Building permits on New Toronto St, Etobicoke

The City of Toronto has 194 building permits on record for New Toronto St in Etobicoke, going back to 1997. Declared construction value totals $63.5M. Half of the 172 permits issued here came through within 74 days of the application. The most recent permit was issued Aug 10, 2026 at 191 New Toronto St.

Permits on record
1941997–2026
Declared construction value
$63.5Mas filed, not adjusted
Homes created
0dwelling units
Homes removed
0net +0
Typical wait
74 days47 days slower than the city

Permits issued per year

20002026 (part year)

Zoning

Most common zone
E100.0% of permits · by-law 60.20
In detached-house zones
0.0%38.0% below the city’s 38.0%
Permits with a zone
127of 194 on record
  • Employment Industrial127 · 100%

The zoning categories the permits on New Toronto St fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Other streets in M8V

Cavell Ave248 permits
Fourth St245 permits
Eighth St242 permits
Birmingham St207 permits
Ninth St194 permits
Hillside Ave191 permits
Third St191 permits
Lake Cres178 permits

Looking for one address on New Toronto St? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Aug 10, 2026 Other(BA) Proposal to construct a new loading dock to existing food bank storage facility - Daily Bread Food Bank $250K Open
Jul 20, 2026 Sign Building Permit Related 1 Wall Sign ** DAILY BREAD FOOD BANK / COMMUNITY FOOD HUB ** — Closed
Jun 17, 2026 Certified Tents Proposal to install two certified 30'x45' tents (Cert # 25-135938). Installation date: 07 May- 11 July 2026w stages and other temporary structures — Open
May 21, 2026 Other(FS) This project consists of installation of a back flow preventer device on sprinkler system in an existing distribution facility. OBC class F. $320K Closed
May 4, 2026 Multiple Projects Revision 01: Revision to permit, including relocation of main fire alarm panel, removal of sprinkler head and other alterationsProposed addition that consists of granulated sugar silo facility with necessary equipment and truck bay. Renovation of part of the warehouse to allocate future equipment. $27.0M Open
Oct 23, 2025 Building Permit Related(MS) HVAC - Reconstruction of roof system due to previous structural failure & subsequent removal. — Open
Aug 1, 2025 Special Ventilation System Revision 01: Proposal to revise size of hood.Proposed commercial kitchen ventilation system — Open
Jul 15, 2025 Other(BA) Addition of external door and exterior weigh scale $270K Closed
Jul 8, 2025 Fire Alarm Renovation of warehouse to add electriacl/server room from existing electrical panel walls. $20K Open
Jun 13, 2025 Building Permit Related(PS) Plumbing - Proposed addition that consists of granulated sugar silo facility with necessary equipment and truck bay. Renovation of part of the warehouse to allocate future equipment. — Open
Jun 13, 2025 Building Permit Related(MS) HVAC - Proposed addition that consists of granulated sugar silo facility with necessary equipment and truck bay. Renovation of part of the warehouse to allocate future equipment. — Open
Jun 10, 2025 Other(BA) REV01: Propose revision to update beam elevations per constructionInstallation of Storage Rack — Closed
May 1, 2025 Re-Roofing/Re-Cladding Reconstruction of roof system due to previous structural failure & subsequent removal. $150K Open
Mar 21, 2025 Building Permit Related(MS) HVAC - NEW CARBON MONOXIDE SYSTEM, MAKEUP AIR UNIT, AND STRUCTURAL REINFORCING — Open
Mar 20, 2025 Interior Alterations NEW CARBON MONOXIDE SYSTEM, MAKEUP AIR UNIT, AND STRUCTURAL REINFORCING $286K Open
Feb 21, 2025 Demolition Demolition of existing trailer (size: 529.89 m2) at Mimico Logistics Yard lands (Metrolinx owned).20T (or bigger) excavator with thumb will be stationed in the delineated zone to startdemolishing the office trailers. — Demolition
Feb 14, 2025 Inside and Outside Drains Rerouting of underground site services which currently run through demolition area. Drain - Feb 4, 2025 : Addition of New Mechanical and Controls Rooms in Existing Building, are removed from the scope of workProposal for demolition of unused portion of building. Rerouting of underground site service $400K Open
Feb 4, 2025 Other(BA) Feb 4, 2025 : Addition of New Mechanical and Controls Rooms in Existing Building, are removed from the scope of workProposal for demolition of unused portion of building. Rerouting of underground site services which currently run through demolition area. Addition of new mechanical and controls rooms $1.5M Open
