thepermitmap

Street · 571 of 8,516 by permit count

Building permits on Sixth St, Etobicoke

The City of Toronto has 295 building permits on record for Sixth St in Etobicoke, going back to 1995. Those permits created 11 homes and removed 2, a net change of +9. Declared construction value totals $10.4M. Half of the 278 permits issued here came through within 19 days of the application. The most recent permit was issued Oct 21, 2026 at 181 Sixth St.

Permits on record
2951995–2026
Declared construction value
$10.4Mas filed, not adjusted
Homes created
11dwelling units
Homes removed
2net +9
Typical wait
19 days8 days faster than the city

Permits issued per year

20002026 (part year)

Zoning

Most common zone
RM71.5% of permits · by-law 10.80
In detached-house zones
28.2%9.8% below the city’s 38.0%
Permits with a zone
291of 295 on record
  • Residential290 · 100%
  • Employment Industrial1 · 0%

The zoning categories the permits on Sixth St fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Where this street runs

Other streets in M8V

Lake Shore Blvd W3,231 permits
Lake Shore Dr302 permits
Fifth St284 permits
Cavell Ave248 permits
Fourth St245 permits
Eighth St242 permits
Birmingham St207 permits
New Toronto St194 permits

Looking for one address on Sixth St? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Oct 21, 2026 Multiple Projects REV: Proposed revision for layout change and structural updatesProposed interior alterations, underpinning, new deck in the rear yard, and new roof on the east side of the existing detached single family dwelling. — Open
Oct 13, 2026 Garage Proposal for a detached garage $1K Open
Oct 9, 2026 Porch Proposal to repair front porch $1K Open
Sep 16, 2026 Deck Proposal for a deck extension. $20K Open
Sep 16, 2026 Multiple Projects Proposed new deck and canopy at the front side of existing dwelling $8K Open
Sep 1, 2026 Back Water Valve (Sewer only) Backwater valve installation — Closed
Aug 27, 2026 Addition(s) Proposal for enclosing an existing covered front porch $60K Open
Aug 14, 2026 Building Permit Related(MS) REV 01: per drawingsHVAC - Proposed interior alterations, underpinning, new deck in the rear yard, and new roof on the east side of the existing detached single family dwelling. — Open
Jul 2, 2026 Building Permit Related(MS) HVAC - To construct a rear laneway suite behind the existing apartment building of 8 units. — Open
Jun 29, 2026 Building Permit Related (DR) Drain - PROPOSED BASEMENT INTERIOR ALTERATIONS (35.87m2) and UNDERPINNING (25.21m) — Open
Jun 29, 2026 Underpinning PROPOSED BASEMENT INTERIOR ALTERATIONS (35.87m2) and UNDERPINNING (25.21m) $45K Open
Jun 29, 2026 Building Permit Related(PS) Plumbing - PROPOSED BASEMENT INTERIOR ALTERATIONS (35.87m2) and UNDERPINNING (25.21m) — Open
Jun 26, 2026 Building Permit Related(PS) Plumbing - Interior alteration at second floor of apartment, adding a second kitchen, seeplans — Open
May 13, 2026 Building Permit Related(PS) Plumbing - NEW LANEWAY SUITE — Open
May 13, 2026 New Laneway / Rear Yard Suite To construct a rear laneway suite behind the existing apartment building of 8 units. $400K Open
