Street · 2599 of 8,567 by permit count
Building permits on Toro Rd
The City of Toronto has 70 building permits on record for Toro Rd, going back to 1985. Declared construction value totals $11.1M. The most recent permit was issued Sep 29, 2025 at 101 Toro Rd.
- Permits on record
- 701985–2025
- Declared construction value
- $11.1Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20002025 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 29, 2025 | Other(PS) | Proposal for new wash bay. | $10K | Open |
| Jun 11, 2025 | HVAC: Group F up to 230 Sq M | Addition of Spray booth system within an existing car repair shop | $10K | Open |
| Jun 9, 2025 | Other(BA) | Proposed exterior curtain wall at rear wall . | $60K | Open |
| May 2, 2025 | Interior Alterations | Proposal for interior fit-out | $200K | Closed |
| Jan 29, 2025 | Other(BA) | Proposed accessory structure for worker training | $60K | Open |
| Dec 2, 2024 | Other(MS) | ADDITION OF A SPRAY BOOTH SYSTEM WITHIN AN EXISTING CAR REPAIR SHOP (GROUP F2 No change of use in major occupancy, no change to any building architectural layout, lighting, HVAC and plumbing system. | $10K | Open |
| Nov 30, 2024 | Building Permit Related(FS) | FS - Commercial Kitchen Exhaust Exitinguishing Shop Drawings - ADDITION OF A SPRAY BOOTH SYSTEM WITHIN AN EXISTING CAR REPAIR SHOP (GROUP F2 No change of use in major occupancy, no change to any building architectural layout, lighting, HVAC and plumbing system. | — | Open |
| Jul 25, 2024 | Building Permit Related(PS) | Revision #02 - Two washrooms have been added in the basement level.Revision 01: A permit revision is required for the project as per the changes in the architectural, structural and mechanical design for the Interior alteration and extension of office space inside the existing industrial space. ropo | — | Closed |
| Jun 7, 2024 | Building Permit Related(MS) | Revision 02: Revision to Mechanical DrawingsRevision 01: A permit revision is required for the project as per the changes in the architectural, structural and mechanical design for the Interior alteration and extension of office space inside the existing industrial space. ropose to construct an inte | — | Closed |
| Jun 5, 2024 | Addition(s) | Revision 02: Two washrooms have been added in the basement level. Furthermore, the entrance space and stairs inside the building have been revised. Revision 01: A permit revision is required for the project as per the changes in the architectural, structural and mechanical design for the Interior al | — | Closed |
| Mar 28, 2024 | Fire Alarm | REPLACEMENT OF FIRE ALARM CONTROL PANEL; ALL ZONING AND DEVICES TO REMAIN THE SAME | $45K | Closed |
| Mar 27, 2023 | Special Ventilation System | Proposed installation of spray paint booth and makeup air unit | $60K | Open |
| Mar 23, 2023 | Other(BA) | Installation of spray paint booth and makeup air unit - STRUCTURAL only related to permit 22 182003 MSA | $60K | Open |
| Nov 2, 2022 | Other(BA) | Alterations to existing front yard parking spaces including BF parking provisions - see BP 22 105512 BLD 00 BA - amendment to extend the paving to the municipal sidewalk in order to ensure proper maintenance and avoid damage to the narrow left-over sodded strip; Add new low modular pre-cast toe wall | — | Closed |
| Apr 4, 2022 | Inside and Outside Drains | Water main replacement and installation of backflow preventor per application form and submitted drawing | $12K | Open |
| Nov 10, 2021 | Re-Roofing/Re-Cladding | Proposal for front windows replacement, re-cladding and partial side elevations renovation. Main entrance feature frame surround with ACM. | $180K | Closed |
| Sep 30, 2020 | Special Ventilation System | Proposal to install a spray paint booth in an existing automotive body shop - North Sky Auto Collision | $24K | Closed |
| Jul 21, 2020 | Backflow Prevention Devices (Water only) | Replace backflow preventer | $1K | Open |
| Nov 29, 2019 | Other(PS) | Proposed PLUMBING-ADD 1 OIL INTERCEPTOR TO EXISTING SPEEDUP GTA-CAR DETAILING. | $1K | Closed |
| Sep 17, 2019 | Interior Alterations | Add a setteling tank in existing concrete slab, add a wall opening in non-load bearing demising wall and basic renovation | $9K | Closed |
| Aug 15, 2019 | Backflow Prevention Devices (Water only) | Proposal to install backflow prevention device. | $2K | Closed |
| May 27, 2019 | Interior Alterations | Proposal for interior alterations to repair a ledge due to fire damage - "Covenant Chapel" | $10K | Closed |
| Jun 11, 2018 | Fire Alarm | Replacement of fire alarm panel | $5K | Open |
| Nov 15, 2017 | Manholes/Catch Basins/Sumps/Interceptors | Proposal to install two interceptors by cutting concrete slab. | $5K | Closed |
| Aug 2, 2016 | Backflow Prevention Devices (Water only) | Proposal to install 1 backflow prevention device. | $2K | Closed |
| Apr 5, 2016 | Special Ventilation System | Install a paint spray booth, replacement air, and paint tint room | $120K | Closed |
| Mar 29, 2016 | Building Permit Related(PS) | Plumbing - Interior Alterations to construct a multi disciplinary medical clinic (703.18m2) | — | Closed |
| Mar 29, 2016 | Building Permit Related(MS) | HVAC - Interior Alterations to construct a multi disciplinary medical clinic (703.18m2) | — | Closed |
| Mar 29, 2016 | Interior Alterations | Interior Alterations to construct a multi disciplinary medical clinic (703.18m2) | $400K | Closed |
| Dec 24, 2015 | Backflow Prevention Devices (Water only) | Install one 3/4" backflow preventer (water only) | $2K | Closed |
| Dec 1, 2015 | Backflow Prevention Devices (Water only) | Install one backflow preventor. | $1K | Closed |
| Nov 24, 2015 | Backflow Prevention Devices (Water only) | Install three two inch backflow preventers Per confirmation from applicant, install total 4 BFP under this permit. | $8K | Closed |
| Nov 16, 2015 | Backflow Prevention Devices (Water only) | To install (1) Backflow Prevention Devices (Water only). | $2K | Closed |
| Oct 24, 2014 | Other(BA) | Constuct an accessory garage storage | $40K | Closed |
| May 5, 2014 | Solar Collector | To install two solar collectors to the existing commercial building. | $500K | Closed |
| Feb 10, 2014 | Backflow Prevention Devices (Water only) | Revision to change 1" backflow preventor from RP to DCVA | — | Closed |
| Feb 10, 2014 | Backflow Prevention Devices (Water only) | Revsio to change 1" backflow preventor from PR to DCVA | — | Closed |
| Nov 4, 2013 | Sign Building Permit Related | To erect and display one non-illuminated ground sign.** | — | Closed |
| Dec 14, 2012 | Building Permit Related(PS) | Plumbing - Three storey office building - The International Union of Painters & Allied Trades | — | Closed |
| Dec 14, 2012 | Building Permit Related(MS) | HVAC - Three storey office building - The International Union of Painters & Allied Trades | — | Closed |
The 40 most recent of 70 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.