WING TOWER INCLUDING SUITES AND CORRIDORS | — | Open |
| Oct 20, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to an existing restaurant - UNIT 105 | — | Open |
| Oct 20, 2026 | Interior Alterations | REV 01: Fire dampers removed from DCR rooms on levels 6, 7 and 8. Layout change on levels 6, 7, and 8, and associated mechanical and plumbing changes. Proposed interior alterations of existing offices on floors 6, 7 & 8. | — | Open |
| Oct 20, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to an existing restaurant - UNIT 105 | — | Open |
| Oct 20, 2026 | Building Permit Related(PS) | REV 01: Fire dampers removed from DCR rooms on levels 6, 7 and 8. Layout change on levels 6, 7, and 8, and associated mechanical and plumbing changes. Plumbing - Proposed interior alterations of existing offices on floors 6, 7 & 8. | — | Open |
| Oct 20, 2026 | Sign Building Permit Related | 1 Wall Sign****McCain Foods**** | — | Open |
| Oct 20, 2026 | Interior Alterations | Proposal for interior alterations to an existing restaurant - UNIT 105 | $65K | Open |
| Oct 20, 2026 | Building Permit Related(MS) | REV 01: Fire dampers removed from DCR rooms on levels 6, 7 and 8. Layout change on levels 6, 7, and 8, and associated mechanical and plumbing changes. HVAC - Proposed interior alterations of existing offices on floors 6, 7 & 8. | — | Open |
| Oct 19, 2026 | Building Permit Related(MS) | HVAC - Proposal to demolish existing partial wall and construct a tenant demising wall at Level 1, Area C north lobby. | — | Open |
| Oct 19, 2026 | Interior Alterations | Proposal to demolish existing partial wall and construct a tenant demising wall at Level 1, Area C north lobby. | — | Open |
The 40 most recent of 4,092 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Front St W with a permit on record · 70
- 1 Front St W35 permits · to 2022
- 20 Front St W46 permits · to 2022
- 22 Front St W5 permits · to 2015
- 55 Front St W10 permits · to 2025
- 61 Front St W280 permits · to 2026
- 65 Front St W211 permits · to 2026
- 71 Front St W165 permits · to 2026
- 97 Front St W6 permits · to 2026
- 100 Front St W121 permits · to 2026
- 123 Front St W320 permits · to 2026
- 142 Front St W31 permits · to 2026
- 144 Front St W47 permits · to 2024
- 146 Front St W9 permits · to 2012
- 149 Front St W11 permits · to 2024
- 151 Front St W134 permits · to 2026
- 156 Front St W64 permits · to 2025
- 160 Front St W43 permits · to 2026
- 164 Front St W3 permits · to 2025
- 171 Front St W34 permits · to 2025
- 174 Front St W19 permits · to 2025
- 200 Front St W338 permits · to 2026
- 225 Front St W4 permits · to 2026
- 230 Front St W225 permits · to 2026
- 250 Front St W389 permits · to 2026
- 255 Front St W201 permits · to 2026
- 277 Front St W37 permits · to 2024
- 300 Front St W26 permits · to 2018
- 301 Front St W58 permits · to 2022
- 306 Front St W1 permit · to 2012
- 310 Front St W19 permits · to 2020
- 315 Front St W11 permits · to 2022
- 320 Front St W268 permits · to 2026
- 325 Front St W165 permits · to 2025
- 330 Front St W11 permits · to 2015
- 340 Front St W1 permit · to 2025
- 352 Front St W28 permits · to 2026
- 355 Front St W1 permit · to 2026
- 361 Front St W29 permits · to 2026
- 363 Front St W3 permits · to 2026
- 365 Front St W26 permits · to 2017
- 373 Front St W3 permits · to 2026
- 381 Front St W20 permits · to 2023
- 387 Front St W2 permits · to 2025
- 389 Front St W39 permits · to 2026
- 397 Front St W2 permits · to 2022
- 400 Front St W1 permit · to 2008
- 401 Front St W1 permit · to 1999
- 410 Front St W24 permits · to 2026
- 412 Front St W3 permits · to 2024
- 433 Front St W1 permit · to 2025
- 440 Front St W28 permits · to 2023
- 444 Front St W2 permits · to 2015
- 450 Front St W27 permits · to 2025
- 460 Front St W9 permits · to 2025
- 462 Front St W55 permits · to 2025
- 470 Front St W24 permits · to 2025
- 472 Front St W1 permit · to 2023
- 480 Front St W61 permits · to 2026
- 486 Front St W219 permits · to 2026
- 500 Front St W9 permits · to 2026
- 510 Front St W10 permits · to 2026
- 524 Front St W8 permits · to 2017
- 530 Front St W33 permits · to 2026
- 532 Front St W5 permits · to 2017
- 550 Front St W29 permits · to 2025
- 558 Front St W5 permits · to 2011
- 560 Front St W11 permits · to 2025
- 578 Front St W18 permits · to 2020
- 580 Front St W1 permit · to 2011
- 582 Front St W6 permits · to 2024