Street · 1181 of 8,516 by permit count
Building permits on Austin Ter
The City of Toronto has 161 building permits on record for Austin Ter, going back to 1998. Those permits created 20 homes and removed 10, a net change of +10. Declared construction value totals $26.4M. Half of the 150 permits issued here came through within 29 days of the application. The most recent permit was issued Jul 16, 2026 at 40 Austin Ter.
- Permits on record
- 1611998–2026
- Declared construction value
- $26.4Mas filed, not adjusted
- Homes created
- 20dwelling units
- Homes removed
- 10net +10
- Typical wait
- 29 days2 days slower than the city
Permits issued per year
Zoning
- Most common zone
- R71.4% of permits · by-law 10.10
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 98of 161 on record
The zoning categories the permits on Austin Ter fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M5R
Looking for one address on Austin Ter? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jul 16, 2026 | Deck | Proposal to replace existing rear yard deck and replacing existing basement walkout with min headroom of 2.1 m | $35K | Open |
| Jun 19, 2026 | Building Permit Related (DR) | Drain - Convert the existing duplex dwelling to a four unit dwelling. Interior alterations on all floors, third storey addition, new terrace over the reconstructed carport.- Previous permit issued 24 170411 recognized the building as a semi detached Duplex- Previous ZAP obtained the conversion to se | — | Open |
| Jun 19, 2026 | Building Permit Related(PS) | Plumbing - Convert the existing duplex dwelling to a four unit dwelling. Interior alterations on all floors, third storey addition, new terrace over the reconstructed carport.- Previous permit issued 24 170411 recognized the building as a semi detached Duplex- Previous ZAP obtained the conversion to | — | Open |
| Jun 18, 2026 | Building Permit Related(PS) | Plumbing - Convert the existing duplex dwelling to a four unit dwelling. Interior alterations on all floors, third storey addition, new terrace over the reconstructed carport. - Previous permit issued 24 170411 recognized the building as a semi detached Duplex- Previous ZAP obtained the conversion t | — | Open |
| Jun 18, 2026 | Building Permit Related (DR) | Drain - Convert the existing duplex dwelling to a four unit dwelling. Interior alterations on all floors, third storey addition, new terrace over the reconstructed carport. - Previous permit issued 24 170411 recognized the building as a semi detached Duplex- Previous ZAP obtained the conversion to s | — | Open |
| Mar 30, 2026 | Building Permit Related (DR) | Drain - PROPOSAL FOR CONSTRUCT NEW DETACHED 3 STOREY SINGLE FAMILY DWELLING, WITH FINISHED BASEMENT AND INTEGRAL GARAGE | — | Open |
| Mar 30, 2026 | Building Permit Related(PS) | Plumbing - PROPOSAL FOR CONSTRUCT NEW DETACHED 3 STOREY SINGLE FAMILY DWELLING, WITH FINISHED BASEMENT AND INTEGRAL GARAGE | — | Open |
| Mar 30, 2026 | New Building | PROPOSAL FOR CONSTRUCT NEW DETACHED 3 STOREY SINGLE FAMILY DWELLING, WITH FINISHED BASEMENT AND INTEGRAL GARAGE | $3.0M | New build |
| Mar 20, 2026 | Building Permit Related(PS) | Plumbing - Proposal to complete renovation of two existing ground floor washrooms, to improve accessibility and functionality by creating barrier-free facilities and incorporating two new accessible unisex washrooms, within university health network hillcrest centre. | — | Closed |
| Mar 20, 2026 | Building Permit Related(MS) | HVAC - Proposal to complete renovation of two existing ground floor washrooms, to improve accessibility and functionality by creating barrier-free facilities and incorporating two new accessible unisex washrooms, within university health network hillcrest centre. | — | Closed |
