Structure · 71 of 153 by permit count
Other (New Housing) building permits in Toronto
The City of Toronto has 351 building permits on other (new housing) structures on record for Toronto, going back to 2004. Those permits created 140 homes and removed 3, a net change of +137. Declared construction value totals $26.5M. Half of the 343 permits issued here came through within 46 days of the application. The most recent permit was applied for Sep 29, 2026 at 75 Northcote Ave.
- Permits on record
- 3512004–2026
- Declared construction value
- $26.5Mas filed, not adjusted
- Homes created
- 140dwelling units
- Homes removed
- 3net +137
- Typical wait
- 46 days19 days slower than the city
Permits issued per year
Zoning
- Most common zone
- RD58.6% of permits · by-law 10.20
- In detached-house zones
- 58.6%20.6% above the city’s 38.0%
- Permits with a zone
- 152of 351 on record
The zoning categories the permits in Other (New Housing) fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Sep 29, 2026 | 75 Northcote Ave | Interior Alterations | Revision No.1: Legalize the multi-tenant house with 6 dwelling rooms. Proposed Fire Safety Retrofit Work including installation of new fire separation at 3rd floor hallway, replacement of existing water line with new, installation of new sprinkler system and installation of new fire alarm system | — | Open |
| Aug 27, 2026 | 75 Northcote Ave | Building Permit Related (DR) | Drain - Convert the existing dwelling to a 7 bedroom (single occupancy) rooming house. Proposed Fire Safety Retrofit Work including installation of new fire separation at 3rd floor hallway, replacement of existing water line with new 2", installation of new sprinkler system and installation of new f | — | Open |
| Apr 14, 2026 | 23 Brumwell St | Demolition | Proposal to demolish existing 1 storey SFD, construct new 2 storey multi-units building. (8 dwelling rooms in basement, 2 units on first and second floors) | — | Demolition |
| Apr 14, 2026 | 23 Brumwell St | New Building | Proposal to demolish existing 1 storey SFD, construct new 2 storey multi-units building. (8 dwelling rooms in basement, 2 units on first and second floors) | $1K | New build |
| Apr 14, 2026 | 23 Brumwell St | Building Permit Related (DR) | Drain - Proposal to demolish existing 1 storey SFD, construct new 2 storey multi-units building. (8 dwelling rooms in basement, 2 units on first and second floors) | — | Closed |
| Apr 14, 2026 | 23 Brumwell St | Building Permit Related(PS) | Plumbing - Proposal to demolish existing 1 storey SFD, construct new 2 storey multi-units building. (8 dwelling rooms in basement, 2 units on first and second floors) | — | Closed |
| Apr 14, 2026 | 23 Brumwell St | Building Permit Related(MS) | HVAC - Proposal to demolish existing 1 storey SFD, construct new 2 storey multi-units building. (8 dwelling rooms in basement, 2 units on first and second floors) | — | Closed |
| Feb 18, 2026 | 2502 Lake Shore Blvd W | New Building | Revision 01: Revision to permit to revise the layout to increase the number of dwelling units from 4 unit detached houseplex to 6 unit apartment building | — | New build |
| Jul 21, 2025 | 84 Vauxhall Dr | Addition(s) | REV 01: Changes to floor plan to exclude second suite.Proposal for secondary suite addition to the existing detached house | — | Closed |
| Oct 30, 2024 | 316 Campbell Ave | Demolition | Proposed demolition of residential dwellings 316-336 Campbell Ave | — | Demolition |
| Apr 10, 2024 | 84 Vauxhall Dr | Building Permit Related(PS) | Plumbing - Proposal for addition to the existing detached house | — | Open |
| Jan 27, 2023 | 489 Parkside Dr | New Building | Rev 06: add 4 m2 portion to solar roof platform, and add perimeter and island solar panels | — | New build |
| Oct 8, 2019 | 8 Irmac Crt | Other(SR) | Conversion of rear building - 2 Buildings on same lot (Rear building is no longer ancillary structure to primary building) | $50K | Closed |
| Feb 6, 2019 | 489 Parkside Dr | Building Permit Related(MS) | REV03- changes to HVAC LayoutHVAC Revision - Proposal to demolish existing 2 storey duplex and construct new 3 storey 4 unit dwelling with rear parking. | — | Open |
| Jan 15, 2019 | 169 Jones Ave | New Building | Revision to parking garage for parking stacker system to service stacked. Townhouse development - Elimination of sprinkler system.LEAD FILE - Proposal to construct a 3 storey residential building containing a total of 12 residential units (12 stacked town homes). Note: See separate file for attached | — | New build |
| Feb 5, 2018 | 38 Beaconsfield Ave | Building Permit Related(MS) | HVAC - Construct a new two storey detached Coach House with a mezzanine level at rear of property (75.8m2) | — | Closed |
| Nov 17, 2017 | 38 Beaconsfield Ave | Building Permit Related(PS) | Plumbing - Construct a new two storey detached Coach House at rear of property (75.8m2) | — | Closed |
