Type of work · 63 of 103 by permit count
Other(FS) permits in Toronto
The City of Toronto has 1,001 other(fs) permits on record for Toronto, going back to 2001. Declared construction value totals $63.4M. Half of the 956 permits issued here came through within 27 days of the application. The most recent permit was issued Oct 29, 2026 at 120 St George St.
- Permits on record
- 1,0012001–2026
- Declared construction value
- $63.4Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 27 dayscity median
Permits issued per year
Zoning
- Most common zone
- CR38.1% of permits · by-law 40.10
- In detached-house zones
- 5.5%32.5% below the city’s 38.0%
- Permits with a zone
- 622of 1,001 on record
The zoning categories the permits in Other(FS) fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Oct 29, 2026 | 120 St George St | Other(FS) | Proposal for existing fire-pump replacement | $207K | Open |
| Oct 29, 2026 | 790 Bay St | Other(FS) | New water service and fire service to existing medical building, addition of back flow preventer on fire protection service. -Standpipe/sprinkler | $500K | Open |
| Oct 29, 2026 | 95 Wellington St W | Other(FS) | 17th Floor: -Remove temporary upright sprinklers.-Relocate up to two (2) fire hose cabinets. -Supply and install up to one (1) fire hose cabinet, c/w SV. Wiring and programming by others.-Supply and install up to one hundred fifty-seven (157) white concealed pendent sprinklers.-Supply and install up | $205K | Open |
| Oct 29, 2026 | 130 St George St | Other(FS) | Proposal for existing fire-pump replacement, replacement of all existing hose valves in every existing fire hose cabinet. | $335K | Open |
| Oct 29, 2026 | 140 St George St | Other(FS) | Proposal to replace existing fire pump | $232K | Open |
| Oct 28, 2026 | 2671 Islington Ave | Other(FS) | Installing backflow on sprinkler line, and installing sprinkler on the mechanical, 3rd, 2nd, and ground floors. | $250K | Open |
| Oct 27, 2026 | 790 Bay St | Other(FS) | Fire alarm system replacement | $200K | Open |
| Oct 22, 2026 | 674 Dundas St W | Other(FS) | REVISION - revised sprinklersProposal to replace the sprinkler alarm valve, install new backflow on sprinkler line, replace underground fire standpipe line, replace fire pump | — | Open |
| Oct 22, 2026 | 30 Adelaide St E | Other(FS) | Installation of fire shutter window with fire alarm system interfacing. | $1.0M | Open |
| Oct 21, 2026 | 3379 Lawrence Ave E | Other(FS) | Proposed like-for-like fire pump replacement due to end of service life. | $60K | Open |
| Oct 19, 2026 | 25 Mutual St | Other(FS) | Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for replacement of existing electric fire pump and associated piping in fire pump room | — | Open |
| Oct 16, 2026 | 20 York Mills Rd | Other(FS) | Proposal for fire pump replacement project. | $10K | Open |
| Oct 14, 2026 | 100 Bloor St W | Other(FS) | Proposal to remove existing sprinklers as required, supply and install up to sixteen (16) new upright sprinklers, supply and install up to one hundred and eight (108) new concealed sprinklers c/w white cover plates, and supply and install up to three new 10lbs ABC rated standard dry chemical fire ex | $53K | Open |
| Oct 9, 2026 | 31 Drummond St | Other(FS) | Proposal to add backflow preventor to existing sprinkler system. | $10K | Open |
| Oct 9, 2026 | 170 College St | Other(FS) | Proposal to replace existing fire-pump. | $427K | Open |
| Oct 9, 2026 | 251 College St | Other(FS) | Proposal for sprinkler modification and fire alarm audible device relocation in the fitness room. | $11K | Open |
| Oct 7, 2026 | 400 McLevin Ave | Other(FS) | Relocation of Fire Department Connection (FDC) | $10K | Open |
