thepermitmap

Street · 722 of 8,516 by permit count

Building permits on Fourth St, Etobicoke

The City of Toronto has 245 building permits on record for Fourth St in Etobicoke, going back to 1996. Those permits created 11 homes and removed 5, a net change of +6. Declared construction value totals $8.8M. Half of the 238 permits issued here came through within 18 days of the application. The most recent permit was issued Jun 11, 2026 at 125 Fourth St.

Permits on record
2451996–2026
Declared construction value
$8.8Mas filed, not adjusted
Homes created
11dwelling units
Homes removed
5net +6
Typical wait
18 days9 days faster than the city

Permits issued per year

20022026 (part year)

Zoning

Most common zone
RM67.9% of permits · by-law 10.80
In detached-house zones
30.8%7.2% below the city’s 38.0%
Permits with a zone
237of 245 on record
  • Residential234 · 99%
  • Open Space3 · 1%

The zoning categories the permits on Fourth St fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Minor variances at the Committee of Adjustment

Applications on record
27since 2016
Approved
96.0%5.2% above the city · 25 decided
Median time to a decision
101 days19 days faster than the city

Some projects on Fourth St need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. Back to back, that is about 119 days, not the 18 days the permit figure alone suggests. How variances work, and the approval rates.

Most common work

Structures worked on

Postal areas

Where this street runs

Other streets in M8V

Lake Shore Dr302 permits
Sixth St295 permits
Fifth St284 permits
Cavell Ave248 permits
Eighth St242 permits
Birmingham St207 permits
New Toronto St194 permits
Ninth St194 permits