| Nov 17, 2017 | 169 Jones Ave | Building Permit Related(MS) | HVAC - Proposal to construct a 3 storey residential building containing a total of 12 residential units (10 stacked townhomes and 2 attached dwelling units). Note: See separate file for attached garage 16 104816 BLD. | — | Open |
| Nov 17, 2017 | 169 Jones Ave | Building Permit Related(PS) | Plumbing - Proposal to construct a 3 storey residential building containing a total of 12 residential units (10 stacked townhomes and 2 attached dwelling units). Note: See separate file for attached garage 16 104816 BLD. | — | Open |
| Nov 16, 2017 | 38 Beaconsfield Ave | New Building | Construct a new two storey detached Coach House with a mezzanine level at rear of property (75.8m2) | $500K | New build |
| Nov 9, 2017 | 1398 Bayview Ave | New Building | Revision 01: interior alterationsProposal to construct a new 3 storey with basement 4 unit dwelling building. See demo, ZZC, and COA. | — | New build |
| Oct 6, 2017 | 169 Jones Ave | Building Permit Related (DR) | Revise drainage. | — | Open |
| Aug 21, 2017 | 169 Jones Ave | Partial Permit - Foundation | Conditional Permit - Part Permit - FOUNDATION - Proposal to construct a 3 storey residential building containing a total of 12 residential units (12 stacked townhomes). Note: See separate file for attached garage 16 104816 BLD. | — | Closed |
| Apr 19, 2017 | 63 Dagmar Ave | Building Permit Related(MS) | HVAC - Proposal to construct a new duplex (2 units) on new severed lot (198.3 sq.m + 64.6 sq.m finished basement). Refer to zoning review 13-205195 ZZC. | — | Open |
| Jan 26, 2017 | 108 Barrington Ave | Building Permit Related(MS) | Revision # 01 - To the HVAC system in the basement of the existing 2 unit dwelling.HVAC - Proposal to maintain portion of the existing two unit detached dwelling, and construct a one storey rear addition and second storey addition, 50% of external walls are not being maintained, thus considered a ne | — | Closed |
| Jan 12, 2017 | 1398 Bayview Ave | Building Permit Related(MS) | Revision 1: change to HVAC layoutHVAC - Proposal to construct a new 3 storey with basement 4 unit dwelling building. See demo, ZZC, and COA. | — | Closed |
| Dec 8, 2016 | 1398 Bayview Ave | Building Permit Related(PS) | Revision 01: main level plan revisedPlumbing - Proposal to construct a new 3 storey with basement 4 unit dwelling building. See demo, ZZC, and COA. | — | Closed |
| Oct 11, 2016 | 2 Hyde Ave | New Building | Revision #1 - washroom added in basementProposed new three-family dwelling | — | New build |
| Jun 9, 2016 | 63 Dagmar Ave | New Building | Proposal to construct a new duplex (2 units) on new severed lot (198.3 sq.m + 64.6 sq.m finished basement). Refer to zoning review 13-205195 ZZC. | $400K | New build |
| Mar 8, 2016 | 2 Hyde Ave | Building Permit Related (DR) | Drain - Proposed new three family dwelling | — | Closed |
| Mar 8, 2016 | 2 Hyde Ave | Building Permit Related(PS) | Plumbing - Proposed new three family dwelling | — | Closed |
| Mar 8, 2016 | 2 Hyde Ave | Building Permit Related(MS) | HVAC - Proposed new three family dwelling | — | Closed |
| Jan 25, 2016 | 53 Saulter St | Building Permit Related(PS) | Plumbing - UNIT 5 - Proposal to construct 5 three storey + mezzanine live/work townhomes. See LEAD FILE 15 172051 BLD for all drawings and documents. | — | Closed |
| Jan 25, 2016 | 53 Saulter St | Building Permit Related(PS) | Plumbing - UNIT 4 - Proposal to construct 5 three storey + mezzanine live/work townhomes. See LEAD FILE 15 172051 BLD for all drawings and documents. | — | Closed |
| Jan 25, 2016 | 53 Saulter St | Building Permit Related(PS) | Plumbing - UNIT 3 - Proposal to construct 5 three storey + mezzanine live/work townhomes. See LEAD FILE 15 172051 BLD for all drawings and documents. | — | Closed |
| Jan 25, 2016 | 53 Saulter St | Building Permit Related(PS) | Plumbing - UNIT 2 - Proposal to construct 5 three storey + mezzanine live/work townhomes. See LEAD FILE 15 172051 BLD for all drawings and documents. | — | Closed |
| Jan 25, 2016 | 53 Saulter St | Building Permit Related(PS) | Plumbing - LEAD FILE - UNIT 1 - Proposal to construct 5 three storey + mezzanine live/work townhomes. | — | Closed |
| Dec 1, 2015 | 26 OLD FOREST HILL RD | Demolition | Proposal to demolish existing house and build new house. | — | Demolition |
| Oct 29, 2015 | 489 Parkside Dr | Building Permit Related(PS) | Plumbing - Proposal to demolish existing 2 storey duplex and construct new 3 storey 4 unit dwelling with rear parking. | — | Closed |
| Oct 16, 2015 | 53 Saulter St | Building Permit Related(MS) | HVAC - LEAD FILE - UNIT 1 - Proposal to construct 5 three storey + mezzanine live/work townhomes. | — | Closed |
The 40 most recent of 351 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.