Street · 313 of 8,516 by permit count
Building permits on Richmond St E
The City of Toronto has 466 building permits on record for Richmond St E, going back to 1995. Those permits created 98 homes and removed 3, a net change of +95. Declared construction value totals $70.0M. Half of the 438 permits issued here came through within 25 days of the application. The most recent permit was issued Oct 23, 2026 at 60 Richmond St E.
- Permits on record
- 4661995–2026
- Declared construction value
- $70.0Mas filed, not adjusted
- Homes created
- 98dwelling units
- Homes removed
- 3net +95
- Typical wait
- 25 days2 days faster than the city
Permits issued per year
Zoning
- Most common zone
- CR100.0% of permits · by-law 40.10
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 464of 466 on record
The zoning categories the permits on Richmond St E fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Where this street runs
Other streets in M5A
Looking for one address on Richmond St E? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 23, 2026 | Building Permit Related(MS) | REV 02: Proposed revision to permit 26-110829 HVA 00 MS HVAC - Proposal for interior alterations to new daycare centre | — | Open |
| Oct 5, 2026 | Building Permit Related(PS) | Plumbing - Minor interior renovations, existing exteriors and footprints to remain. | — | Open |
| Oct 5, 2026 | Building Permit Related(MS) | HVAC - Minor interior renovations, existing exteriors and footprints to remain. | — | Open |
| Oct 2, 2026 | Interior Alterations | Minor interior renovations on GF, 2nd and 22nd floors. Existing exteriors and footprints to remain. | $300K | Open |
| Oct 2, 2026 | Demolition | Proposal for demolishing the commerical building due to unsafe conditions (Unsafe Order-26 215619 UNS 00 VI). Including the address 251 Queen St. E., the building is attached to 354 Richmond street | — | Demolition |
| Sep 30, 2026 | Multiple Projects | Proposal for replacement of existing windows and sliding patio doors at 311 Richmond Street East, Toronto. The project includes removal of existing assemblies, installation of new window and sliding door systems, perimeter sealing/caulking, adjustments, testing, and final cleanup on the west and sou | $100K | Open |
| Jul 13, 2026 | Interior Alterations | REV 01 to sprinkler design. Proposal for interior alterations to new daycare centre in the ground and second floor. | — | Open |
| Apr 28, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to new daycare centre | — | Open |
| Apr 23, 2026 | Balcony/Guard Repairs | Proposal for balcony repairs and waterproofing for an existing apartment building. | $525K | Closed |
| Apr 16, 2026 | Building Permit Related(PS) | Plumbing - Proposed interior alterations for a retail occupancy. | — | Open |
| Apr 16, 2026 | Building Permit Related(MS) | HVAC - Proposed interior alterations for a retail occupancy. | — | Open |
| Mar 31, 2026 | Interior Alterations | Proposed interior alterations for a retail occupancy. | $40K | Closed |
| Mar 13, 2026 | Interior Alterations | Creating an opening from mail room to parcel room and adding a door from bike storage to same parcel room. | $35K | Open |
| Feb 17, 2026 | Building Permit Related(PS) | Rev 01: Plumbing revision to the kitchen sink on the second floor.Plumbing - Proposal for interior alterations to existing office including new partitions, doors and a kitchenette | — | Closed |
| Feb 13, 2026 | Building Permit Related(MS) | Rev 02: Proposed revision to the details of the return air airduct and suspended ceiling to maintain the current return air configuration on the 2nd floorRev 01: the addition of a duct and suspended ceiling to maintain the current return air configuration on the 2nd floor, as well as the removal of | — | Closed |
| Feb 13, 2026 | Interior Alterations | Rev 02: Proposed revision to the details of the return air airduct and suspended ceiling to maintain the current return air configuration on the 2nd floor, as well as a slight plumbing revision to the kitchen sink on the second floor.Rev 01: the addition of a duct and suspended ceiling to maintain t | $1K | Open |
| Feb 3, 2026 | Fire Alarm | REV : Replacement of fire alarm panel | — | Closed |
| Jan 15, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations fit out for offices. New rooms to accommodate new proposed floor plans and services. Existing elevator to be replaced with new inside of existing shaft. | — | Open |
| Jan 9, 2026 | Building Permit Related(PS) | Plumbing - Proposed interior alteration of existing lobby to accommodate accessible lift and universal washroom. | — | Open |
| Jan 9, 2026 | Building Permit Related(MS) | HVAC - Proposed interior alteration of existing lobby to accommodate accessible lift and universal washroom. | — | Open |
| Jan 6, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations fit out for offices. New rooms to accommodate new proposed floor plans and services. Existing elevator to be replaced with new inside of existing shaft. | — | Open |
| Dec 23, 2025 | Interior Alterations | Proposal for interior alterations fit out for offices. New rooms to accommodate new proposed floor plans and services. Existing elevator to be replaced with new inside of existing shaft. | $9.5M | Open |
| Dec 23, 2025 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposal for interior alterations fit out for offices. New rooms to accommodate new proposed floor plans and services. Existing elevator to be replaced with new inside of existing shaft. | — | Open |
