Street · 1423 of 8,516 by permit count
Building permits on Pears Ave
The City of Toronto has 136 building permits on record for Pears Ave, going back to 1986. Those permits created 6 homes and removed 2, a net change of +4. Declared construction value totals $15.3M. Half of the 130 permits issued here came through within 27 days of the application. The most recent permit was issued Oct 9, 2026 at 124 PEARS AVE.
- Permits on record
- 1361986–2026
- Declared construction value
- $15.3Mas filed, not adjusted
- Homes created
- 6dwelling units
- Homes removed
- 2net +4
- Typical wait
- 27 dayscity median
Permits issued per year
Zoning
- Most common zone
- R97.8% of permits · by-law 10.10
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 92of 136 on record
The zoning categories the permits on Pears Ave fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M5R
Looking for one address on Pears Ave? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 9, 2026 | Interior Alterations | REV 02: Revision per drawingsRevision 01 - commerical units at the south-east corner of the building, over the 1st, 2nd and 3rd floors, for office use. The space will consist of open office space, washrooms, private offices, a boardroom and kitchens. The spaces are connected vertically with a spiral | — | Open |
| Sep 29, 2026 | Building Permit Related(MS) | Revision 01: Revised drawingsHVAC - Interior fit-up of the existing commerical units at the south-east corner of the building, over the 1st, 2nd and 3rd floors, for office use. The space will consist of open office space, washrooms, private offices, a boardroom and kitchens. The spaces are connected | — | Open |
| Sep 25, 2026 | Building Permit Related(PS) | Revision 01: Revised drawingsPlumbing - Interior fit-up of the existing commerical units at the south-east corner of the building, over the 1st, 2nd and 3rd floors, for office use. The space will consist of open office space, washrooms, private offices, a boardroom and kitchens. The spaces are conne | — | Open |
| Sep 23, 2026 | Interior Alterations | Garage Emergency Lighting Upgrade | $100K | Open |
| Sep 21, 2026 | Unspecified | Deferred Fees from folder 20 163127 (RSN-5912708) ZoningProcess RSN 80635810 | — | Open |
| Sep 14, 2026 | Garage Repair/Reconstruction | Parking Garage Repairs. | $450K | Open |
| Sep 14, 2026 | Building Permit Related(MS) | HVAC - Parking Garage Repairs. | — | Open |
| Sep 25, 2025 | Garage Repair/Reconstruction | Proposal for localized garage repairs. | $142K | Open |
| Jun 17, 2025 | Other(MS) | Proposal to Supply and install new VRF's for site. | $1.2M | Open |
| Dec 9, 2024 | Building Permit Related(MS) | HVAC - Proposal to demolish existing sunroom addition and construct a new sunroom and interior alterations on all floors. | — | Closed |
| Aug 22, 2024 | Building Permit Related(MS) | Revision to HVAC - new HVAC design (full drawing has not been bubbled) | — | Open |
| Aug 13, 2024 | Demolition | Proposal to demolish the existing 2 1/2 storey SFD-detached dwelling. | — | Demolition |
| Aug 6, 2024 | Building Permit Related (DR) | Drain - Proposal to construct a new 3-Storey duplex detached house with a finished basement.See also 24 161148 DEM and 23 173305 ZAP. | — | Open |
| Aug 6, 2024 | Building Permit Related(PS) | Plumbing - Proposal to construct a new 3-Storey duplex detached house with a finished basement.See also 24 161148 DEM and 23 173305 ZAP. | — | Open |
| Aug 6, 2024 | Building Permit Related(MS) | HVAC - Proposal to construct a new 3-Storey duplex detached house with a finished basement.See also 24 161148 DEM and 23 173305 ZAP. | — | Open |
| Aug 6, 2024 | New Building | Proposal to construct a new 3-Storey Duplex detached house with a finished basement.See also 24 161148 DEM and 23 173305 ZAP. (Existing SFD House will be demolished). | $1.0M | New build |
| Jul 25, 2024 | Multiple Projects | Proposal to demolish existing sunroom addition and construct a new sunroom and interior alterations on all floors. | $450K | Closed |
| Jul 25, 2024 | Building Permit Related(PS) | Plumbing - Proposal to demolish existing sunroom addition and construct a new sunroom and interior alterations on all floors. | — | Closed |
| Apr 16, 2024 | Multiple Projects | Revision 01: increase the third floor interior ceiling height from 8'-6" to 9'-1"To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition and interior alterations to the existing dwelling. | — | Closed |
| Jan 8, 2024 | New Building | REVISION 01: INSTALL SHORING permitProposal to construct a New 3-Storey Single Family Dwelling Detached House, with a stair enclosure on the rooftop for roof access, including a new detached garage abutting the Lane. Existing SFD Detached House will be demolished. | — | New build |
