Structure · 85 of 153 by permit count
Apartment Hotel building permits in Toronto
The City of Toronto has 229 building permits on apartment hotel structures on record for Toronto, going back to 1999. Those permits created 30 homes and removed 0, a net change of +30. Declared construction value totals $56.4M. The most recent permit was issued Jul 20, 2026 at 255 Village Green Sq.
- Permits on record
- 2291999–2026
- Declared construction value
- $56.4Mas filed, not adjusted
- Homes created
- 30dwelling units
- Homes removed
- 0net +30
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Jul 20, 2026 | 255 Village Green Sq | Other(BA) | Driveway repairs, repair/replace drainage system and reinstate driveway pavers. | $165K | Open |
| Jul 16, 2026 | 333 Sidney Belsey Cres | Building Permit Related(MS) | HVAC - Proposal to convert mixed use room to 2 residential units (1 bedroom and 2 bedroom) | — | Open |
| Jul 16, 2026 | 333 Sidney Belsey Cres | Multiple Projects | Proposal to convert mixed use room to 2 residential units (1 bedroom and 2 bedroom) | $150K | Open |
| Jul 16, 2026 | 333 Sidney Belsey Cres | Building Permit Related(PS) | Plumbing - Proposal to convert mixed use room to 2 residential units (1 bedroom and 2 bedroom) | — | Open |
| Jun 11, 2026 | 60 York St | Sprinklers | Rev 02: Revised layoutRev 01: (Pending application form for scopeInstallation of new sprinkler systems | — | Open |
| Feb 3, 2026 | 30 Carlton St | Building Permit Related(MS) | HVAC - Proposal for interior alterations to the gym on the 5th floor. | — | Closed |
| Dec 12, 2025 | 9 Roanoke Rd | Building Permit Related(MS) | HVAC - Replace end-of-life make-up air unit with new unit including energy recovery ventilator to recover exhaust heat and preheat corridor supply air; Install air-source heat pump to supply portion of domestic hot water load, reducing natural gas consumption from boilers, Replace parking garage hea | — | Open |
| Dec 10, 2025 | 9 Roanoke Rd | Other(BA) | Replace end-of-life make-up air unit with new unit including energy recovery ventilator to recover exhaust heat and preheat corridor supply air; Install air-source heat pump to supply portion of domestic hot water load, reducing natural gas consumption from boilers, Replace parking garage heater the | $698K | Open |
| Oct 10, 2025 | 10 Parkway Forest Dr | Fixtures/Roof Drains: Other | Proposal for the addition of laundry washer to an existing drain in a residential unit - UNIT 1505 | $1K | Closed |
| Aug 8, 2025 | 30 Carlton St | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to the gym on the 5th floor. | — | Closed |
| Aug 8, 2025 | 30 Carlton St | Interior Alterations | Proposal for interior alterations to the gym on the 5th floor. | $300K | Closed |
| Jul 7, 2025 | 361 The West Mall | Garage Repair/Reconstruction | Proposal for slab replacement. | $5.0M | Open |
| Jul 7, 2025 | 556 Sherbourne St | Interior Alterations | Proposal to remove partition wall between suites 703 & 704 only. No other changes. | $1K | Open |
| Apr 30, 2025 | 1275 Finch Ave W | Building Permit Related(MS) | HVAC - PROPOSED INTERIOR ALTERATIONS TO LISTED UNITS. CONVERSION OF OFFICE SPACE(S) TO HOTEL SUITES. | — | Open |
| Apr 30, 2025 | 1275 Finch Ave W | Building Permit Related(PS) | Plumbing - PROPOSED INTERIOR ALTERATIONS TO LISTED UNITS. CONVERSION OF OFFICE SPACE(S) TO HOTEL SUITES. | — | Open |
| Apr 30, 2025 | 1275 Finch Ave W | Interior Alterations | PROPOSED INTERIOR ALTERATIONS TO LISTED UNITS. CONVERSION OF OFFICE SPACE(S) TO HOTEL SUITES. | $450K | Open |
| Mar 20, 2025 | 8 Lomond Dr | Other(MS) | Replacement of existing in-suite fan coil units with new fan coil units. Replacement of pipe headers and risers serving fan coil units. | $5.4M | Open |
