Street · 2595 of 8,516 by permit count
Building permits on Brisbane Rd, North York
The City of Toronto has 70 building permits on record for Brisbane Rd in North York, going back to 1995. Declared construction value totals $9.7M. Half of the 57 permits issued here came through within 37 days of the application. The most recent permit was issued Jul 11, 2025 at 101-103 BRISBANE RD.
- Permits on record
- 701995–2025
- Declared construction value
- $9.7Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 37 days10 days slower than the city
Permits issued per year
Zoning
- Most common zone
- EH100.0% of permits · by-law 60.30
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 48of 70 on record
The zoning categories the permits on Brisbane Rd fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M3J
Looking for one address on Brisbane Rd? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jul 11, 2025 | Sprinklers | Proposed sprinkler head replacements and lowering to ceiling height. 103 Brisbane Rd. Unit B | $18K | Open |
| May 27, 2025 | Sprinklers | Proposal to replace sprinklers heads. | $18K | Closed |
| Jan 10, 2025 | Other(BA) | Revision 02 - addition to structural drawing (SK-S1) which was missedProposal to construct concrete pillars with half round canopy at exterior entrance, siding & painting | — | Closed |
| Oct 24, 2024 | Building Permit Related(MS) | HVAC - Proposal for interior alterations for new kitchen showroom | — | Closed |
| Oct 24, 2024 | Interior Alterations | Proposal for interior alterations for new kitchen showroom | $5K | Closed |
| Sep 25, 2024 | Building Permit Related(PS) | Plumbing - Proposal to construct concrete pillars with half round canopy at exterior entrance, siding & painting | — | Closed |
| Sep 25, 2024 | Building Permit Related(MS) | HVAC - Proposal to construct concrete pillars with half round canopy at exterior entrance, siding & painting | — | Closed |
| Sep 11, 2023 | Addition(s) | Install additional structure and increase size of rooftop penthouse for new equipment installation | $1.1M | Open |
| Nov 16, 2022 | Interior Alterations | Repair/reinstate portion of the building due to vehicle impact damage. | $65K | Open |
| Nov 3, 2022 | Building Permit Related(MS) | HVAC - Proposed interior renovation for office space | — | Closed |
| Nov 1, 2022 | Interior Alterations | Proposed interior renovation for office space | $10K | Closed |
| Oct 6, 2022 | Inside and Outside Drains | Water service consolidation | $10K | Closed |
| May 27, 2022 | Interior Alterations | Revision 01- as per inspector's comments during site review (see cover letter)Interior alterations to existing tenant space connection to adjacent space addition of workshop, washroom and change rooms, offices as well as finished goods storage and single analytical lab. | — | Closed |
| Oct 5, 2021 | Building Permit Related(PS) | Plumbing - Interior alterations to existing tenant space connection to adjacent space addition of workshop, washroom and change rooms, offices as well as finished goods storage and single analytical lab. | — | Closed |
| Oct 5, 2021 | Building Permit Related(MS) | HVAC - Interior alterations to existing tenant space connection to adjacent space addition of workshop, washroom and change rooms, offices as well as finished goods storage and single analytical lab. | — | Closed |
| Sep 20, 2021 | Interior Alterations | Installation of one steel framing and removal of one existing steel column along with installation of new concrete footings to support new steel columns. | $10K | Open |
| Mar 3, 2021 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposal for interior alterations to existing industrial building | — | Closed |
| Jul 6, 2020 | Sign Building Permit Related | To erect and display one illuminated wall sign displaying first party static copy, measuring 1.68 meters vertically by 5.7 meters horizontally at the height of 4.3 meters on the east elevation. ****CSN COLLISION CENTRES********CSN COLLISION CENTRES**** | — | Closed |
| Dec 19, 2019 | Backflow Prevention Devices (Water only) | Install 3/4" backflow preventer | $5K | Closed |
