thepermitmap

Postal area · 98 of 98 by permit count

Building permits in M7A

The City of Toronto has 794 building permits on record for the M7A postal area, going back to 1995. Declared construction value totals $1.2B. The most recent permit was applied for Sep 10, 2026 at 111 Wellesley St W.

Permits on record
7941995–2026
Declared construction value
$1.2Bas filed, not adjusted
Homes created
0dwelling units
Homes removed
0net +0

Permits issued per year

20002026 (part year)

Most common work

  • Interior Alterations257 · 32%
  • Building Permit Related(MS)241 · 30%
  • Building Permit Related(PS)86 · 11%
  • Electromagnetic Locks66 · 8%
  • Alternative Solution24 · 3%
  • Unknown21 · 3%
  • Other(BA)18 · 2%
  • Sprinklers9 · 1%
  • Interior Demolition5 · 1%
  • Garage Repair/Reconstruction5 · 1%
  • Backflow Prevention Devices (Water only)5 · 1%
  • Other(FS)4 · 1%

Structures worked on

  • Office654 · 82%
  • Multiple Use/Non Residential44 · 6%
  • Unspecified24 · 3%
  • Unknown21 · 3%
  • Other17 · 2%
  • Multiple Unit Building14 · 2%
  • First Party3 · 0%
  • Restaurant 30 Seats or Less3 · 0%
  • Child Care Facility/DayCare Centre3 · 0%
  • Transit Station,Subway, Bus Terminal2 · 0%
  • Parking Garage2 · 0%
  • Storage Room1 · 0%