| Mar 19, 2025 | 1275 Finch Ave W | Building Permit Related(PS) | Plumbing - Proposal to perform interior alterations to various uints and convert offices to suites. | — | Closed |
| Mar 19, 2025 | 1275 Finch Ave W | Building Permit Related(MS) | HVAC - Proposal to perform interior alterations to various uints and convert offices to suites. | — | Closed |
| Mar 19, 2025 | 1275 Finch Ave W | Interior Alterations | Proposal to perform interior alterations to various uints and convert offices to suites. | $10K | Closed |
| Dec 10, 2024 | 183 Wellington St W | Electromagnetic Locks | Proposal for a maglock on the front residential entrance. | $10K | Open |
| Dec 6, 2024 | 71 Simcoe St | Garage Repair/Reconstruction | Proposed localized concrete and waterproofing repairs to the suspended slabs | $565K | Closed |
| Aug 22, 2024 | 55 Harbour Sq | Garage Repair/Reconstruction | Localized suspended structural slab (garage) concrete repairs and full waterproofing renewal for P1A, P1B, P2, P3, AND P4 Levels. | $453K | Closed |
| Jul 29, 2024 | 7 Jackes Ave | Building Permit Related(PS) | Plumbing - Proposal for interior alteration of suite #1601 | — | Closed |
| Jul 29, 2024 | 7 Jackes Ave | Building Permit Related(MS) | HVAC - Proposal for interior alteration of suite #1601 | — | Closed |
| Jul 25, 2024 | 7 Jackes Ave | Interior Alterations | Proposal for interior alteration of suite #1601 | $25K | Closed |
| Apr 23, 2024 | 30 Falstaff Ave | Balcony/Guard Repairs | Isolated repairs to the fire damaged balcony structure and replacement of existing damaged railing with new - unit 1504 | $25K | Closed |
| Apr 8, 2024 | 111 Lombard St | Garage Repair/Reconstruction | Proposal for garage roof slab Expansion Joint Replacement and Localized Concrete Repairs. | $220K | Closed |
| Apr 3, 2024 | 30 Carlton St | Building Permit Related(PS) | Plumbing - 1-INTERIOR RENO TO MAIN FLOOR TO ADD A COFFEE KIOSH2-PLUMBING-ADD 4 FIXTURES | — | Closed |
| Apr 3, 2024 | 30 Carlton St | Interior Alterations | 1-INTERIOR RENO TO MAIN FLOOR TO ADD A COFFEE KIOSH2-PLUMBING-ADD 4 FIXTURES | $25K | Closed |
| Mar 11, 2024 | 8 Gloucester St | Electromagnetic Locks | REV 01Electronic Maglock Installation | — | Closed |
| Jan 9, 2024 | 181 Wellington St W | Interior Alterations | Replacing plumbing fixtures with new (existing rough in remains). New millwork, new hardwood flooring and demolition of one partition wall. | $250K | Closed |
| Nov 14, 2023 | 201 Van Horne Ave | Balcony/Guard Repairs | Proposed balcony panel and railing replacement. | $700K | Closed |
| Nov 3, 2023 | 123 Queen St W | Other(MS) | Proposal to supply and install new VRF condenser unit, three new ceiling-mounted indoor cassette units, new 10-ton rooftop unit, new general exhaust fan, and new 2" condensate drain line. Supply and install new ductwork and diffusers. Interface equipment to BAS. Disconnect and remove existing electr | $205K | Closed |
| Aug 16, 2023 | 18 Parkview Ave | Sprinklers | Fire/Security Upgrade, Sprinkler System installation | $25K | Open |
| Nov 15, 2022 | 15 Mercer St | Building Permit Related(MS) | HVAC - Proposal for Interior fit-out for Hotel. "Nobu Hotel" | — | Open |
| Nov 15, 2022 | 15 Mercer St | Building Permit Related(PS) | Plumbing - Proposal for Interior fit-out for Hotel. "Nobu Hotel" | — | Open |
| Nov 15, 2022 | 15 Mercer St | Interior Alterations | Proposal for Interior fit-out for Hotel. "Nobu Hotel" | $10.0M | Open |
| Sep 13, 2022 | 3 Everson Dr | Other(PS) | Replacement of in-suite kitech domestic water piping for stacked townhouses | $4K | Closed |
| Jun 27, 2022 | 30 Wellington St E | Interior Alterations | Construct structural support for new generator on rooftop | $1.5M | Open |
The 40 most recent of 229 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.