| Nov 26, 2019 | Temporary Structures | Proposal to install a temporary storage trailer in existing industrial building. from January 1 2020 to September 30 2020 | — | Closed |
| Nov 13, 2019 | Fire Alarm | Proposed fire alarm panel replacement. | $110K | Closed |
| Nov 5, 2019 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to existing industrial building | — | Closed |
| Nov 5, 2019 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to existing industrial building | — | Closed |
| Nov 5, 2019 | Addition(s) | Proposal for addition to existing industrial building | $1.0M | Closed |
| Oct 18, 2019 | Demolition | Proposal to demolish the north half of a industrial building | — | Demolition |
| May 6, 2019 | Interior Alterations | Installation and Integration of 4 x Capstone C65 Microturbine Generators for Load Displacement.The Building Permit is required for the outdoor concerete pad only. | $500K | Open |
| May 6, 2019 | Building Permit Related(MS) | HVAC - Installation and Integration of 4 x Capstone C65 Microturbine Generators for Load Displacement.The Building Permit is required for the outdoor concerete pad only. | — | Open |
| Jan 8, 2019 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to create a new fermentation lab in an existing industrial building. | — | Closed |
| Jan 8, 2019 | Building Permit Related(MS) | HVAC - Proposed interior alterations to create a new fermentation lab in an existing industrial building. | — | Closed |
| Dec 27, 2018 | Interior Alterations | Proposed interior alterations to create a new fermentation lab in an existing industrial building. | $100K | Closed |
| Feb 15, 2018 | Building Permit Related(MS) | HVAC - Proposed basement electrical room and associated work. | — | Closed |
| Feb 5, 2018 | Interior Alterations | Proposed basement electrical room and associated work. | $250K | Closed |
| Jan 25, 2018 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposed basement electrical room and associated work. | — | Closed |
| Jul 13, 2017 | Building Permit Related(PS) | Plumbing - Interior Alteration of existing industrial facility to labs and support facilities including offices.Revision 1 List included | — | Closed |
| Jul 13, 2017 | Building Permit Related(MS) | HVAC - Interior Alteration of existing industrial facility to labs and support facilities including offices.Revision 1 List included | — | Closed |
| Jul 13, 2017 | Interior Alterations | Revision 01: Sprinkler shop drawings and updated HYD calculations & Cieling plan provided.Interior Alteration / change of use of existing industrial facility to labs and support facilities including offices.Revision 2 sheet included | — | Closed |
| Jul 7, 2017 | Building Permit Related(PS) | Plumbing - Construct a second storey addition above an existing one storey warehouse - Data storage/ office | — | Closed |
| Jul 7, 2017 | Building Permit Related(MS) | HVAC - Construct a second storey addition above an existing one storey warehouse - Data storage/ office | — | Closed |
| Jul 7, 2017 | Addition(s) | Construct a second storey addition above an existing one storey warehouse - Data storage/ office | $900K | Closed |
| Apr 28, 2017 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Interior Alteration of existing industrial facility to labs and support facilities including offices. | — | Closed |
The 40 most recent of 70 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Brisbane Rd with a permit on record · 19
- 2 Brisbane Rd9 permits · to 2019
- 14 Brisbane Rd17 permits · to 2022
- 45 Brisbane Rd2 permits · to 2016
- 50 Brisbane Rd4 permits · to 2023
- 55 Brisbane Rd3 permits · to 2022
- 61 Brisbane Rd3 permits · to 2010
- 62 Brisbane Rd5 permits · to 2015
- 66 Brisbane Rd4 permits · to 2015
- 79 Brisbane Rd6 permits · to 2017
- 81 Brisbane Rd1 permit · to 2010
- 85 Brisbane Rd8 permits · to 2025
- 99 Brisbane Rd1 permit · to 2010
- 101 Brisbane Rd4 permits · to 2025
- 102 Brisbane Rd4 permits · to 2025
- 103 Brisbane Rd4 permits · to 2025
- 121 Brisbane Rd2 permits · to 2020
- 125 Brisbane Rd1 permit · to 2014
- 126 Brisbane Rd1 permit · to 2014
- 127 Brisbane Rd1 permit · to 2014