| Mar 20, 2026 | Building Permit Related(MS) | HVAC - Convert the existing duplex dwelling to a four unit dwelling. Interior alterations on all floors, third storey addition, new terrace over the reconstructed carport.- Previous permit issued 24 170411 recognized the building as a semi detached Duplex- Previous ZAP obtained the conversion to sem | — | Open |
| Mar 20, 2026 | Building Permit Related(MS) | HVAC - Convert the existing duplex dwelling to a four unit dwelling. Interior alterations on all floors, third storey addition, new terrace over the reconstructed carport. - Previous permit issued 24 170411 recognized the building as a semi detached Duplex- Previous ZAP obtained the conversion to se | — | Open |
| Feb 23, 2026 | Interior Alterations | Proposal to complete renovation of two existing ground floor washrooms, to improve accessibility and functionality by creating barrier-free facilities and incorporating two new accessible unisex washrooms, within university health network hillcrest centre. | $80K | Closed |
| Feb 4, 2026 | Garage Repair/Reconstruction | Proposal for structural rehabilitation to the existing concrete and asphalt structures of the parking garage | $878K | Open |
| Oct 9, 2025 | Back Water Valve (Sewer only) | Proposal to install a backwater valve. | — | Closed |
| Sep 5, 2025 | Multiple Projects | Convert the existing duplex dwelling to a four unit dwelling. Interior alterations on all floors, third storey addition, new terrace over the reconstructed carport. - Previous permit issued 24 170411 recognized the building as a semi detached Duplex- Previous ZAP obtained the conversion to semi-deta | $75K | Open |
| Sep 5, 2025 | Multiple Projects | Convert the existing duplex dwelling to a four unit dwelling. Interior alterations on all floors, third storey addition, new terrace over the reconstructed carport.- Previous permit issued 24 170411 recognized the building as a semi detached Duplex- Previous ZAP obtained the conversion to semi-detac | $75K | Open |
| Aug 12, 2025 | Building Permit Related(MS) | Revision; Duct routing and duct riser locations have been adjusted due to siteconditions. | — | Closed |
| Aug 12, 2025 | Building Permit Related(MS) | Revision: Duct routing and duct riser locations have been adjusted due to siteconditions. | — | Closed |
| Apr 17, 2025 | Backflow Prevention Devices (Water only) | Proposal for existing RP backflow preventer replacement. | $20K | Closed |
| Mar 28, 2025 | Multiple Projects | Revision 01 - Raising up existing carport to second-floor level.----------------------------------------------------------Proposed underpin of existing foundation, new underground drains and plumbing locations. | — | Closed |
| Mar 28, 2025 | Multiple Projects | Revision 01 - Raising up existing carport to second-floor level.----------------------------------------------------------Proposed underpin of existing foundation, new underground drains and plumbing locations. | — | Closed |
| Feb 21, 2025 | Building Permit Related(PS) | REVISION 02: revision proposal regarding the incoming domestic water pipe revised from a 100ø combined fire and water pipe to new 100ø incoming domestic water service pipe and 150ø incoming fire service pipe to the building main as shown in drawing M100 Site PlanREVISION 01: -Plumbing and drainage r | — | Closed |
| Jan 16, 2025 | Electromagnetic Locks | Installation of two electromagnetic maglocks on the 4th floor stairwell doors. | $30K | Closed |
| Dec 10, 2024 | Interior Alterations | REVISION 1: Revision permit regarding the generator from a skin-tight enclosure to a walk-in enclosure in response to the Order to Comply Notice (Order Number: 24 234982 OTC 00 VI)- Proposal for interior alterations on all levels in the existing hospital- Heating boiler plant replacement, including | — | Closed |
| Oct 21, 2024 | Building Permit Related(PS) | Plumbing - Proposed underpin of existing foundation, new underground drains and plumbing locations. | — | Closed |
