thepermitmap

Street · 357 of 8,516 by permit count

Building permits on Commissioners St

The City of Toronto has 426 building permits on record for Commissioners St, going back to 1984. Those permits created 0 homes and removed 2, a net change of -2. Declared construction value totals $202.8M. Half of the 398 permits issued here came through within 35 days of the application. The most recent permit was issued Oct 28, 2026 at 580 Commissioners St.

Permits on record
4261984–2026
Declared construction value
$202.8Mas filed, not adjusted
Homes created
0dwelling units
Homes removed
2net -2
Typical wait
35 days8 days slower than the city

Permits issued per year

20002026 (part year)

Zoning

Most common zone
EL87.4% of permits · by-law 60.10
In detached-house zones
0.0%38.0% below the city’s 38.0%
Permits with a zone
223of 426 on record
  • Employment Industrial222 · 100%
  • Open Space1 · 0%

The zoning categories the permits on Commissioners St fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Other streets in M4M

Logan Ave1,548 permits
Carlaw Ave1,190 permits
Eastern Ave793 permits
Curzon St500 permits
Booth Ave360 permits
Boulton Ave349 permits
First Ave333 permits
Morse St312 permits

Looking for one address on Commissioners St? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Oct 28, 2026 Other(BA) Proposal for removal of one(1) existing 45,600L diesel fuel aboveground storage tank, one(1) existing 15,000L gasoline fuel aboveground storage tank, and associated appurtenances. $1.5M Open
Oct 1, 2026 Building Permit Related(MS) HVAC - Proposal for interior alterations for the addition of (16) offices — Open
Oct 1, 2026 Building Permit Related(PS) Plumbing - Proposal for interior alterations for the addition of (16) offices — Open
Sep 30, 2026 Interior Alterations Proposal for interior alterations for the addition of (16) offices $100K Open
Sep 11, 2026 Building Permit Related(MS) HVAC - Proposed alterations for new electrical room. — Open
Sep 11, 2026 Building Permit Related(MS) HVAC - Proposal alterations for a new interior electrical room — Open
Sep 10, 2026 Building Permit Related(MS) HVAC - Proposal for new generator with vent pipe. — Open
Sep 8, 2026 Other(BA) Proposal for new generator with vent pipe. — Open
Sep 8, 2026 Addition(s) Proposal for addition of new electrical room to existing building. — Open
Sep 8, 2026 Interior Alterations Proposal alterations for a new interior electrical room. — Open
Sep 1, 2026 Electromagnetic Locks Install 1 electromagnetic locking device for 2 separate single doors including all life safety requirements $10K Open
Jul 22, 2026 Multiple Projects Roofing replacement form the level of the existing steel deck to the standing seam metal roofing, including new vapour barrier,new gutters, new penetration flashing details, new metal walkway with guardrails, new roof access hatch. New metal ladder.Mechanical upgrades including six new exhaust fans $6.0M Open
Jul 22, 2026 Building Permit Related(MS) HVAC - Roofing replacement form the level of the existing steel deck to the standing seam metal roofing, including new vapour barrier,new gutters, new penetration flashing details, new metal walkway with guardrails, new roof access hatch. New metal ladder.Mechanical upgrades including six new exhaus — Open
Jul 7, 2026 Other(TS) Revision 14 - Proposal to extend removal date REVISION 11 - temporary workshop/flex area to be included as part of the Pinewood StudioProposal emporary One-Storey Communications and Broadcasting Establishment building (temporary workshop/flex area) to be included as part of the Pinewood Toronto Stud — Open
Jul 6, 2026 Demolition Proposal for demolition and removal of the two basin portable structure — Demolition
Jul 6, 2026 Other(TS) Revision 14: Proposal to extend removal date. New Removal date: December 1, 2026REVISION 11 - temporary workshop/flex area to be included as part of the Pinewood StudioProposal to construct an addition to the temporary communication and broadcasting structure approved under permit 18-250917 TPS 00. — Open
Jun 23, 2026 Temporary Structures Proposal to erect temporary structures - wooden structures or modules with fabric in lieu of ceilings from June 23 to December 31 2026.South Boulevard of Commissioners St, near Munitions St, in the future transit ROW — Open
May 4, 2026 Interior Alterations Rev 01: The original design proposed replacing the existing gas-fired MAU and heating units. To align with the City¿s zero-emission requirement, the design has been revised to electric MAU and unit heaters.Convert paint spray room to repair area to install a wheel allignment machine and a wheeltrans — Open
Apr 9, 2026 Building Permit Related(MS) REV 01: The original design proposed replacing the existing gas-fired MAU and heating units. To align with the City¿s zero-emission requirement, the design has been revised to electric MAU and unit heaters.HVAC - To install a wheel allignment machine and a wheeltrans bus lift (TTC) — Open
Apr 9, 2026 Building Permit Related(PS) REV 01: The original design proposed replacing the existing gas-fired MAU and heating units. To align with the City¿s zero-emission requirement, the design has been revised to electric MAU and unit heaters.Plumbing - To install a wheel allignment machine and a wheeltrans bus lift (TTC) — Open
Mar 11, 2026 Building Permit Related(MS) HVAC - Proposal for interior alterations. — Open
Mar 9, 2026 Fire Alarm Proposal to upgrade fire alarm system. $700K Open
Mar 2, 2026 Interior Alterations Proposal for existing office interior alterations. $150K Open
Jan 29, 2026 Building Permit Related(PS) Plumbing - Proposal for interior alterations. — Closed
Dec 19, 2025 Fire Alarm Proposal for fire alarm upgrades. $700K Closed
Nov 27, 2025 Fire Alarm Proposal to upgrade fire alarm system. $700K Closed
Oct 14, 2025 Backflow Prevention Devices (Water only) Proposal to upsize domestic cold water service. $150K Closed
Aug 11, 2025 Change of Use Revision 01 - Revision to Permit 23 235370 to include: new kitchen millwork and appliances at ground floor; new washrooms and kitchenette on the second floor; associated work to HVAC, plumbing and electrical systems; and renaming second floor rooms.Interior renovation to support a Change of Use. Con — Closed
Aug 8, 2025 Building Permit Related(PS) Revision 01 - Revision to Permit 23 235370 to include: new kitchen millwork and appliances at ground floor; new washrooms and kitchenette on the second floor; associated work to HVAC, plumbing and electrical systems; and renaming second floor rooms.Plumbing - Interior renovation to support a Change — Closed
Aug 8, 2025 Building Permit Related(MS) Revision 01 - Revision to Permit 23 235370 to include: new kitchen millwork and appliances at ground floor; new washrooms and kitchenette on the second floor; associated work to HVAC, plumbing and electrical systems; and renaming second floor rooms.HVAC - Interior renovation to support a Change of U — Closed
Jul 28, 2025 New Building Proposal for construction of a domed winter salt storage bunker with concrete base. $600K New build
Jun 6, 2025 Backflow Prevention Devices (Water only) Proposal for installation of a domestic premise isolation backflow preventer to replace an existing one that cannot be repaired. $8K Closed
May 27, 2025 Other(BA) Ceremony and celebration sunshade structure (pavillion) as part of Port Lands Flood Protection project. Erection of glulam beam and metal panel pavilion structure. $85K Closed
May 20, 2025 Sign Building Permit Related 1 Wall Sign — Closed
May 7, 2025 Building Permit Related(MS) HVAC - Proposal for addition of (8) offices with full height walls. — Open
Apr 23, 2025 Other(BA) Convert existing oil water separator into a containment system. $75K Open
Apr 7, 2025 Interior Alterations Proposal for addition of (8) offices with full height walls. $150K Open
Mar 18, 2025 New Building Proposal of construction of a domed winter salt storage bunker with concrete base. $600K New build
Feb 14, 2025 Interior Alterations Revision 01 - Proposed changes to existing sprinkler system based on new layout for labs.--------------------------------------------------------------------------Renovation of existing training facility to a new type of training facility for the same owner. — Open
Nov 26, 2024 Demolition Proposal for demolition of the existing structure which consists of a one (1) storey warehouse and a two (2) office building. — Demolition