Most recent permits

Issued Address Work What was filed Value Status
Sep 10, 2026 111 Wellesley St W Other(TS) Demountable stage for entertainers for performing on for event Open
Sep 9, 2026 15 Grosvenor St Building Permit Related(MS) HVAC - Proposal to demolish the existing conference room and expand the mailroom to provide additional workspace. Open
Sep 9, 2026 900 Bay St Interior Alterations Revision 01: Permit revision to 25 -238578 BLD and HVACProposed interior alterations for interior fit-out for following areas:- Podium - ground floor (between grids 34 to 42 & N TO V) and 2nd floor (between grids 48 to 64 & AA TO DD) and ground floor touchdown space.FSU permit see #25 241497 FSU 00 Open
Sep 1, 2026 15 Grosvenor St Interior Alterations Proposal to demolish the existing conference room and expand the mailroom to provide additional workspace. $67K Open
Aug 31, 2026 900 Bay St Interior Alterations REVISION - as per the attached cover letterProposed Interior Fit-out to existing floors 17 to 24 (inclusive). Open
Aug 31, 2026 900 Bay St Building Permit Related(MS) REVISION - as per the attached cover letterHVAC - Proposed Interior Fit-out to existing floors 17 to 24 (inclusive). Open
Aug 31, 2026 900 Bay St Building Permit Related(PS) REVISION - as per the attached cover letterPlumbing - Proposed Interior Fit-out to existing floors 17 to 24 (inclusive). Open
Aug 28, 2026 900 Bay St Building Permit Related(PS) Plumbing - INTERIOR FIT-OUTHEARST - FLOORS 3 TO 7 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 Open
Aug 28, 2026 900 Bay St Building Permit Related(MS) HVAC - INTERIOR FIT-OUTHEARST - FLOORS 8 TO 10 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 8 TO 10 Open
Aug 28, 2026 900 Bay St Building Permit Related(PS) Plumbing - INTERIOR FIT-OUTHEARST - FLOORS 8 TO 10 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 8 TO 10 Open
Aug 28, 2026 900 Bay St Interior Alterations Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 3-8.--------------------------------------------------------Proposal for interior alteration on floor 3-7 of Ferguson Tower Open
Aug 28, 2026 900 Bay St Building Permit Related(PS) Plumbing - INTERIOR FIT-OUTHEPBURN - FLOORS 8 TO 11 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 8 TO 11 Open
Aug 28, 2026 900 Bay St Building Permit Related(MS) HVAC - INTERIOR FIT-OUTHEPBURN - FLOORS 8 TO 11 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 8 TO 11 Open
Aug 28, 2026 900 Bay St Building Permit Related(MS) HVAC - INTERIOR FIT-OUTHEARST - FLOORS 3 TO 7 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 Open
Aug 27, 2026 900 Bay St Interior Alterations INTERIOR FIT-OUTHEPBURN - FLOORS 8 TO 11 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 8 TO 11 $21.6M Open
Aug 27, 2026 900 Bay St Interior Alterations INTERIOR FIT-OUTHEARST - FLOORS 3 TO 7 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 $21.4M Open
Aug 27, 2026 900 Bay St Interior Alterations INTERIOR FIT-OUTHEARST - FLOORS 8 TO 10 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 8 TO 10 $11.5M Open
Aug 18, 2026 900 Bay St Building Permit Related(PS) Revision 01 - Revision to project scope and construction phasing, including removal of Mowat Tower Levels 15 and 16 from the permit and addition of elevator lobby finish work for Levels 3 through 14Plumbing - Proposed Interior Fit-out to existing floors 3 to 16 (inclusive). Open
Aug 18, 2026 900 Bay St Interior Alterations Revision 01 - Revision to project scope and construction phasing, including removal of Mowat Tower Levels 15 and 16 from the permit and addition of elevator lobby finish work for Levels 3 through 14Proposed Interior Fit-out to existing floors 3 to 16 (inclusive). Open
Aug 18, 2026 900 Bay St Building Permit Related(MS) Revision 01 - Revision to project scope and construction phasing, including removal of Mowat Tower Levels 15 and 16 from the permit and addition of elevator lobby finish work for Levels 3 through 14HVAC - Proposed Interior Fit-out to existing floors 3 to 16 (inclusive). Open
Aug 6, 2026 900 Bay St Building Permit Related(PS) Plumbing Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 3-8.--------------------------------------------------------Plumbing - Proposal for interior alteration on floor 3-7 of Ferguson Tower Open
Aug 6, 2026 900 Bay St Building Permit Related(MS) HVAC Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 3-8.---------------------------------------------------------------HVAC - Proposal for interior alteration on floor 3-7 of Ferguson Tower Open
Aug 6, 2026 900 Bay St Building Permit Related(MS) Revision 01: Permit revision to 25 -238578 BLD and HVACHVAC - Proposed interior alterations for interior fit-out for following areas:- Podium - ground floor (between grids 34 to 42 & N TO V) and 2nd floor (between grids 48 to 64 & AA TO DD) and ground floor touchdown space. Open
Aug 5, 2026 900 Bay St Building Permit Related(MS) HVAC Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 9-13.-----------------------------------------------------------HVAC - Proposal for interior alteration on floor 8-13 of Ferguson Tower Open
Aug 5, 2026 900 Bay St Building Permit Related(PS) Plumbing Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 9-13.-----------------------------------------------------------Plumbing - Proposal for interior alteration on floor 8-13 of Ferguson Tower Open
Jul 20, 2026 900 Bay St Building Permit Related(MS) HVAC - INTERIOR FIT-OUTHEPBURN - FLOORS 3 TO 7 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 Open
Jul 20, 2026 900 Bay St Interior Alterations INTERIOR FIT-OUTHEPBURN - FLOORS 3 TO 7 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 $28.6M Open
Jul 20, 2026 900 Bay St Building Permit Related(PS) Plumbing - INTERIOR FIT-OUTHEPBURN - FLOORS 3 TO 7 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 Open
Jul 13, 2026 900 Bay St Building Permit Related(MS) HVAC - Proposed interior alterations - interior fit-out for following areas; Ground Floor 900 bay lobby (addition of 2 Security Desks, Secured Glazing and Turnstiles), 2nd floor Hearst lobby (to add relocated Conference Reception Desk), Basement 2 (addition of Pallet scanner and Parcel scanner area) Open
Jul 13, 2026 900 Bay St Interior Alterations Proposed interior alterations - interior fit-out for following areas; Ground Floor 900 bay lobby (addition of 2 Security Desks, Secured Glazing and Turnstiles), 2nd floor Hearst lobby (to add relocated Conference Reception Desk), Basement 2 (addition of Pallet scanner and Parcel scanner area), and B $6.2M Open
Jun 23, 2026 900 Bay St Other(BA) Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 9-13.-----------------------------------------------------------Proposal for interior alteration on floor 8-13 of Ferguson Tower Open
Jun 16, 2026 25 Grosvenor St Building Permit Related(MS) HVAC - The scope comprises early works required to physically and operationally separate shared building systems at 25 Grosvenor from 27 Grosvenor which will be the site of the future 27 Grosvenor St and 26 Grenville St redevelopment, See accompanying alterations permit for 27 Grosvenor St. Open
Jun 16, 2026 25 Grosvenor St Building Permit Related(PS) Plumbing - The scope comprises early works required to physically and operationally separate shared building systems at 25 Grosvenor from 27 Grosvenor which will be the site of the future 27 Grosvenor St and 26 Grenville St redevelopment, See accompanying alterations permit for 27 Grosvenor St. Open
Jun 16, 2026 25 Grosvenor St Interior Alterations The scope comprises early works required to physically and operationally separate shared building systems at 25 Grosvenor from 27 Grosvenor which will be the site of the future 27 Grosvenor St and 26 Grenville St redevelopment, See accompanying alterations permit for 27 Grosvenor St. $4.8M Open
Apr 7, 2026 900 Bay St Sprinklers Proposal for sprinkler. $200K Open
Mar 5, 2026 900 Bay St Sprinklers Proposal for sprinkler. $200K Open
Jan 22, 2026 900 Bay St Interior Alterations Rev 18 - Revision to Mowat tower Fire Separation at Elevator Lobby - Typical floor(s) from not being rated to a 0hr rating as indicated/ bubbled. Level 3 to 24. See also attached code report for rational. Revision 17: Revision to current permit - see code report and cover letter for details Closed
Jan 9, 2026 99 Wellesley St W Interior Alterations Proposal for interior alterations to office space - Room B528R $50K Open
Jan 9, 2026 99 Wellesley St W Building Permit Related(PS) Plumbing - Proposal for interior alterations to office space - Room B528R Open
Jan 9, 2026 99 Wellesley St W Building Permit Related(MS) HVAC - Proposal for interior alterations to office space - Room B528R Open

The 40 most recent of 794 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
794
City refresh
2026-09-12 10:24
Page built
2026-09-12
Sheet
PST-551