Postal area · 98 of 98 by permit count
Building permits in M7A
The City of Toronto has 800 building permits on record for the M7A postal area, going back to 1995. Declared construction value totals $1.2B. Half of the 753 permits issued here came through within 15 days of the application. The most recent permit was issued Oct 30, 2026 at 900 Bay St.
- Permits on record
- 8001995–2026
- Declared construction value
- $1.2Bas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 15 days12 days faster than the city
Permits issued per year
Zoning
- Most common zone
- CR100.0% of permits · by-law 40.10
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 178of 800 on record
The zoning categories the permits in M7A fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Oct 30, 2026 | 900 Bay St | Interior Alterations | Revision 01 - Revision to project scope and construction phasing, including removal of Mowat Tower Levels 15 and 16 from the permit and addition of elevator lobby finish work for Levels 3 through 14Proposed Interior Fit-out to existing floors 3 to 16 (inclusive). | — | Open |
| Oct 29, 2026 | 900 Bay St | Sprinklers | REV: Proposal for sprinkler. | — | Open |
| Oct 23, 2026 | 900 Bay St | Building Permit Related(MS) | HVAC - INTERIOR FIT-OUTHEPBURN - FLOORS 3 TO 7 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 | — | Open |
| Oct 23, 2026 | 900 Bay St | Interior Alterations | INTERIOR FIT-OUTHEPBURN - FLOORS 3 TO 7 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 | $28.6M | Open |
| Oct 23, 2026 | 900 Bay St | Building Permit Related(PS) | Plumbing - INTERIOR FIT-OUTHEPBURN - FLOORS 3 TO 7 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 | — | Open |
| Oct 22, 2026 | 900 Bay St | Sprinklers | Rev 01 - Proposed alterations to sprinkler system leve 3-14Proposal for sprinkler. | — | Open |
| Oct 21, 2026 | 900 Bay St | Sprinklers | Proposal for sprinklers for Hepburn Tower Level 3-7. | $200K | Open |
| Oct 21, 2026 | 900 Bay St | Sprinklers | Proposal for sprinklers for Hearst Tower Level 8-11. | $200K | Open |
| Oct 21, 2026 | 900 Bay St | Sprinklers | Proposal for sprinklers for Hearst Tower Level 8-10. | $200K | Open |
| Oct 21, 2026 | 900 Bay St | Sprinklers | Proposal for sprinklers for Hearst Tower Level 3-7. | $200K | Open |
| Oct 14, 2026 | 900 Bay St | Building Permit Related(MS) | HVAC - Proposed interior alterations - interior fit-out for following areas; Ground Floor 900 bay lobby (addition of 2 Security Desks, Secured Glazing and Turnstiles), 2nd floor Hearst lobby (to add relocated Conference Reception Desk), Basement 2 (addition of Pallet scanner and Parcel scanner area) | — | Open |
| Oct 14, 2026 | 900 Bay St | Interior Alterations | Proposed interior alterations - interior fit-out for following areas; Ground Floor 900 bay lobby (addition of 2 Security Desks, Secured Glazing and Turnstiles), 2nd floor Hearst lobby (to add relocated Conference Reception Desk), Basement 2 (addition of Pallet scanner and Parcel scanner area), and B | $6.2M | Open |
| Sep 29, 2026 | 900 Bay St | Alternative Solution | Proposal for evaluation of alternative solutions | — | Closed |
| Sep 24, 2026 | 900 Bay St | Other(BA) | Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 9-13.-----------------------------------------------------------Proposal for interior alteration on floor 8-13 of Ferguson Tower | — | Open |
| Sep 17, 2026 | 900 Bay St | Electromagnetic Locks | Proposal for maglock installation: six maglocks for Levels 3-8 and six maglocks for Levels 9-15 (Ferguson Tower) | $50K | Open |
| Sep 11, 2026 | 900 Bay St | Building Permit Related(PS) | Revision 01 - Revision to project scope and construction phasing, including removal of Mowat Tower Levels 15 and 16 from the permit and addition of elevator lobby finish work for Levels 3 through 14Plumbing - Proposed Interior Fit-out to existing floors 3 to 16 (inclusive). | — | Open |
| Sep 11, 2026 | 900 Bay St | Building Permit Related(MS) | Revision 01 - Revision to project scope and construction phasing, including removal of Mowat Tower Levels 15 and 16 from the permit and addition of elevator lobby finish work for Levels 3 through 14HVAC - Proposed Interior Fit-out to existing floors 3 to 16 (inclusive). | — | Open |
| Sep 10, 2026 | 111 Wellesley St W | Other(TS) | Demountable stage for entertainers for performing on for event | — | Closed |
| Sep 9, 2026 | 15 Grosvenor St | Building Permit Related(MS) | HVAC - Proposal to demolish the existing conference room and expand the mailroom to provide additional workspace. | — | Open |
