Street · 121 of 8,565 by permit count
Building permits on Yorkville Ave
The City of Toronto has 957 building permits on record for Yorkville Ave, going back to 1993. Those permits created 1,188 homes and removed 80, a net change of +1,108. Declared construction value totals $502.6M. The most recent permit was applied for Sep 10, 2026 at 83 Yorkville Ave.
- Permits on record
- 9571993–2026
- Declared construction value
- $502.6Mas filed, not adjusted
- Homes created
- 1,188dwelling units
- Homes removed
- 80net +1,108
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 10, 2026 | Building Permit Related(MS) | HVAC - Interior renovations of an existing retail unit - "Dolce Vita" | — | Open |
| Sep 10, 2026 | Temporary Structures | Proposal to construct temporary demountable structure for TIFF. Installation date: Sep. 8, 2026Removal date: Sep. 20, 2026. | — | Open |
| Sep 10, 2026 | Building Permit Related(PS) | Plumbing - Interior renovations of an existing retail unit - "Dolce Vita" | — | Open |
| Sep 10, 2026 | Interior Alterations | Interior renovations of an existing retail unit - "Dolce Vita" | $300K | Open |
| Aug 28, 2026 | Interior Alterations | REVISION-01: DUE TO SITE CONDITIONS, CHANGE IN ROOM ALLOCATION, RELOCATION OF WASHROOM, REMOVAL OF ONE WASHROOM. MODIFICATIONS HIGHLIGHTED IN ARCHITECTURAL PLANFit out of a vacant unit into a medical office and clinic | — | Open |
| Aug 28, 2026 | Building Permit Related(MS) | REVISION-01HVAC - Fit out of a vacant unit into a medical office and clinic | — | Open |
| Aug 26, 2026 | Interior Alterations | Revision 01 - revisions to change-room area, ride studio, strength studio and tonic house.Proposal for Interior alterations fit-out for a commercial fitness centre - includes interior partitions, struct., hvac, plumbing work. | — | Open |
| Aug 26, 2026 | Building Permit Related(PS) | Revision 01 - revisions to change-room area, ride studio, strength studio and tonic house.Plumbing - Proposal for Interior alterations fit-out for fitness centre - includes interior partitions, struct., hvac, plumbing work. | — | Open |
| Aug 26, 2026 | Building Permit Related(MS) | Revision 01 - revisions to change-room area, ride studio, strength studio and tonic house.HVAC - Proposal for Interior alterations fit-out for fitness centre - includes interior partitions, struct., hvac, plumbing work. | — | Open |
| Aug 20, 2026 | Building Permit Related(PS) | Revision No.2: EXTERIOR TERRACE REVISIONS ONLYRevision to interior layout and additonal wall and ceiling details.Plumbing - Proposal for interior alterations to an existing residential suite - UNIT 3602 | — | Open |
| Aug 20, 2026 | Building Permit Related(MS) | Revision No.2: EXTERIOR TERRACE REVISIONS ONLYRevision to interior layout and additonal wall and ceiling details.HVAC - Proposal for interior alterations to an existing residential suite - UNIT 3602 | — | Open |
| Aug 14, 2026 | Interior Alterations | Interior alterations to an existing Group D (Business and Personal Services) office suite (Unit 200). Proposed work includes the reconfiguration of non-load-bearing interior partitions and the relocation of a private washroom to improve the functional layout of the 245.64 m² space. No change of use | $120K | Open |
| Jul 29, 2026 | Interior Alterations | Demolition of existing finishes and millwork. New work includes new millwork interior finishes, and minor alterations to partitions, lighting, sprinkler heads. | $500K | Open |
| Jul 27, 2026 | Interior Alterations | Revision 01: Revision to permit, refer to cover letterProposal for interior alteration of existing ground floor and second floor commercial space for a new restaurant. | — | Open |
| Jul 24, 2026 | Building Permit Related(PS) | Revision 01: Revision to permit, refer to cover letterPlumbing - Proposal for interior alteration of existing ground floor and second floor commercial space for a new restaurant. | — | Open |
| Jul 13, 2026 | Building Permit Related(PS) | Plumbing - Demolition of existing finishes and millwork. New work includes new millwork interior finishes, and minor alterations to partitions, lighting, sprinkler heads. | — | Open |
| Jul 13, 2026 | Building Permit Related(MS) | HVAC - Demolition of existing finishes and millwork. New work includes new millwork interior finishes, and minor alterations to partitions, lighting, sprinkler heads. | — | Open |