| Jan 4, 2024 | Party Wall Admin Permits | party wall permit for at 77 Pears Ave | $4K | Open |
| Oct 30, 2023 | Multiple Projects | Proposed interior renovation, new dormer on third floor front wall, and modified roof slope at the front. | $10K | Closed |
| Oct 23, 2023 | Sprinklers | Sprinkler System modification to account for new wall changes | $25K | Closed |
| Aug 29, 2023 | Building Permit Related(PS) | Plumbing - Interior alterations to offices in suite 400 - Finnegan Marshall | — | Closed |
| Aug 29, 2023 | Building Permit Related(MS) | HVAC - Interior alterations to offices in suite 400 - Finnegan Marshall | — | Closed |
| Aug 25, 2023 | Interior Alterations | Interior alterations to offices in suite 400 - Finnegan Marshall | $750K | Closed |
| Aug 16, 2023 | Building Permit Related(MS) | HVAC - o alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition and interior alterations to the existing dwelling. | — | Closed |
| Aug 9, 2023 | Building Permit Related(PS) | Plumbing - o alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition and interior alterations to the existing dwelling. | — | Closed |
| May 16, 2023 | Partial Permit - Shoring | This Folder was closed by the system. PP child folders cannot be created using the 'Create Child' button.The n_ParentRSN was: 5182906 | — | Closed |
| Jan 9, 2023 | Building Permit Related(PS) | Plumbing - DEMOLISH EXISTING 3 STOREY SINGLE FAMILY DETACHED HOUSE(2) CONSTRUCT PROPOSED 3 STOREY SINGLE FAMILY DETACHED HOUSEWITH A ROOFTOP DECK(3) CONSTRUCT NEW DETACHED 2-STOREY GARAGE ABUTTING THE LANEWAY | — | Closed |
| Jan 6, 2023 | Demolition | DEMOLISH EXISTING 3 STOREY SINGLE FAMILY DETACHED HOUSE | — | Demolition |
| Jan 6, 2023 | Building Permit Related (DR) | Drain - DEMOLISH EXISTING 3 STOREY SINGLE FAMILY DETACHED HOUSE(2) CONSTRUCT PROPOSED 3 STOREY SINGLE FAMILY DETACHED HOUSEWITH A ROOFTOP DECK(3) CONSTRUCT NEW DETACHED 2-STOREY GARAGE ABUTTING THE LANEWAY | — | Closed |
| Jan 6, 2023 | Building Permit Related(MS) | HVAC - DEMOLISH EXISTING 3 STOREY SINGLE FAMILY DETACHED HOUSE(2) CONSTRUCT PROPOSED 3 STOREY SINGLE FAMILY DETACHED HOUSEWITH A ROOFTOP DECK(3) CONSTRUCT NEW DETACHED 2-STOREY GARAGE ABUTTING THE LANEWAY | — | Closed |
| Jun 4, 2021 | Building Permit Related(PS) | Plumbing - Proposal for multiple projects to an existing 2 storey SFD-townhouse. Scope of work includes a rear 2nd floor addition, a new 3rd floor addition, interior alterations, a 3rd floor deck, new front porch, a detached garage and a rear yard pergola. See also 20 123908 ZZC, 20 175071 MV and Fi | — | Open |
| Jun 4, 2021 | Multiple Projects | Proposal for multiple projects to an existing 2 storey SFD-townhouse. Scope of work includes a rear 2nd floor addition, a new 3rd floor addition, interior alterations, a 3rd floor deck, new front porch, a detached garage and a rear yard pergola. See also 20 123908 ZZC, 20 175071 MV and Final and Bin | $800K | Open |
| Apr 8, 2021 | Re-Roofing/Re-Cladding | Proposal for exterior walls repairs in the existing apartment building. | $1.6M | Closed |
| Nov 17, 2020 | Interior Alterations | Proposal for interior alterations to the master ensuite washroom and the kitchen layout. | $50K | Open |
| Nov 17, 2020 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to the master ensuite washroom and the kitchen layout. | — | Open |
| Apr 16, 2020 | Building Permit Related(MS) | HVAC - Proposal to construct a 3rd floor addition, 2 storey rear addition and interior alterations to the existing single family dwelling. | — | Closed |
| Feb 24, 2020 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to existing residential suite - UNIT 6C | — | Closed |
The 40 most recent of 136 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Pears Ave with a permit on record · 28
- 33 Pears Ave5 permits · to 2008
- 37 Pears Ave2 permits · to 2023
- 39 Pears Ave3 permits · to 2024
- 41 Pears Ave2 permits · to 2005
- 43 Pears Ave6 permits · to 2017
- 45 Pears Ave6 permits · to 2024
- 49 Pears Ave3 permits · to 2024
- 53 Pears Ave2 permits · to 1998
- 57 Pears Ave4 permits · to 1998
- 59 Pears Ave8 permits · to 2014
- 63 Pears Ave6 permits · to 2024
- 65 Pears Ave3 permits · to 2002
- 73 Pears Ave5 permits · to 2019
- 75 Pears Ave5 permits · to 2024
- 77 Pears Ave3 permits · to 2024
- 79 Pears Ave1 permit · to 1998
- 83 Pears Ave4 permits · to 2020
- 87 Pears Ave1 permit · to 2005
- 89 Pears Ave1 permit · to 2019
- 91 Pears Ave3 permits · to 2019
- 95 Pears Ave1 permit · to 2000
- 103 Pears Ave5 permits · to 2002
- 122 Pears Ave2 permits · to 1999
- 124 Pears Ave14 permits · to 2026
- 128 Pears Ave1 permit · to 2005
- 138 Pears Ave17 permits · to 2026
- 142 Pears Ave11 permits · to 2025
- 160 Pears Ave12 permits · to 2023