May 13, 2026 Building Permit Related (DR) Drain - NEW LANEWAY SUITE — Open
Jan 26, 2026 Interior Alterations Interior alteration at second floor of apartment, adding a second kitchen, seeplans $10K Open
Dec 18, 2025 Multiple Projects Proposal for multiple projects (third storey addition complete with a balcony and interior alterations). $650K Closed
Dec 18, 2025 Building Permit Related(PS) Plumbing - Proposal for multiple projects (third storey addition complete with a balcony and interior alterations). — Closed
Dec 18, 2025 Building Permit Related(MS) HVAC - Proposal for multiple projects (third storey addition complete with a balcony and interior alterations). — Closed
Oct 21, 2025 Accessory Building(s) REV: Proposal to construct a detached garage in the rear yard. — Closed
Sep 9, 2025 Building Permit Related (DR) Drain - Proposal for basement underpinning. — Closed
Sep 9, 2025 Building Permit Related(PS) Plumbing - Proposal for basement underpinning. — Closed
Jul 14, 2025 Underpinning Proposal for basement underpinning. $100K Closed
Apr 24, 2025 Building Permit Related (DR) Drain - Proposed interior alterations, underpinning, new deck in the rear yard, and new roof on the east side of the existing detached single family dwelling. — Open
Apr 24, 2025 Building Permit Related(PS) Plumbing - Proposed interior alterations, underpinning, new deck in the rear yard, and new roof on the east side of the existing detached single family dwelling. — Open
Apr 24, 2025 Party Wall Admin Permits Party wall admin permit for proposed work at 181 Sixth St (25 138632). — Open
Apr 10, 2025 Building Permit Related(MS) HVAC - Proposal for a 2-storey laneway house. — Open
Apr 10, 2025 Building Permit Related(PS) Plumbing - Proposal for a 2-storey laneway house. — Open
Apr 10, 2025 Building Permit Related (DR) Drain - Proposal for a 2-storey laneway house. — Open
Apr 10, 2025 New Laneway / Rear Yard Suite Proposal for a 2-storey laneway house. $300K Open
Jan 31, 2025 Garage Proposal to construct a detached garage in the rear yard. $5K Closed
Oct 8, 2024 Addition(s) Proposal to construct a 1 storey side addition to an existing 1 storey SFD-detached dwelling. — Open
Oct 1, 2024 Building Permit Related(MS) HVAC - PLUMBING AND BUILDING PERMIT FOR Interior alterations, new rear deckGround floor: 41 m2 Deck: 5.1 — Open
Sep 23, 2024 Building Permit Related(MS) HVAC - Proposal to construct a 3rd storey addition to the existing 2 storey detached SFD — Closed
Sep 23, 2024 Other(SR) REV 01 - Interior layout changes and a change in size to the new rear door (smaller in size)PLUMBING AND BUILDING PERMIT FOR Interior alterations, new rear deckGround floor: 41 m2 Deck: 5.1 — Open
Sep 9, 2024 Other(SR) Residential Rooftop Solar PV on the existing single family dwelling $20K Closed
Aug 14, 2024 Building Permit Related(PS) Plumbing - PLUMBING AND BUILDING PERMIT FOR Interior alterations, new rear deckGround floor: 41 m2 Deck: 5.1 — Open
Aug 12, 2024 Party Wall Admin Permits Party Wall Admin Permit for 24 124254 BLD 00 SR $18K Closed
Aug 12, 2024 Addition(s) Proposal to construct a 3rd storey addition to the existing 2 storey detached SFD $18K Closed

