thepermitmap

Street · 5722 of 8,567 by permit count

Building permits on Legion Rd N

The City of Toronto has 18 building permits on record for Legion Rd N, going back to 2008. Those permits created 28 homes and removed 0, a net change of +28. Declared construction value totals $841K. The most recent permit was applied for Aug 14, 2026 at 155 Legion Rd N.

Permits on record
182008–2026
Declared construction value
$841Kas filed, not adjusted
Homes created
28dwelling units
Homes removed
0net +28

Permits issued per year

20082026 (part year)

Most common work

  • Building Permit Related(PS)2 · 11%
  • New Building2 · 11%
  • Building Permit Related(MS)2 · 11%
  • Building Permit Related (DR)2 · 11%
  • Other(BA)1 · 6%
  • HVAC: Groups A & B1 · 6%
  • Interior Alterations1 · 6%
  • Shoring1 · 6%
  • Other(PS)1 · 6%
  • Inside and Outside Drains1 · 6%
  • Partial Permit - Foundation1 · 6%
  • Partial Permit - Shoring1 · 6%

Structures worked on

  • Apartment Building18 · 100%

Where this street runs

Mimico-Queensway 12 permits
Humber Bay Shores 6 permits

Most recent permits

Issued Work What was filed Value Status
Aug 14, 2026 Other(BA) Proposal for main entrance driveway restoration - the work includes removal and disposal of existing overburden and site components. New work includes concrete curbs and reinforced driveway, waterproofing membrane, expansion joints, unit pavers, gate arms, and associated site elements. The scope als $10K Open
Mar 5, 2020 HVAC: Groups A & B Proposal to install a cogeneration (CHP) unit and install, connect heat exchangers/pipes/pumps from CHP into HVAC boiler loop. $750K Open
Feb 19, 2020 Other(PS) Proposal to connect heat exchangers/pipes/pumps from CHP into DHW boiler loop. $20K Closed
Jan 11, 2013 Interior Alterations Interior alterations to convert 4 existing guest suites to condominium units (See related 04 104421BLD and 08 204692 BLD) Open
Oct 25, 2012 New Building Revision #1: Revisions to ground floor link corridor. Changes to ground floor, second floor and third floor podiums for parking and interior alterations.New 30-storey highrise condominium with 4 underground parking levels. (See 06-135967 for site plan application, and see 06-198751 for phase 1 of th New build
May 31, 2012 Building Permit Related(MS) HVAC Revision #1: Revisions to ground floor link corridor. Changes to ground floor, second floor and third floor podiums for parking and interior alterations.(New 28-storey highrise condominium with 4 underground parking levels.) Open
Apr 1, 2011 Backflow Prevention Devices (Water only) Installation of (1) backflow prevention device into an existing highrise condominium building. $10K Closed
Mar 8, 2011 Building Permit Related(PS) Plumbing - New 28-storey highrise condominium with 4 underground parking levels. Open
Jan 27, 2011 Partial Permit - Structural Framing Part Permit - New 30-storey highrise condominium with 4 underground parking levels. Closed
Jun 24, 2010 Partial Permit - Foundation REVISION #1 to columns and walls to accomidate above grade framing. Part Permit - New 28-storey highrise condominium with 4 level underground parking . Closed
Jun 4, 2010 Shoring REVISON to file 08-204692 SHO 00 PP to install additional racker. $1K Closed
Apr 20, 2010 New Building Interior alteration associated with permit #06-198751:- 8 loft units (#12 - 7th thru 22nd floors) splited into 16 units @ floor.- 8 large units (#8 - 13th thru 20th floors) converted into 8 smaller units plus 4 loft units (#9).A total of 12 more units created. New build
Apr 20, 2010 Building Permit Related(MS) Revision to HVAC associated with permit #06-198751-02 NB: Loft unit #12 on floors 7 to 22 (8 units total) converted into 16 separate units (one on each floor), larger unit #8 on floors 13, 15-19 (6 units total) converted into 9 units (6 flat and 3 loft units). Open
Apr 20, 2010 Building Permit Related(PS) Revision to plumbing associated with permit #06-198751-02 NB: Loft unit #12 on floors 7 to 22 (8 units total) converted into 16 separate units (one on each floor), larger unit #8 on floors 13, 15-19 (6 units total) converted into 9 units (6 flat and 3 loft units). Open
Jan 29, 2010 Building Permit Related (DR) Drain - New 28-storey highrise condominium with 4 underground parking levels. Open
Nov 4, 2009 Building Permit Related (DR) ** REVISION 2: as built conditions as indicated on drawing M-4A for P4 level **FOUNDATION INSIDE DRAINS - Construction of a new 30-storey condo with 3 levels of underground parking. Open
Nov 2, 2009 Partial Permit - Shoring Part Permit - New 28-storey highrise condominium with 4 underground parking levels. Closed
Aug 19, 2008 Inside and Outside Drains *Site Servicing for the iLoft* Drain - Construction of a new 28-storey condo with 3 levels of underground parking. $50K Closed

The 18 most recent of 18 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
18
City refresh
2026-09-13 10:24
Page built
2026-09-13
Sheet
STR-126