Type of work · 58 of 103 by permit count
Re-Roofing/Re-Cladding permits in Toronto
The City of Toronto has 1,283 re-roofing/re-cladding permits on record for Toronto, going back to 2001. Declared construction value totals $759.9M. Half of the 1,225 permits issued here came through within 29 days of the application. The most recent permit was issued Oct 15, 2026 at 94 Brockport Dr.
- Permits on record
- 1,2832001–2026
- Declared construction value
- $759.9Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 29 days2 days slower than the city
Permits issued per year
Zoning
- Most common zone
- CR39.3% of permits · by-law 40.10
- In detached-house zones
- 2.6%35.4% below the city’s 38.0%
- Permits with a zone
- 806of 1,283 on record
The zoning categories the permits in Re-Roofing/Re-Cladding fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Oct 15, 2026 | 94 Brockport Dr | Re-Roofing/Re-Cladding | Existing roof to be uplifted within existing building footprint | $75K | Open |
| Oct 7, 2026 | 1300 Eglinton Ave W | Re-Roofing/Re-Cladding | Proposal for roof rehabilitation project of the respective roof areas in the courtyard. The work includes removal of existing metal roof panels, gutters and downspouts, and installation of new metal roof, gutters, downspouts and new de-icing snow cables at all metal roof eaves, including heat tracin | $630K | Open |
| Oct 5, 2026 | 620 Church St | Re-Roofing/Re-Cladding | PROPOSED EXTERIOR WALL REPAIRS | $320K | Open |
| Sep 14, 2026 | 212 St George St | Re-Roofing/Re-Cladding | Proposal for cladding repairs on western wall. | $20K | Open |
| Aug 4, 2026 | 385 Carlingview Dr | Re-Roofing/Re-Cladding | Proposal for removing the roofing system and replace with galvanized corrugated steel deck along with new insulation, waterproofing and roofing system. | $30.0M | Open |
| Aug 4, 2026 | 77 Davisville Ave | Re-Roofing/Re-Cladding | Replace the failed caulking, failed tuck pointing and damaged bricks for facade restoration | $10K | Open |
| Jul 8, 2026 | 285 Wilmington Ave | Re-Roofing/Re-Cladding | Rev 01 - Proposed amendments to address deficiency letter dated march 2025.Siporex Deck Replacement on Roofs B1a and B3a. Roof Replacement on Roofs A, A1, B, B1, B1a, B2, B3, B3a, B4, D and D2. | — | Open |
| Jun 22, 2026 | 1845 Gerrard St E | Re-Roofing/Re-Cladding | Brick repointing of deteriorated bricks and installation of new EIFS wall assembly including air/water barrier, insulation, flashings, trims, sealants and associated exterior building envelope rehabilitation work. Proposed EIFS assembly submitted as part of Alternative Solution and CAN/ULC-S134 comp | $233K | Open |
| Jun 18, 2026 | 208 Niagara St | Re-Roofing/Re-Cladding | Proposal to remove existing exterior cladding system and install new EIFS wall assembly including air/water barrier, insulation, flashings, trims, sealants and associated exterior building envelope rehabilitation work. | $983K | Open |
| Apr 24, 2026 | 277 Victoria St | Re-Roofing/Re-Cladding | Installation of a new EIFS system on the south elevation of the building. | $300K | Open |
| Apr 2, 2026 | 1450 St Clair Ave W | Re-Roofing/Re-Cladding | Proposal to replace a section of curtain wall cladding. | $454K | Closed |
| Mar 23, 2026 | 3174 Yonge St | Re-Roofing/Re-Cladding | Proposal for the installation of a non-combustible exterior wall cladding on and existing bank building - TD BANK | $25K | Closed |
| Mar 18, 2026 | 650 Kingston Rd | Re-Roofing/Re-Cladding | revision: AINTAIN EXISTING STEPS TO NEW ROOF DECK & USE EXISTING 7TH FLOOR ROOF DECK WHEN ACCESIBILITY IS REQUIRED. | — | Closed |
| Feb 26, 2026 | 84 Marine Parade Dr | Re-Roofing/Re-Cladding | Proposal to replace exterior cladding | $100K | Open |
| Feb 9, 2026 | 1750 Finch Ave E | Re-Roofing/Re-Cladding | Proposal for loading dock roof slab replacement. | $800K | Open |
| Feb 3, 2026 | 150 Borough Dr | Re-Roofing/Re-Cladding | Proposal for roof replacement | $1K | Open |
| Jan 29, 2026 | 1154 Wilson Ave | Re-Roofing/Re-Cladding | Proposal to install new EIFS Cladding over existing masonry | $400K | Closed |