| Sep 9, 2026 | 900 Bay St | Interior Alterations | Revision 01: Permit revision to 25 -238578 BLD and HVACProposed interior alterations for interior fit-out for following areas:- Podium - ground floor (between grids 34 to 42 & N TO V) and 2nd floor (between grids 48 to 64 & AA TO DD) and ground floor touchdown space.FSU permit see #25 241497 FSU 00 | — | Open |
| Sep 1, 2026 | 15 Grosvenor St | Interior Alterations | Proposal to demolish the existing conference room and expand the mailroom to provide additional workspace. | $67K | Open |
| Aug 31, 2026 | 900 Bay St | Interior Alterations | REVISION - as per the attached cover letterProposed Interior Fit-out to existing floors 17 to 24 (inclusive). | — | Open |
| Aug 31, 2026 | 900 Bay St | Building Permit Related(MS) | REVISION - as per the attached cover letterHVAC - Proposed Interior Fit-out to existing floors 17 to 24 (inclusive). | — | Open |
| Aug 31, 2026 | 900 Bay St | Building Permit Related(PS) | REVISION - as per the attached cover letterPlumbing - Proposed Interior Fit-out to existing floors 17 to 24 (inclusive). | — | Open |
| Aug 28, 2026 | 900 Bay St | Building Permit Related(MS) | HVAC - INTERIOR FIT-OUTHEARST - FLOORS 8 TO 10 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 8 TO 10 | — | Open |
| Aug 28, 2026 | 900 Bay St | Building Permit Related(PS) | Plumbing - INTERIOR FIT-OUTHEARST - FLOORS 3 TO 7 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 | — | Open |
| Aug 28, 2026 | 900 Bay St | Building Permit Related(PS) | Plumbing - INTERIOR FIT-OUTHEARST - FLOORS 8 TO 10 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 8 TO 10 | — | Open |
| Aug 28, 2026 | 900 Bay St | Interior Alterations | Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 3-8.--------------------------------------------------------Proposal for interior alteration on floor 3-7 of Ferguson Tower | — | Open |
| Aug 28, 2026 | 900 Bay St | Building Permit Related(PS) | Plumbing - INTERIOR FIT-OUTHEPBURN - FLOORS 8 TO 11 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 8 TO 11 | — | Open |
| Aug 28, 2026 | 900 Bay St | Building Permit Related(MS) | HVAC - INTERIOR FIT-OUTHEPBURN - FLOORS 8 TO 11 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 8 TO 11 | — | Open |
| Aug 28, 2026 | 900 Bay St | Building Permit Related(MS) | HVAC - INTERIOR FIT-OUTHEARST - FLOORS 3 TO 7 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 | — | Open |
| Aug 27, 2026 | 900 Bay St | Interior Alterations | INTERIOR FIT-OUTHEPBURN - FLOORS 8 TO 11 (inclusive)HEPBURN ELEVATOR LOBBY FINISH - FLOORS 8 TO 11 | $21.6M | Open |
| Aug 27, 2026 | 900 Bay St | Interior Alterations | INTERIOR FIT-OUTHEARST - FLOORS 3 TO 7 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 3 TO 7 | $21.4M | Open |
| Aug 27, 2026 | 900 Bay St | Interior Alterations | INTERIOR FIT-OUTHEARST - FLOORS 8 TO 10 (inclusive)HEARST ELEVATOR LOBBY FINISH - FLOORS 8 TO 10 | $11.5M | Open |
| Aug 6, 2026 | 900 Bay St | Building Permit Related(PS) | Plumbing Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 3-8.--------------------------------------------------------Plumbing - Proposal for interior alteration on floor 3-7 of Ferguson Tower | — | Open |
| Aug 6, 2026 | 900 Bay St | Building Permit Related(MS) | HVAC Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 3-8.---------------------------------------------------------------HVAC - Proposal for interior alteration on floor 3-7 of Ferguson Tower | — | Open |
| Aug 6, 2026 | 900 Bay St | Building Permit Related(MS) | Revision 01: Permit revision to 25 -238578 BLD and HVACHVAC - Proposed interior alterations for interior fit-out for following areas:- Podium - ground floor (between grids 34 to 42 & N TO V) and 2nd floor (between grids 48 to 64 & AA TO DD) and ground floor touchdown space. | — | Open |
| Aug 5, 2026 | 900 Bay St | Building Permit Related(MS) | HVAC Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 9-13.-----------------------------------------------------------HVAC - Proposal for interior alteration on floor 8-13 of Ferguson Tower | — | Open |
| Aug 5, 2026 | 900 Bay St | Building Permit Related(PS) | Plumbing Revision 01 - Revisions to elevator lobby finish and interior fit-out to floors 9-13.-----------------------------------------------------------Plumbing - Proposal for interior alteration on floor 8-13 of Ferguson Tower | — | Open |
| Jun 16, 2026 | 25 Grosvenor St | Building Permit Related(MS) | HVAC - The scope comprises early works required to physically and operationally separate shared building systems at 25 Grosvenor from 27 Grosvenor which will be the site of the future 27 Grosvenor St and 26 Grenville St redevelopment, See accompanying alterations permit for 27 Grosvenor St. | — | Open |
The 40 most recent of 800 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.