The 40 most recent of 295 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Sixth St with a permit on record · 119

  • 4 Sixth St6 permits · to 2025
  • 5 Sixth St2 permits · to 2019
  • 6 Sixth St1 permit · to 2005
  • 7 Sixth St1 permit · to 2017
  • 8 Sixth St1 permit · to 1999
  • 9 Sixth St1 permit · to 2017
  • 10 Sixth St1 permit · to 2008
  • 11 Sixth St2 permits · to 2024
  • 12 Sixth St5 permits · to 2017
  • 14 Sixth St4 permits · to 2017
  • 15 Sixth St1 permit · to 2003
  • 16 Sixth St1 permit · to 2000
  • 18 Sixth St2 permits · to 2019
  • 19 Sixth St4 permits · to 2022
  • 20 Sixth St3 permits · to 2017
  • 21 Sixth St4 permits · to 2026
  • 22 Sixth St2 permits · to 1997
  • 23 Sixth St5 permits · to 2016
  • 24 Sixth St4 permits · to 2019
  • 25 Sixth St2 permits · to 2016
  • 26 Sixth St1 permit · to 2026
  • 28 Sixth St2 permits · to 2016
  • 29 Sixth St1 permit · to 2006
  • 31 Sixth St1 permit · to 2005
  • 34 Sixth St3 permits · to 2015
  • 35 Sixth St5 permits · to 2026
  • 36 Sixth St6 permits · to 2015
  • 39 Sixth St1 permit · to 2026
  • 40 Sixth St6 permits · to 2021
  • 41 Sixth St1 permit · to 2018
  • 44 Sixth St6 permits · to 2021
  • 45 Sixth St6 permits · to 2026
  • 46 Sixth St2 permits · to 2012
  • 47 Sixth St7 permits · to 2024
  • 48 Sixth St1 permit · to 2014
  • 49 Sixth St1 permit · to 2000
  • 54 Sixth St3 permits · to 2013
  • 55 Sixth St1 permit · to 1997
  • 56 Sixth St3 permits · to 2018
  • 57 Sixth St5 permits · to 2019
  • 62 Sixth St1 permit · to 2014
  • 63 Sixth St1 permit · to 2019
  • 66 Sixth St3 permits · to 2013
  • 67 Sixth St1 permit · to 2019
  • 68 Sixth St1 permit · to 2021
  • 69 Sixth St4 permits · to 2019
  • 76 Sixth St5 permits · to 2012
  • 77 Sixth St1 permit · to 2000
  • 79 Sixth St3 permits · to 2000
  • 80 Sixth St2 permits · to 2022
  • 81 Sixth St8 permits · to 2022
  • 85 Sixth St1 permit · to 2022
  • 87 Sixth St1 permit · to 2012
  • 89 Sixth St4 permits · to 2015
  • 93 Sixth St3 permits · to 2021
  • 99 Sixth St1 permit · to 2003
  • 101 Sixth St4 permits · to 2004
  • 103 Sixth St1 permit · to 1996
  • 111 Sixth St1 permit · to 2021
  • 117 Sixth St1 permit · to 2006
  • 119 Sixth St1 permit · to 2024
  • 123 Sixth St1 permit · to 2016
  • 125 Sixth St2 permits · to 2026
  • 129 Sixth St1 permit · to 2000
  • 137 Sixth St2 permits · to 1997
  • 138 Sixth St1 permit · to 2013
  • 139 Sixth St1 permit · to 1997
  • 140 Sixth St2 permits · to 2013
  • 141 Sixth St1 permit · to 2004
  • 143 Sixth St1 permit · to 2000
  • 149 Sixth St5 permits · to 2026
  • 150 Sixth St4 permits · to 2025
  • 156 Sixth St3 permits · to 2010
  • 157 Sixth St3 permits · to 2010
  • 159 Sixth St4 permits · to 2026
  • 162 Sixth St2 permits · to 2022
  • 164 Sixth St4 permits · to 2022
  • 165 Sixth St1 permit · to 1995
  • 166 Sixth St7 permits · to 2023
  • 168 Sixth St5 permits · to 2020
  • 171 Sixth St3 permits · to 2013
  • 172 Sixth St1 permit · to 2024
  • 176 Sixth St3 permits · to 2023
  • 178 Sixth St1 permit · to 2010
  • 181 Sixth St6 permits · to 2026
  • 182 Sixth St1 permit · to 2001
  • 183 Sixth St1 permit · to 2025
  • 189 Sixth St1 permit · to 2023
  • 193 Sixth St3 permits · to 2024
  • 195 Sixth St3 permits · to 2026
  • 196 Sixth St1 permit · to 2014
  • 198 Sixth St3 permits · to 2015
  • 202 Sixth St2 permits · to 2004
  • 204 Sixth St1 permit · to 2015
  • 206 Sixth St4 permits · to 2017
  • 214 Sixth St4 permits · to 2022
  • 215 Sixth St1 permit · to 2015
  • 220 Sixth St3 permits · to 2019
  • 223 Sixth St1 permit · to 2017
  • 225 Sixth St1 permit · to 2021
  • 229 Sixth St3 permits · to 2021
  • 234 Sixth St3 permits · to 2004
  • 236 Sixth St3 permits · to 2003
  • 246 Sixth St1 permit · to 1998
  • 251 Sixth St6 permits · to 2022
  • 253 Sixth St1 permit · to 2018
  • 259 Sixth St2 permits · to 2017
  • 261 Sixth St3 permits · to 2019
  • 263 Sixth St2 permits · to 1999
  • 265 Sixth St1 permit · to 2015
  • 267 Sixth St3 permits · to 2021
  • 269 Sixth St1 permit · to 2020
  • 270 Sixth St1 permit · to 2020
  • 271 Sixth St1 permit · to 2024
  • 273 Sixth St3 permits · to 2024
  • 275 Sixth St2 permits · to 2022
  • 287 Sixth St1 permit · to 2022
  • 293 Sixth St1 permit · to 2018
  • 297 Sixth St1 permit · to 2015
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
295
Data through
2026-10-21
Refresh
Daily from the City
Sheet
STR-352