| Nov 24, 2025 | 6021 Steeles Ave E | Re-Roofing/Re-Cladding | Proposed installation of new ACM Cladding. | $15K | Open |
| Nov 24, 2025 | 3333 Finch Ave E | Re-Roofing/Re-Cladding | Proposed exterior wall repair and window replacement- Isolated brick masonry and concrete repair- Installation of new noncombustible exterior insulation and finish system on exterior wall- Replacement of existing aluminum windows with new aluminum windows | $3.5M | Open |
| Nov 7, 2025 | 78 Holly St | Re-Roofing/Re-Cladding | Proposal for localized roof deck overburden removal, replacement, waterproofing repairs and concrete repairs. | $5K | Closed |
| Oct 20, 2025 | 155 Marlee Ave | Re-Roofing/Re-Cladding | Proposal to repair exterior walls, brick replacement and concrete repairs. | $215K | Open |
| Oct 17, 2025 | 94 Beverley St | Re-Roofing/Re-Cladding | Proposed remove & replace sheet metal flashing, soffit, frieze, gutters, downspouts& framing of the existing canopy along the masonry wall. | $99K | Closed |
| Oct 17, 2025 | 221 Sterling Rd | Re-Roofing/Re-Cladding | Proposal to replace damaged roof area. | $30K | Closed |
| Oct 1, 2025 | 60 Pearldale Ave | Re-Roofing/Re-Cladding | Proposal for emergency exterior masonry wall replacement after vehicle impact. | $165K | Closed |
| Sep 30, 2025 | 72 Sterling Rd | Re-Roofing/Re-Cladding | Proposal to replace exterior cladding on third floor and ground floor. | $100K | Open |
| Sep 10, 2025 | 333 Bloor St E | Re-Roofing/Re-Cladding | Proposal for localized remedial repair to exterior stone masonry walls above 10th Floor balcony | $550K | Closed |
| Sep 10, 2025 | 920 Yonge St | Re-Roofing/Re-Cladding | Re-cladding of an existing 19-storey tower with terracotta panels. | $3.0M | Open |
| Sep 9, 2025 | 30 Eglinton Ave E | Re-Roofing/Re-Cladding | Proposed restoration to building facade. | $210K | Open |
| Sep 8, 2025 | 100 Dundalk Dr | Re-Roofing/Re-Cladding | Proposal to repair/replace exterior damaged bricks due to aging. | $10K | Open |
| Aug 21, 2025 | 250R Ferrand Dr | Re-Roofing/Re-Cladding | Proposal to remove of existing shell glazing, concrete precast & metal panels on North, South, East & West elevations. Construction of new exterior facade using window wall and curtain wall glazing systems. | $3.8M | Open |
| Aug 21, 2025 | 1235 Huntingwood Dr | Re-Roofing/Re-Cladding | To install new truss roof on existing 2 block townhome complex. | $60K | Open |
| Jul 24, 2025 | 1148 Yonge St | Re-Roofing/Re-Cladding | Proposed brick pointing and roof membrane replacement. | $500K | Closed |
| Jul 18, 2025 | 5600 Yonge St | Re-Roofing/Re-Cladding | Proposal for Finch Subway Station entrances at Yonge and Pemberton roofing rehabilitation, which at Yonge entrance requires roof mounted guard rails | $350K | Open |
| Jul 17, 2025 | 991 St Clair Ave W | Re-Roofing/Re-Cladding | Proposed repairs to deteriorated brick facade on chimneys and exterior concrete stairs. | $1.0M | Closed |
| Jun 27, 2025 | 81A St Mary St | Re-Roofing/Re-Cladding | Proposal to replace the existing light autoclaved aerated concrete - ACC/Siporex Deck at roof area with a new steel deck including the roof assembly and interior ceiling - University of St. Michael's College | $850K | Open |
| Jun 26, 2025 | 35 High Park Ave | Re-Roofing/Re-Cladding | Proposed exterior wall repairs to replace cracked bricks | $317K | Open |
| Jun 26, 2025 | 66 Pacific Ave | Re-Roofing/Re-Cladding | Proposed exterior wall repairs to replace cracked bricks | $317K | Open |
| Jun 20, 2025 | 129 Peter St | Re-Roofing/Re-Cladding | Proposal for wholesale replacement of roof membrane and roof insulation systems. potential replacement of select roof-mounted hvac units. | $500K | Open |
| Jun 11, 2025 | 100 Nugget Ave | Re-Roofing/Re-Cladding | Proposal to reconstruct roof and facade for the front office of the warehouse. | $100K | Open |
| May 26, 2025 | 855-877 ALNESS ST | Re-Roofing/Re-Cladding | Proposal for structural work to reinforce the roof of an commercial building - UNIT 3Convenience address is 877 Alness St | $4K | Closed |
The 40 most recent of 1,283 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.