Looking for one address on Fourth St? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Jun 11, 2026 Back Water Valve (Sewer only) Backwater valve installation — Open
Feb 4, 2026 Building Permit Related(MS) HVAC - Proposal to construct a second-storey addition and interior alterations to existing single family dwelling.See also 25-205155 ZAP 00 ZR & 25-224547 WET 03 MV — Open
Feb 3, 2026 Building Permit Related(PS) Plumbing - Proposal to construct a second-storey addition and interior alterations to existing single family dwelling.See also 25-205155 ZAP 00 ZR & 25-224547 WET 03 MV — Closed
Feb 3, 2026 Multiple Projects Proposal to construct a second-storey addition and interior alterations to existing single family dwelling.See also 25-205155 ZAP 00 ZR & 25-224547 WET 03 MV $375K Open
Oct 7, 2025 Other(SR) Proposal for roof mount solar panel installation $40K Closed
Sep 18, 2025 Building Permit Related(PS) Plumbing - Proposal for underpinning, new bathroom rough-in in basement and interior alterations to first floor — Open
Sep 18, 2025 Multiple Projects Proposal for underpinning, new bathroom rough-in in basement and interior alterations to first floor $20K Open
Sep 18, 2025 Building Permit Related (DR) Drain - Proposal for underpinning, new bathroom rough-in in basement and interior alterations to first floor — Open
Sep 3, 2025 Other(SR) Proposal to Install a Solar PV System on Rooftop $20K Closed
Jun 27, 2025 Building Permit Related (DR) Drain - Proposal for interior alterations to covert rear portion of first floor into secondary suite — Closed
Jun 27, 2025 Interior Alterations Proposal for interior alterations to covert rear portion of first floor into secondary suite $5K Closed
Jun 27, 2025 Building Permit Related(PS) Plumbing - Proposal for interior alterations to covert rear portion of first floor into secondary suite — Closed
Jun 24, 2025 Building Permit Related (DR) Drain - Proposal to legalize existing finsihed basement into second suite — Closed
Jun 24, 2025 Interior Alterations Proposal to legalize existing finsihed basement into second suite $10K Closed
Jun 24, 2025 Building Permit Related(PS) Plumbing - Proposal to legalize existing finsihed basement into second suite — Closed
May 15, 2025 Back Water Valve (Sewer only) To excavate and install outdoor backwater valve. — Closed
May 15, 2025 Back Water Valve (Sewer only) Proposal to install Back Water Valve — Closed
Apr 22, 2025 Interior Alterations Proposal for removing load bearing wall $100K Open
Apr 15, 2025 Multiple Projects Revision 02: Proposal to Change construction of addition to ICF and Floor framing, and framing of roof addition.REVISION - as per the drawings including underpinningProposal for two storey rear addition, interior alterations, rear deck, and basement walkout to existing detached single-family dwellin — Open
Feb 12, 2025 Multiple Projects Revision 01: revision to interior alterationProposal for underpinning, basement interior ( 69 m2), ground floor alteration (10 m2) andbearing wall removal ( 5.5 m) — Closed
Nov 26, 2024 Building Permit Related(PS) Plumbing - Proposal for underpinning, basement interior ( 69 m2), ground floor alteration (10 m2) andbearing wall removal ( 5.5 m) — Closed
Nov 13, 2024 Back Water Valve (Sewer only) Proposal to excavate and install indoor backwater valve — Closed
Nov 12, 2024 Building Permit Related(MS) HVAC - Proposal for interior alterations and construct a second storey addition above the existing dwelling — Open
Oct 15, 2024 Back Water Valve (Sewer only) Proposal for supply and installation of main sanitary backwater valve — Closed
Sep 27, 2024 Building Permit Related (DR) Drain - Proposal for interior alterations and construct a second storey addition above the existing dwelling — Open
Sep 27, 2024 Building Permit Related(PS) Plumbing - Proposal for interior alterations and construct a second storey addition above the existing dwelling — Open
Sep 27, 2024 Multiple Projects Proposal for interior alterations and construct a second storey addition above the existing dwelling $450K Open
Sep 25, 2024 Back Water Valve (Sewer only) Proposal to install a backwater valve on the sanitary line in an existing SFD-detached dwelling. — Closed
Sep 24, 2024 Back Water Valve (Sewer only) To excavate and install outdoor backwater valve — Closed
Sep 19, 2024 Back Water Valve (Sewer only) Backwater Valve installation on main sanitary line — Closed
Sep 10, 2024 Back Water Valve (Sewer only) PROPOSAL TO INSTALL BACLWATER VALVE — Closed
Feb 20, 2024 Building Permit Related(PS) Plumbing - Proposal for a 2 storey front addition, interior alterations and a new front porch to an existing SFD-detached dwelling. See also 23 144901 ZAP, 23191638 MV and Final and Binding A0339/23EYK. — Open
Feb 20, 2024 Building Permit Related(MS) HVAC - Proposal for a 2 storey front addition, interior alterations and a new front porch to an existing SFD-detached dwelling. See also 23 144901 ZAP, 23191638 MV and Final and Binding A0339/23EYK. — Open
Feb 20, 2024 Multiple Projects Proposal for a 2 storey front addition, interior alterations and a new front porch to an existing SFD-detached dwelling. See also 23 144901 ZAP, 23191638 MV and Final and Binding A0339/23EYK. $250K Open
Nov 7, 2023 Garage Proposal to reconstruct detached garage from existing concrete slab to address tree impact damage.See folder 23 215568 UNS 00 VI and 23 215565 000 00 BR $50K Open
Jul 28, 2023 Building Permit Related (DR) Drain - Underpinning and interior alteration — Closed
Jul 28, 2023 Multiple Projects Underpinning and interior alteration $60K Closed
Jul 28, 2023 Building Permit Related(PS) Plumbing - Underpinning and interior alteration — Closed
Jul 13, 2023 Deck To construct a rear deck $5K Closed
Apr 20, 2023 Addition(s) Proposal for an addition at basement, first and second floor levels at the south side of the existing detached single family house. $50K Closed

The 40 most recent of 245 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Fourth St with a permit on record · 78