| Oct 7, 2026 | 350 Evans Ave | Other(FS) | Proposal for fire protection upgrades within an existing industrial building occupied by four tenants, including modifications to the sprinkler system and fire hose rack layout. No change of major occupancy or expansion of the existing building is proposed. | $50K | Open |
| Oct 6, 2026 | 65 Dundas St E | Other(FS) | Proposed project consists of security system upgrades including CCTV coverage throughout both exit stairwells and around the building perimeter, along with access control upgrades at stairwell and crossover floor doors. | $200K | Open |
| Oct 5, 2026 | 78 Tapscott Rd | Other(FS) | Renovation of fire alarm system to existing builidngs, sprinkler life safety (existing and emergency light) to follow latest codes. | $150K | Open |
| Sep 2, 2026 | 6351 Steeles Ave E | Other(FS) | Proposal for relocation and addition of beam detectors in space where new MHE (new convetors) has caused interference | $500K | Open |
| Aug 27, 2026 | 120 Rosedale Valley Rd | Other(FS) | Proposal for Fire Protection modifications. | $94K | Open |
| Aug 14, 2026 | 65 Greenbrae Crct | Other(FS) | Replacement of existing sprinkler system and installation of new double check detector assemblybackflow preventer. | $350K | Open |
| Aug 6, 2026 | 600 Rogers Rd | Other(FS) | Proposal for fire pump replacement | $241K | Open |
| Jul 30, 2026 | 55 University Ave | Other(FS) | Proposal to replace existing smoke dampers. | $200K | Open |
| Jul 28, 2026 | 715 Milner Ave | Other(FS) | Proposal to rework existing wet sprinkler system in scope of work area, supply & installation of pre-action system and supply & installation of clean agent in Data centre. | — | Open |
| Jul 24, 2026 | 45 Commander Blvd | Other(FS) | Sprinkler backflow preventer installation | $6K | Open |
| Jul 22, 2026 | 5600 Sheppard Ave E | Other(FS) | Standpipe Booster Pump Replacement | $3K | Open |
| Jul 10, 2026 | 10 Boultbee Ave | Other(FS) | Proposal to replace existing fire pump in sprinkler room. | $325K | Open |
| Jul 3, 2026 | 40 Stevenson Rd | Other(FS) | Proposal to replace fire pump | $40K | Open |
| Jun 29, 2026 | 265 Main St | Other(FS) | REV01: Proposed revision change to the fire pump motor horsepowerProposal for a standpipe booster pump replacement | — | Open |
| Jun 25, 2026 | 45 Manitoba Dr | Other(FS) | Proposed lighting upgrade, revisions to existing arena bowl lighting and lighting controls (including fire alarm tie-in). No changes to other systems (partitions, ceilings, HVAC, etc.). | $600K | Open |
| Jun 23, 2026 | 675 Kennedy Rd | Other(FS) | Proposal for Fire Pump and controller Replacement. Installation of a new backflow preventer. | $10K | Open |
| Jun 22, 2026 | 100 High Park Ave | Other(FS) | Proposal to replace existing fire pump. | — | Open |
| Jun 18, 2026 | 43 Acheson Blvd | Other(FS) | Replace Adenco signal panel with new Mircom monitor panel | $1K | Open |
| Jun 12, 2026 | 15 Choiceland Blvd | Other(FS) | Replace Adenco signal panel with new Mircom monitor panel | $1K | Open |
| Jun 10, 2026 | 969 Eastern Ave | Other(FS) | Replacement of existing Fire Department Connection with new freestanding FDC | $1K | Open |
| Jun 5, 2026 | 3471 McNicoll Ave | Other(FS) | Proposal to replace existing 8" Muller #H-9505, check valve assembly with new 8" Zurn 350 ADA. | $16K | Open |
| Jun 1, 2026 | 2575 Danforth Ave | Other(FS) | REVISION - change to the fire pump motor horsepowerProposal for a standpipe booster pump replacement | — | Open |
| Jun 1, 2026 | 790 Bay St | Other(FS) | Replacement and relocation of the fire pump test header. | $15K | Open |
The 40 most recent of 1,001 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.