Standpipes permits in Toronto
The City of Toronto has 97 standpipes permits on record for Toronto, going back to 2001. Declared construction value totals $4.6M. Half of the 88 permits issued here came through within 29 days of the application. The most recent permit was applied for Oct 27, 2026 at 21 Grand Magazine St.
- Permits on record
- 972001–2026
- Declared construction value
- $4.6Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 29 days2 days slower than the city
Permits issued per year
Zoning
- Most common zone
- R25.0% of permits · by-law 10.10
- In detached-house zones
- 1.5%36.5% below the city’s 38.0%
- Permits with a zone
- 68of 97 on record
The zoning categories the permits in Standpipes fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Oct 27, 2026 | 21 Grand Magazine St | Standpipes | Fire Hose Cabinet (FHC) to be removed and relocated from its original location. | $640K | Open |
| Aug 27, 2026 | 2 Strachan Ave | Standpipes | FSU re:AS standpipes | $20K | Open |
| Aug 26, 2026 | 2360 Eglinton Ave E | Standpipes | Proposed replacement of existing standpipe booster pump | $35K | Open |
| Jul 21, 2026 | 2730 Yonge St | Standpipes | PROPOSED INSTALLATION OF STANDPIPE BOOSTER PUMP | $35K | Open |
| Apr 10, 2026 | 1880 O'Connor Dr | Standpipes | Proposal to replace existing standpipe fire pump. | $20K | Open |
| Jan 6, 2026 | 89 Chestnut St | Standpipes | Complete StandPipe Fire Pump UpgradeNew Fire Pump.New Fire Pump Controller.New Fire Pump Circuit Breaker.New Fire Pump Conductors Back to the main Distribution panel. | $1K | Open |
| Nov 18, 2025 | 480 Gordon Baker Rd | Standpipes | Proposal to relocate existing fire hydrant. | $5K | Open |
| Oct 22, 2025 | 629 Adelaide St W | Standpipes | Proposal to relocate existing fire department connection only. | $25K | Open |
| Sep 24, 2025 | 41-51 BROOKWELL DR | Standpipes | Proposal to relocate existing fire department connection to avoid drainage, water trapping, and freezing issues | $35K | Open |
| Jun 11, 2025 | 500 Duplex Ave | Standpipes | Proposal for nstallation of standpipe and fire pump. | $110K | Open |
| Jun 6, 2025 | 2225 Eglinton Ave E | Standpipes | Proposed replacement of standpipe fire pump in a 6 storey aparmtent building. | $50K | Open |
| Jun 6, 2025 | 2223 Eglinton Ave E | Standpipes | Proposed replacement of standpipe fire pump in a 6 storey aparmtent building. | $50K | Open |
| Jun 4, 2025 | 5 Mallory Gdns | Standpipes | Replacement of the existing standpipe system and installation of fire pump, relocation of standpipe riser with fire hose valve in the stairs | — | Closed |
| Mar 25, 2025 | 120-130 GEORGE HENRY BLVD | Standpipes | Proposal to replace the standpipe fire pump and controller. | $55K | Open |
| Mar 10, 2025 | 150 Dowling Ave | Standpipes | Proposal to replace existing standpipe pump | $10K | Closed |
| Mar 6, 2025 | 5 Mallory Gdns | Standpipes | Revision: Replacement of the existing standpipe system and installation of fire pump, relocation of standpipe riser with fire hose valve in the stairs | — | Closed |
| Dec 17, 2024 | 25 Malcolm Rd | Standpipes | Proposal for alterations to existing fire standpipe system. Removal of superfluous FDC.Related to the 14-260855-BLD-00-NB application. | $10K | Open |
| Oct 17, 2024 | 77 King St W | Standpipes | Installing modifications to an existing overhead wet sprinkler system, this is on the 42nd floor of an existing building - Unit 4240 | $3K | Open |
| Aug 21, 2024 | 16 St Joseph St | Standpipes | REPLACEMENT OF THE EXISTING STANDPIPE SYSTEM AND INSTALLATION OF FIRE PUMP | $8K | Open |
| Jul 31, 2024 | 95 La Rose Ave | Standpipes | fire protection back flow preventor install. | $180K | Open |
| Oct 5, 2023 | 263 Dixon Rd | Standpipes | Proposed replacement of the existing standpipe and fire pump in an existing apartment building. | $5K | Closed |
| Jul 4, 2023 | 301 Park Lawn Rd | Standpipes | Relocation of existing fire department connection to suite new entrance vestibule in permit #19-264731 BLD 00 BA. | $10K | Open |
| Apr 13, 2023 | 31-85 Gilder Dr | Standpipes | Standpipe Booster Pump Replacement | $10K | Closed |
| Nov 28, 2022 | 90 Ionview Rd | Standpipes | Proposal to change the location of siamese fire connection | $10K | Open |
| Nov 15, 2022 | 3390 Weston Rd | Standpipes | REPLACE EXISTING SPRINKLER, STANDPIPE AT P-1, P-2 PARKING GARAGE AND REPLACEEXISTING STANDPIPE FIRE PUMP | $23K | Open |
| Aug 23, 2022 | 50 Rosehill Ave | Standpipes | Replacement of aged standpipe booster pump | $90K | Closed |
| Aug 22, 2022 | 45 Carlton St | Standpipes | standpipe boostr pump replacement | $100K | Open |
| Jun 20, 2022 | 1770 Eglinton Ave E | Standpipes | Standpipe Booster Pump Replacement. | $40K | Open |
| Jun 15, 2022 | 1255 Birchmount Rd | Standpipes | Proposal to replace a standpipe fire pump. | $30K | Closed |
| Apr 26, 2022 | 500 Scarlett Rd | Standpipes | Proposal for replacement of aged standpipe booster pump | $50K | Open |
| Apr 19, 2022 | 10 Linnsmore Cres | Standpipes | Standpipe design see builidng permit 20 233759 | $80K | Open |
| Jan 5, 2022 | 16 Shaftesbury Ave | Standpipes | Fire standpipe design | $25K | Open |
| Sep 29, 2021 | 1100 Birchmount Rd | Standpipes | Installation of a new Fire Protection Backflow Device | $5K | Open |
| Dec 7, 2020 | 2111 Finch Ave W | Standpipes | Proposed for replacement of an existing fire standpipe pump. | $30K | Open |
| May 26, 2020 | 100 Prudential Dr | Standpipes | Modifications to existing standpipe system level P1 and P2 to existing residential building | $10K | Open |
| May 6, 2020 | 289 The Kingsway | Standpipes | Standpipe system modification | $24K | Open |
| Mar 5, 2020 | 47 Spencer Ave | Standpipes | Proposed replacement of a booster pump for the standpipe system in an existing apartment building. | $5K | Closed |
| Mar 5, 2020 | 150 Fermanagh Ave | Standpipes | Standpipe system modification | $10K | Open |
| Feb 11, 2020 | 135 St Clair Ave W | Standpipes | Proposed standpipe system replacement and related components throughout the existing office building. *Ministry of Environment, Conservation and Parks Headquarters* | $300K | Closed |
| Jan 6, 2020 | 24 Tyndall Ave | Standpipes | Replace fire booster pump and control with same size pump and control | $24K | Closed |
The 40 most recent of 97 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.