| Dec 17, 2025 | Alternative Solution | Alternative Solution - The proposed 4th floor of this building is designated as a B3 occupancy primarily due to the sleeping accommodations for clients and the nursing station for medical staff that can assist clients with minor medical care. However, the clients on this floor are not standard B3/B2 | — | Closed |
| Dec 16, 2025 | Alternative Solution | Alternative SolutionAs a result, the following alternative solutions are being suggested to deal with issues like the narrow footprint of this building and the positioning next to the adjacent buildings that limits compliance with B3 requirements for egress stairs and corridor widths, the grandfathe | — | Closed |
| Dec 5, 2025 | Interior Alterations | Proposed interior alteration of existing lobby to accommodate accessible lift and universal washroom. | $200K | Open |
| Oct 6, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to basement and first floor area | — | Closed |
| Oct 6, 2025 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to basement and first floor area | — | Closed |
| Oct 2, 2025 | Interior Alterations | Proposal for interior alterations to basement and first floor area | $70K | Open |
| Sep 18, 2025 | Interior Alterations | Proposal for interior alterations to construct a partition wall for new storage room.See also 25 177929 WNP. | $5K | Open |
| May 26, 2025 | Garage Repair/Reconstruction | Localized parking garage concrete repairs, drain replacement and waterproofing repairsConvenience address 120 Lombard St. (115 Richmond St. E.) | $75K | Closed |
| Mar 28, 2025 | Building Permit Related(PS) | Revision 01 - revised ground floor layoutPlumbing - Interior alterations to existing convenience store, convert existing non-alcoholic beverage cooler unit a beer cave and non-alcoholic beverage cooler unit with associated sales area reno | — | Closed |
| Mar 26, 2025 | Building Permit Related(MS) | Revision 01- Layout changesHVAC - Interior alterations to existing convenience store, convert existing non-alcoholic beverage cooler unit a beer cave and non-alcoholic beverage cooler unit with associated sales area reno | — | Closed |
| Mar 24, 2025 | Interior Alterations | Revision 01 - revised ground floor layoutInterior alterations to existing convenience store, convert existing non-alcoholic beverage cooler unit a beer cave and non-alcoholic beverage cooler unit with associated sales area reno | — | Closed |
| Feb 19, 2025 | Sign Building Permit Related | 2 WALL SIGN**Colonia Treuhand** | — | Closed |
| Feb 3, 2025 | Other(PS) | Proposal to replace the existing domestic water boilers with new gas fired domestic water heaters and storage tanks. | $15K | Closed |
| Jan 10, 2025 | Sign Building Permit Related | 2 WALL SIGN | — | Closed |
| Nov 6, 2024 | Interior Alterations | Proposed extensive interior alterations for ground floor, 2nd floor & mezzanine, 3rd floor, 4th floor, terrace and front glazing facade. | — | Closed |
| Sep 3, 2024 | Building Permit Related(MS) | HVAC - Proposed extensive interior alterations for ground floor, 2nd floor & mezzanine, 3rd floor, 4th floor, terrace and front glazing facade. | — | Closed |
| Aug 14, 2024 | Building Permit Related(PS) | Plumbing - Proposed extensive interior alterations for ground floor, 2nd floor & mezzanine, 3rd floor, 4th floor, terrace and front glazing facade. | — | Closed |
The 40 most recent of 466 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Richmond St E with a permit on record · 55
- 15 Richmond St E5 permits · to 2026
- 20 Richmond St E67 permits · to 2026
- 25 Richmond St E16 permits · to 2026
- 35 Richmond St E1 permit · to 2021
- 50 Richmond St E6 permits · to 2026
- 58 Richmond St E3 permits · to 2010
- 60 Richmond St E16 permits · to 2026
- 67 Richmond St E7 permits · to 2018
- 70 Richmond St E32 permits · to 2026
- 76 Richmond St E7 permits · to 2022
- 79 Richmond St E1 permit · to 2021
- 80 Richmond St E1 permit · to 2015
- 82 Richmond St E1 permit · to 2016
- 84 Richmond St E4 permits · to 2016
- 87 Richmond St E4 permits · to 2003
- 88 Richmond St E7 permits · to 2020
- 90 Richmond St E6 permits · to 2014
- 101 Richmond St E5 permits · to 2024
- 103 Richmond St E2 permits · to 2014
- 111 Richmond St E1 permit · to 2025
- 115 Richmond St E1 permit · to 2024
- 190 Richmond St E6 permits · to 2018
- 230 Richmond St E39 permits · to 2022
- 231 Richmond St E5 permits · to 2022
- 255 Richmond St E9 permits · to 2017
- 260 Richmond St E3 permits · to 2017
- 272 Richmond St E15 permits · to 2016
- 282 Richmond St E6 permits · to 2017
- 284 Richmond St E3 permits · to 2025
- 287 Richmond St E8 permits · to 2016
- 294 Richmond St E25 permits · to 2024
- 311 Richmond St E4 permits · to 2026
- 320 Richmond St E27 permits · to 2016
- 323 Richmond St E28 permits · to 2024
- 354 Richmond St E2 permits · to 2026
- 381 Richmond St E2 permits · to 2017
- 387 Richmond St E1 permit · to 2011
- 410 Richmond St E2 permits · to 2022
- 411 Richmond St E22 permits · to 2025
- 431 Richmond St E5 permits · to 2020
- 452 Richmond St E2 permits · to 2016
- 455 Richmond St E2 permits · to 2013
- 457 Richmond St E6 permits · to 2018
- 480 Richmond St E3 permits · to 2013
- 482 Richmond St E6 permits · to 2013
- 494 Richmond St E1 permit · to 2007
- 506 Richmond St E1 permit · to 2007
- 508 Richmond St E1 permit · to 2007
- 510 Richmond St E1 permit · to 2007
- 512 Richmond St E1 permit · to 2007
- 517 Richmond St E18 permits · to 2022
- 523 Richmond St E4 permits · to 2012
- 526 Richmond St E4 permits · to 2014
- 529 Richmond St E4 permits · to 2017
- 548 Richmond St E7 permits · to 2025