| Oct 21, 2024 | Building Permit Related(PS) | propose to construct a three story addition above existing garage | — | Open |
| Oct 21, 2024 | Building Permit Related(MS) | propose to construct a three story addition above existing garage | — | Open |
| Oct 21, 2024 | Addition(s) | Proposal to construct a three story addition above existing garage, to add fourth dwelling unit to existing 3 units residential building. | $600K | Open |
| Oct 16, 2024 | Building Permit Related (DR) | Drain - Proposed underpin of existing foundation, new underground drains and plumbing locations. | — | Closed |
| Oct 10, 2024 | Building Permit Related(PS) | Plumbing - Proposal to for interior alterations including install new handwash sink and replace kitchen sink. | — | Closed |
| Oct 2, 2024 | Interior Alterations | Proposal to for interior alterations including install new handwash sink and replace kitchen sink. | $100K | Closed |
| Jul 8, 2024 | Interior Alterations | Proposed interior alterations to the basement to create an additional unit (3 units). | $20K | Closed |
| Apr 30, 2024 | Building Permit Related (DR) | Drain - Proposal to construct interior alterations to existing semi detached SFD to add a basement second unit. Also to add a new front basement walkout and reconstruct the existing carport. | — | Closed |
| Apr 30, 2024 | Building Permit Related(PS) | Plumbing - Proposal to construct interior alterations to existing semi detached SFD to add a basement second unit. Also to add a new front basement walkout and reconstruct the existing carport. | — | Closed |
| Apr 30, 2024 | Multiple Projects | Proposal to construct interior alterations to existing semi detached SFD to add a basement second unit. Also to add a new front basement walkout and reconstruct the existing carport, basement walkout, front porch. | $900K | Open |
| Apr 29, 2024 | Building Permit Related (DR) | Drain - Proposal to construct interior alterations to existing dwelling to add a basement 2nd unit. Reconstruct garage port and add new basement walkout | — | Closed |
| Apr 29, 2024 | Building Permit Related(PS) | Plumbing - Proposal to construct interior alterations to existing dwelling to add a basement 2nd unit. Reconstruct garage port and add new basement walkout | — | Closed |
| Apr 29, 2024 | Multiple Projects | Proposal to construct interior alterations to existing dwelling to add a basement 2nd unit. Reconstruct garage port and add new basement walkout, front porch | $900K | Open |
| Apr 12, 2024 | Sprinklers | Proposal to install sprinklers on all levels in the existing hospital. | $100K | Closed |
The 40 most recent of 161 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Austin Ter with a permit on record · 31
- 1 Austin Ter28 permits · to 2026
- 5 Austin Ter2 permits · to 2007
- 6 Austin Ter5 permits · to 2017
- 7 Austin Ter21 permits · to 2013
- 8 Austin Ter1 permit · to 2017
- 10 Austin Ter7 permits · to 2024
- 14 Austin Ter2 permits · to 2024
- 15 Austin Ter3 permits · to 2021
- 16 Austin Ter2 permits · to 2021
- 17 Austin Ter6 permits · to 2023
- 18 Austin Ter12 permits · to 2026
- 19 Austin Ter15 permits · to 2026
- 20 Austin Ter12 permits · to 2026
- 22 Austin Ter8 permits · to 2025
- 23 Austin Ter3 permits · to 2006
- 24 Austin Ter12 permits · to 2026
- 26 Austin Ter3 permits · to 2004
- 28 Austin Ter1 permit · to 2004
- 29 Austin Ter1 permit · to 2019
- 32 Austin Ter1 permit · to 2011
- 34 Austin Ter3 permits · to 2010
- 36 Austin Ter4 permits · to 2020
- 37 Austin Ter2 permits · to 2022
- 38 Austin Ter1 permit · to 2001
- 40 Austin Ter1 permit · to 2026
- 42 Austin Ter2 permits · to 2012
- 47 Austin Ter18 permits · to 2026
- 48 Austin Ter5 permits · to 2018
- 50 Austin Ter1 permit · to 2025
- 60 Austin Ter1 permit · to 2007
- 62 Austin Ter4 permits · to 2024