Jan 29, 2025 Multiple Projects Design of dry stand pipe and sprinkler system for new silo building, cupola and loading area. Added Sprinkler protection of new electrical room - New Silo Building $466K Open
Jan 28, 2025 Sprinklers Design of sprinkler system for new mechanical room, new control room and fire protection room in the existing silo building and relocate fire department connection serving the existing silo building. - Existing Silo Building $466K Open
Jan 15, 2025 Interior Demolition Proposal for interior demolition to remove existing wood framed roof structure due to structural failure. $150K Demolition
Dec 10, 2024 Demolition Proposal for Demolition of garage (110.63 m2) on Mimico Logistics Yard lands (Metrolinx owned)-An excavator with thumb is stationed in the delineated zone to start demolishing the parking garage. All machineries should have spotter all the times — Demolition
Aug 23, 2024 Building Permit Related(PS) Plumbing - Proposed construction of an additional 5,500 sf of mezzanine inside an existing warehouse. Steel and Hollow Concrete Core slab for the mezzanines, connected by a steel catwalk. — Closed
Aug 23, 2024 Addition(s) Proposed construction of an additional 5,500 sf of mezzanine inside an existing warehouse. Steel and Hollow Concrete Core slab for the mezzanines, connected by a steel catwalk. $1.6M Closed
Aug 1, 2024 Interior Alterations Renovation of wharehouse to Electrical Service Room; Related 24133069 FSU 00 FS $20K Open
Aug 1, 2024 Building Permit Related(PS) Plumbing - Renovation of wharehouse to Electrical Service Room; Related 24133069 FSU 00 FS — Open
Aug 1, 2024 Building Permit Related(MS) HVAC - Renovation of wharehouse to Electrical Service Room; Related 24133069 FSU 00 FS — Open
Jul 26, 2024 Other(DS) Proposal for the Installation of solar PV net metering system on existing roof or warehouse $422K Closed
Jan 23, 2024 Building Permit Related(MS) HVAC - Proposed interior alterations to existing industrial office. — Closed
Jan 22, 2024 Building Permit Related(PS) Plumbing - Proposed interior alterations to existing industrial office. — Closed
Jan 22, 2024 Interior Alterations Proposed interior alterations to existing industrial office. $950K Closed
Oct 31, 2023 Building Permit Related(MS) HVAC - Interior renovation/alteration for tenant improvement for existing Group F2/D occupancy. — Open
Oct 30, 2023 Building Permit Related(PS) Plumbing - Interior renovation/alteration for tenant improvement for existing Group F2/D occupancy. — Open
Sep 21, 2023 New Building Revision 01: Permit Amendment to Permit No. 21-145142: changes in the electrical room layout and internal bike storage/shower room.Proposed new industrial shell building - Building # 3(part of development for 3 buildings). Formerly 60 Birmingham St.RELATED ADDRESSES 60 BIRMINGHAM & 160 DWIGHT AVE) — New build
Sep 19, 2023 Interior Alterations Interior renovation/alteration for tenant improvement for existing Group F2/D occupancy. — Closed
May 30, 2023 Other(BA) Proposal to construct a new barrier free ramp at the entrance of the existing industrial building - LANTIC SUGAR $50K Open
Oct 11, 2022 Building Permit Related(MS) HVAC - interior alterations for new steam process equipment system to existing waste transfer station — Open
Oct 11, 2022 Interior Alterations interior alterations for new steam process equipment system to existing waste transfer station $3.2M Open
Aug 23, 2022 Interior Alterations Proposal to install new structural steel racking system for an existing warehouse/industrial building - "Bondi Produce" $443K Open
Jun 6, 2022 Alternative Solution AS-ALTERNATIVE TO PROPOSED EGRESS RESULTING FROM INTERIOR ALTERATIONSinterior alterations for new steam process equipment system to existing waste transfer station — Closed

The 40 most recent of 194 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on New Toronto St with a permit on record · 16

  • 0 New Toronto St42 permits · to 2014
  • 175 New Toronto St14 permits · to 2025
  • 188 New Toronto St23 permits · to 2024
  • 191 New Toronto St15 permits · to 2026
  • 194 New Toronto St2 permits · to 2014
  • 198 New Toronto St11 permits · to 2026
  • 199 New Toronto St14 permits · to 2015
  • 205 New Toronto St11 permits · to 2026
  • 207 New Toronto St1 permit · to 2026
  • 210 New Toronto St1 permit · to 2016
  • 225 New Toronto St1 permit · to 2016
  • 230 New Toronto St11 permits · to 2025
  • 260 New Toronto St18 permits · to 2025
  • 280 New Toronto St3 permits · to 2010
  • 290 New Toronto St10 permits · to 2025
  • 300 New Toronto St17 permits · to 2025