thepermitmap

Postal area · 98 of 98 by permit count

Building permits in M7A

The City of Toronto has 800 building permits on record for the M7A postal area, going back to 1995. Declared construction value totals $1.2B. Half of the 753 permits issued here came through within 15 days of the application. The most recent permit was issued Oct 30, 2026 at 900 Bay St.

Permits on record
8001995–2026
Declared construction value
$1.2Bas filed, not adjusted
Homes created
0dwelling units
Homes removed
0net +0
Typical wait
15 days12 days faster than the city

Permits issued per year

20002026 (part year)

Zoning

Most common zone
CR100.0% of permits · by-law 40.10
In detached-house zones
0.0%38.0% below the city’s 38.0%
Permits with a zone
178of 800 on record
  • Commercial Residential178 · 100%

The zoning categories the permits in M7A fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Most recent permits

Issued Address Work What was filed Value Status
Oct 30, 2026 900 Bay St Interior Alterations Revision 01 - Revision to project scope and construction phasing, including removal of Mowat Tower Levels 15 and 16 from the permit and addition of elevator lobby finish work for Levels 3 through 14Proposed Interior Fit-out to existing floors 3 to 16 (inclusive). — Open
Oct 29, 2026 900 Bay St Sprinklers REV: Proposal for sprinkler. — Open
Oct 23, 2026 900 Bay St Building Permit Related(MS) HVAC - INTERIOR FIT-OUTHEPBURN - FLOORS 3 TO 7 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 — Open
Oct 23, 2026 900 Bay St Interior Alterations INTERIOR FIT-OUTHEPBURN - FLOORS 3 TO 7 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 $28.6M Open
Oct 23, 2026 900 Bay St Building Permit Related(PS) Plumbing - INTERIOR FIT-OUTHEPBURN - FLOORS 3 TO 7 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 — Open
Oct 22, 2026 900 Bay St Sprinklers Rev 01 - Proposed alterations to sprinkler system leve 3-14Proposal for sprinkler. — Open
Oct 21, 2026 900 Bay St Sprinklers Proposal for sprinklers for Hepburn Tower Level 3-7. $200K Open
Oct 21, 2026 900 Bay St Sprinklers Proposal for sprinklers for Hearst Tower Level 8-11. $200K Open
Oct 21, 2026 900 Bay St Sprinklers Proposal for sprinklers for Hearst Tower Level 8-10. $200K Open
Oct 21, 2026 900 Bay St Sprinklers Proposal for sprinklers for Hearst Tower Level 3-7. $200K Open
Oct 14, 2026 900 Bay St Building Permit Related(MS) HVAC - Proposed interior alterations - interior fit-out for following areas; Ground Floor 900 bay lobby (addition of 2 Security Desks, Secured Glazing and Turnstiles), 2nd floor Hearst lobby (to add relocated Conference Reception Desk), Basement 2 (addition of Pallet scanner and Parcel scanner area) — Open
Oct 14, 2026 900 Bay St Interior Alterations Proposed interior alterations - interior fit-out for following areas; Ground Floor 900 bay lobby (addition of 2 Security Desks, Secured Glazing and Turnstiles), 2nd floor Hearst lobby (to add relocated Conference Reception Desk), Basement 2 (addition of Pallet scanner and Parcel scanner area), and B $6.2M Open
Sep 29, 2026 900 Bay St Alternative Solution Proposal for evaluation of alternative solutions — Closed
Sep 24, 2026 900 Bay St Other(BA) Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 9-13.-----------------------------------------------------------Proposal for interior alteration on floor 8-13 of Ferguson Tower — Open
Sep 17, 2026 900 Bay St Electromagnetic Locks Proposal for maglock installation: six maglocks for Levels 3-8 and six maglocks for Levels 9-15 (Ferguson Tower) $50K Open
Sep 11, 2026 900 Bay St Building Permit Related(PS) Revision 01 - Revision to project scope and construction phasing, including removal of Mowat Tower Levels 15 and 16 from the permit and addition of elevator lobby finish work for Levels 3 through 14Plumbing - Proposed Interior Fit-out to existing floors 3 to 16 (inclusive). — Open
Sep 11, 2026 900 Bay St Building Permit Related(MS) Revision 01 - Revision to project scope and construction phasing, including removal of Mowat Tower Levels 15 and 16 from the permit and addition of elevator lobby finish work for Levels 3 through 14HVAC - Proposed Interior Fit-out to existing floors 3 to 16 (inclusive). — Open
Sep 10, 2026 111 Wellesley St W Other(TS) Demountable stage for entertainers for performing on for event — Closed
Sep 9, 2026 15 Grosvenor St Building Permit Related(MS) HVAC - Proposal to demolish the existing conference room and expand the mailroom to provide additional workspace. — Open