  • 1 Fourth St2 permits · to 2018
  • 2 Fourth St3 permits · to 2007
  • 6 Fourth St9 permits · to 2016
  • 8 Fourth St1 permit · to 2024
  • 10 Fourth St1 permit · to 1999
  • 12 Fourth St1 permit · to 2024
  • 14 Fourth St1 permit · to 2025
  • 16 Fourth St4 permits · to 2017
  • 18 Fourth St2 permits · to 2017
  • 19 Fourth St3 permits · to 2012
  • 20 Fourth St14 permits · to 2019
  • 21 Fourth St1 permit · to 1998
  • 22 Fourth St2 permits · to 2024
  • 25 Fourth St5 permits · to 2020
  • 27 Fourth St6 permits · to 2010
  • 28 Fourth St2 permits · to 2022
  • 29 Fourth St8 permits · to 2023
  • 30 Fourth St4 permits · to 2025
  • 31 Fourth St4 permits · to 2017
  • 33 Fourth St1 permit · to 2024
  • 35 Fourth St1 permit · to 2024
  • 37 Fourth St2 permits · to 2005
  • 38 Fourth St2 permits · to 2023
  • 39 Fourth St8 permits · to 2018
  • 41 Fourth St1 permit · to 2009
  • 42 Fourth St4 permits · to 2016
  • 43 Fourth St3 permits · to 2011
  • 44 Fourth St5 permits · to 2022
  • 45 Fourth St6 permits · to 2024
  • 46 Fourth St1 permit · to 2016
  • 48 Fourth St4 permits · to 2019
  • 51 Fourth St1 permit · to 2025
  • 53 Fourth St1 permit · to 2025
  • 55 Fourth St1 permit · to 2009
  • 56 Fourth St1 permit · to 2002
  • 57 Fourth St3 permits · to 2023
  • 62 Fourth St1 permit · to 2015
  • 66 Fourth St1 permit · to 2012
  • 67 Fourth St1 permit · to 2017
  • 68 Fourth St1 permit · to 2024
  • 71 Fourth St1 permit · to 2018
  • 73 Fourth St2 permits · to 2022
  • 74 Fourth St12 permits · to 2022
  • 76 Fourth St1 permit · to 2010
  • 77 Fourth St4 permits · to 2016
  • 78 Fourth St3 permits · to 2023
  • 82 Fourth St2 permits · to 2014
  • 85 Fourth St5 permits · to 2012
  • 86 Fourth St5 permits · to 2018
  • 88 Fourth St1 permit · to 2018
  • 89 Fourth St3 permits · to 2016
  • 91 Fourth St2 permits · to 2019
  • 95 Fourth St6 permits · to 2025
  • 100 Fourth St1 permit · to 2025
  • 102 Fourth St2 permits · to 2011
  • 108 Fourth St4 permits · to 2024
  • 111 Fourth St3 permits · to 2020
  • 112 Fourth St4 permits · to 2025
  • 113 Fourth St6 permits · to 2021
  • 114 Fourth St2 permits · to 2014
  • 116 Fourth St5 permits · to 2014
  • 120 Fourth St9 permits · to 2020
  • 121 Fourth St2 permits · to 2019
  • 122 Fourth St1 permit · to 2015
  • 123 Fourth St2 permits · to 2002
  • 124 Fourth St1 permit · to 2018
  • 125 Fourth St1 permit · to 2026
  • 128 Fourth St3 permits · to 2021
  • 131 Fourth St3 permits · to 2019
  • 135 Fourth St5 permits · to 2025
  • 136 Fourth St4 permits · to 2021
  • 139 Fourth St1 permit · to 2016
  • 140 Fourth St2 permits · to 2023
  • 141 Fourth St1 permit · to 2016
  • 144 Fourth St3 permits · to 2025
  • 145 Fourth St8 permits · to 2026
  • 151 Fourth St2 permits · to 2011
  • 161 Fourth St1 permit · to 2009
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
245
Data through
2026-09-08
Refresh
Daily from the City
Sheet
STR-484