The 40 most recent of 426 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Commissioners St with a permit on record · 33

  • 39 Commissioners St2 permits · to 2021
  • 51 Commissioners St23 permits · to 2025
  • 54 Commissioners St1 permit · to 2016
  • 75 Commissioners St7 permits · to 2019
  • 80 Commissioners St4 permits · to 2026
  • 85 Commissioners St2 permits · to 2001
  • 95 Commissioners St5 permits · to 2020
  • 97 Commissioners St4 permits · to 2019
  • 99 Commissioners St2 permits · to 2019
  • 101 Commissioners St75 permits · to 2026
  • 130 Commissioners St2 permits · to 2020
  • 150 Commissioners St1 permit · to 2020
  • 225 Commissioners St10 permits · to 2024
  • 275 Commissioners St2 permits · to 2010
  • 281 Commissioners St5 permits · to 2025
  • 300 Commissioners St3 permits · to 2019
  • 301 Commissioners St15 permits · to 2023
  • 400 Commissioners St20 permits · to 2025
  • 440 Commissioners St4 permits · to 2026
  • 450 Commissioners St1 permit · to 2019
  • 475 Commissioners St14 permits · to 2018
  • 495 Commissioners St1 permit · to 1999
  • 500 Commissioners St118 permits · to 2026
  • 525 Commissioners St1 permit · to 2014
  • 535 Commissioners St1 permit · to 2010
  • 545 Commissioners St9 permits · to 2024
  • 560 Commissioners St5 permits · to 2024
  • 580 Commissioners St50 permits · to 2026
  • 595 Commissioners St15 permits · to 2016
  • 600 Commissioners St10 permits · to 2010
  • 650 Commissioners St1 permit · to 2015
  • 651 Commissioners St2 permits · to 2025
  • 675 Commissioners St11 permits · to 2021
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
426
Data through
2026-10-28
Refresh
Daily from the City
Sheet
STR-837