| Jul 8, 2026 | Building Permit Related(MS) | HVAC - Proposed interior alterations to existing gym/amenity area within residential apartment building including upgrading interior finishes, reconfiguring interior elements and improving functionality and appearance of space. Existing washroom area to be removed and gym area to be updated as part | — | Open |
| Jul 8, 2026 | Interior Alterations | Proposed interior alterations to existing gym/amenity area within residential apartment building including upgrading interior finishes, reconfiguring interior elements and improving functionality and appearance of space. Existing washroom area to be removed and gym area to be updated as part of over | $150K | Open |
| Jun 22, 2026 | Building Permit Related(MS) | Revision 01: Revision to permit, refer to cover letterHVAC - Proposal for interior alteration of existing ground floor and second floor commercial space for a new restaurant. | — | Open |
| Jun 22, 2026 | Building Permit Related(MS) | REV 01: propose removing TWO (2) skylights, taking the HVAC units from the roof and building and installing them into the ceiling of the balcony area.HVAC - Proposal to renovate existing open balcony to an enclosed space with walls and a roof. | — | Open |
| Jun 5, 2026 | Multiple Projects | REV 01: propose removing TWO (2) skylights, taking the HVAC units from the roof and building and installing them into the ceiling of the balcony area.Proposal to renovate existing open balcony to an enclosed space with walls and a roof. | — | Open |
| Apr 27, 2026 | Sign Building Permit Related | In Conjunction with SMP #24-118619 ZMP 00 ZR, to erect and display 5 first party signs on the first storey, all displaying static copy and illuminated with the following dimensions:Wall SignsSign 1(RM3) 0.43m L x 2.37m W x 0.13m D x 4.34m H above Grade, North elevation, Sign Face area of 1.02 square | — | Open |
| Apr 21, 2026 | Sign Building Permit Related | 1 WALL SIGN**1 YORKVILLE** | — | Closed |
| Mar 27, 2026 | Building Permit Related(PS) | Plumbing - Interior alterations to - Unit 109 & 110 - Modern Ambition | — | Open |
| Mar 27, 2026 | Building Permit Related(MS) | HVAC - Interior alterations to - Unit 109 & 110 - Modern Ambition | — | Open |
| Mar 24, 2026 | Interior Alterations | Interior alterations to - Unit 109 & 110 - Modern Ambition | $415K | Closed |
| Mar 19, 2026 | Interior Alterations | Revision 01: Revision to permit for interior alterations including demolition of partitions, replacement of an existing glass block wall with storefront glazing, and revisions to partitions and doorsReplacement of existing security screens at existing office suite entrances and replacing them with t | $15K | Closed |
| Mar 18, 2026 | Interior Alterations | Proposal for interior alterations to residential unit. | $30K | Open |
| Mar 6, 2026 | Sign Building Permit Related | Permit required as per 2025 219697 SNP 00 VI***OLIVER'S*** | — | Closed |
| Feb 13, 2026 | Site Service | Site Services work for water, sanitary, and storm management work for a future park | $250K | Open |
| Feb 2, 2026 | Interior Alterations | Rev 01Proposal for new ground floor lobby vestibule. | — | Open |
| Jan 22, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to relocate kitchen sink and remove partition walls in an existing restaurant, greater than 30 seats - UNIT 4, "Aburi Hana" | — | Closed |
| Jan 22, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to relocate kitchen sink and remove partition walls in an existing restaurant, greater than 30 seats - UNIT 4, "Aburi Hana" | — | Closed |
| Jan 21, 2026 | Interior Alterations | Proposal for interior alterations to relocate kitchen sink and remove partition walls in an existing restaurant, greater than 30 seats - UNIT 4, "Aburi Hana" | $350K | Closed |
| Jan 21, 2026 | Interior Alterations | The hydro vault received CAFs from Toronto Hydro and is in deteriorated condition, requiring comprehensive repairs and replacements, including concrete, steel beams, removable slabs, pipes, electrical work, and other associated repairs. | $386K | Open |
| Jan 13, 2026 | Fire Alarm | Replacing the EST3 fire alarm system with an EST4. | $10K | Open |
| Dec 30, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to retail unit partitions. | — | Closed |
| Dec 30, 2025 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to retail unit partitions. | — | Closed |
| Dec 30, 2025 | Interior Alterations | Proposal for interior alterations to retail unit partitions. | $50K | Closed |
The 40 most recent of 957 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.