Sep 9, 2026 900 Bay St Interior Alterations Revision 01: Permit revision to 25 -238578 BLD and HVACProposed interior alterations for interior fit-out for following areas:- Podium - ground floor (between grids 34 to 42 & N TO V) and 2nd floor (between grids 48 to 64 & AA TO DD) and ground floor touchdown space.FSU permit see #25 241497 FSU 00 — Open
Sep 1, 2026 15 Grosvenor St Interior Alterations Proposal to demolish the existing conference room and expand the mailroom to provide additional workspace. $67K Open
Aug 31, 2026 900 Bay St Interior Alterations REVISION - as per the attached cover letterProposed Interior Fit-out to existing floors 17 to 24 (inclusive). — Open
Aug 31, 2026 900 Bay St Building Permit Related(MS) REVISION - as per the attached cover letterHVAC - Proposed Interior Fit-out to existing floors 17 to 24 (inclusive). — Open
Aug 31, 2026 900 Bay St Building Permit Related(PS) REVISION - as per the attached cover letterPlumbing - Proposed Interior Fit-out to existing floors 17 to 24 (inclusive). — Open
Aug 28, 2026 900 Bay St Building Permit Related(MS) HVAC - INTERIOR FIT-OUTHEARST - FLOORS 8 TO 10 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 8 TO 10 — Open
Aug 28, 2026 900 Bay St Building Permit Related(PS) Plumbing - INTERIOR FIT-OUTHEARST - FLOORS 3 TO 7 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 — Open
Aug 28, 2026 900 Bay St Building Permit Related(PS) Plumbing - INTERIOR FIT-OUTHEARST - FLOORS 8 TO 10 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 8 TO 10 — Open
Aug 28, 2026 900 Bay St Interior Alterations Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 3-8.--------------------------------------------------------Proposal for interior alteration on floor 3-7 of Ferguson Tower — Open
Aug 28, 2026 900 Bay St Building Permit Related(PS) Plumbing - INTERIOR FIT-OUTHEPBURN - FLOORS 8 TO 11 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 8 TO 11 — Open
Aug 28, 2026 900 Bay St Building Permit Related(MS) HVAC - INTERIOR FIT-OUTHEPBURN - FLOORS 8 TO 11 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 8 TO 11 — Open
Aug 28, 2026 900 Bay St Building Permit Related(MS) HVAC - INTERIOR FIT-OUTHEARST - FLOORS 3 TO 7 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 — Open
Aug 27, 2026 900 Bay St Interior Alterations INTERIOR FIT-OUTHEPBURN - FLOORS 8 TO 11 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 8 TO 11 $21.6M Open
Aug 27, 2026 900 Bay St Interior Alterations INTERIOR FIT-OUTHEARST - FLOORS 3 TO 7 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 $21.4M Open
Aug 27, 2026 900 Bay St Interior Alterations INTERIOR FIT-OUTHEARST - FLOORS 8 TO 10 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 8 TO 10 $11.5M Open
Aug 6, 2026 900 Bay St Building Permit Related(PS) Plumbing Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 3-8.--------------------------------------------------------Plumbing - Proposal for interior alteration on floor 3-7 of Ferguson Tower — Open
Aug 6, 2026 900 Bay St Building Permit Related(MS) HVAC Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 3-8.---------------------------------------------------------------HVAC - Proposal for interior alteration on floor 3-7 of Ferguson Tower — Open
Aug 6, 2026 900 Bay St Building Permit Related(MS) Revision 01: Permit revision to 25 -238578 BLD and HVACHVAC - Proposed interior alterations for interior fit-out for following areas:- Podium - ground floor (between grids 34 to 42 & N TO V) and 2nd floor (between grids 48 to 64 & AA TO DD) and ground floor touchdown space. — Open
Aug 5, 2026 900 Bay St Building Permit Related(MS) HVAC Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 9-13.-----------------------------------------------------------HVAC - Proposal for interior alteration on floor 8-13 of Ferguson Tower — Open
Aug 5, 2026 900 Bay St Building Permit Related(PS) Plumbing Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 9-13.-----------------------------------------------------------Plumbing - Proposal for interior alteration on floor 8-13 of Ferguson Tower — Open
Jun 16, 2026 25 Grosvenor St Building Permit Related(MS) HVAC - The scope comprises early works required to physically and operationally separate shared building systems at 25 Grosvenor from 27 Grosvenor which will be the site of the future 27 Grosvenor St and 26 Grenville St redevelopment, See accompanying alterations permit for 27 Grosvenor St. — Open

The 40 most recent of 800 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
800
Data through
2026-10-30
Refresh
Daily from the City
Sheet
PST-551