Street · 1812 of 8,516 by permit count
Building permits on Vulcan St, Etobicoke
The City of Toronto has 107 building permits on record for Vulcan St in Etobicoke, going back to 1999. Declared construction value totals $20.8M. Half of the 100 permits issued here came through within 44 days of the application. The most recent permit was issued Sep 16, 2026 at 65 Vulcan St.
- Permits on record
- 1071999–2026
- Declared construction value
- $20.8Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 44 days17 days slower than the city
Permits issued per year
Zoning
- Most common zone
- EH75.4% of permits · by-law 60.30
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 57of 107 on record
The zoning categories the permits on Vulcan St fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M9W
Looking for one address on Vulcan St? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 16, 2026 | Building Permit Related(MS) | HVAC - Proposed interior alterations for office and wall display. | — | Open |
| Sep 16, 2026 | Building Permit Related(PS) | Plumbing - Proposed interior alterations for office and wall display. | — | Open |
| Sep 4, 2026 | Interior Alterations | Proposed interior alterations for office and wall display. | $55K | Open |
| Aug 24, 2026 | Interior Alterations | Proposed interior alterations for office and wall display. | $55K | Closed |
| Aug 21, 2026 | Interior Alterations | Partial demolition of the existing elevated steel platform originally constructed to support the automated sorting conveyorsystem. The work includes removal of a defined portion of the platform to create the required floor clearance for theinstallation of new storage racks. Associated modifications | $280K | Open |
| Jun 12, 2026 | Other(BA) | Martin Grove Stormwater Pumping Station Upgrade | $11.0M | Open |
| Jun 12, 2026 | Building Permit Related(MS) | HVAC - Martin Grove Stormwater Pumping Station Upgrade | — | Open |
| Sep 30, 2025 | Inside and Outside Drains | Proposed maintenance access hole on the site's sanitary sewer lineas close to the site's property line as possible to allow for sampling and flow monitoring | $25K | Open |
| May 15, 2025 | Building Permit Related(MS) | HVAC - Addition of office space with prefab modular system. Associated electrical, sprinkler and HVAC work proposed. | — | Closed |
| Jun 17, 2024 | Interior Alterations | Addition of office space with prefab modular system. Associated electrical, sprinkler and HVAC work proposed. | $10K | Open |
| Jun 4, 2024 | Other(BA) | Proposal for remedial guarding and ladder repair, misc. metal work, lighting installation, misc. electrical panel and feed installation (see cover letter for detailed work) | $95K | Open |
| Dec 14, 2023 | Other(BA) | Selective removal of existing conveyors and related supportsSelective removal of existing conveyor system sprinkler branch lines to allow for conveyor removal. ***Refer to attached work summary document*** | $750K | Closed |
| Nov 6, 2023 | Demolition | Proposal for demolishing the superstructure to the primary(north) building on the site. There is attached the Engineering Report. | — | Demolition |
| May 29, 2023 | Building Permit Related(PS) | Plumbing - Proposal to upgrades & rehabilitation of Martin Grove SWPS, including replacement of all process pumps, motors, valves, piping, pump starters with VFD, disconnect switches for all equipment, automatic transfer switch, installation of new 50 mm potable water line and backflow preventer, an | — | Closed |
| May 29, 2023 | Building Permit Related(MS) | HVAC - Proposal to upgrades & rehabilitation of Martin Grove SWPS, including replacement of all process pumps, motors, valves, piping, pump starters with VFD, disconnect switches for all equipment, automatic transfer switch, installation of new 50 mm potable water line and backflow preventer, and in | — | Closed |
| May 29, 2023 | Other(BA) | Proposal to upgrades & rehabilitation of Martin Grove SWPS, including replacement of all process pumps, motors, valves, piping, pump starters with VFD, disconnect switches for all equipment, automatic transfer switch, installation of new 50 mm potable water line and backflow preventer, and increasin | $4.6M | Closed |
| Apr 6, 2022 | Building Permit Related (DR) | Drain - Proposal for interior alterations to construct a raised penthouse to accomodate new equipment. | — | Closed |
| Mar 31, 2022 | Interior Alterations | Proposal for interior alterations to construct a raised penthouse to accomodate new equipment. | $250K | Open |
| Sep 30, 2021 | Interior Alterations | Construct interior alterations of 11 indoor tank farm with pipe and pump supports | $500K | Open |
| Aug 11, 2021 | Other(BA) | Construct tank farm foundation for 12 tanks | $300K | Open |
| Mar 29, 2021 | Sprinklers | Sprinkler system upgrade and addition to south and centre system, addition of fire hose to north system | $47K | Open |
| Nov 10, 2020 | Building Permit Related(MS) | HVAC - Support for roof top HVAC and replace exising kitchen exhaust hood | — | Closed |
| Oct 23, 2020 | Multiple Projects | Support for roof top HVAC and replace exising exhaust hood | $95K | Open |
| Jul 23, 2020 | Interior Alterations | REV 01- changes as per drawings | — | Closed |
| Dec 9, 2019 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to existing industrial building to construct new washroom - "Purolator". | — | Closed |
| Dec 9, 2019 | Building Permit Related(MS) | HVAC - Proposed interior alterations to existing industrial building to construct new washroom - "Purolator". | — | Closed |
| Nov 28, 2019 | Backflow Prevention Devices (Water only) | Proposal to replace 2 existing backflow preventers in an existing industrial processing plant. | $7K | Open |
| Aug 22, 2019 | Site Service | Installation of a 1200mm inspection storm manhole at property line, on an existing storm sewer within private property. | $4K | Closed |
| Jul 15, 2019 | Interior Alterations | Construction of a new structural catwalk for Purolator mail sorting floor to allow for safer maintenance to courier conveyors and chutes. | $85K | Closed |
| Jun 19, 2018 | Building Permit Related(MS) | HVAC - Removal of existing office walls and associated walls throughout, addition of offices and washrooms, openings and alteration to exterior doorway - Advanced Computers | — | Closed |
| Jan 22, 2018 | Interior Alterations | Interior Alterations - Construction of a new structural catwalk for Purolator mail sorting floor. | $100K | Closed |
| Sep 13, 2016 | Backflow Prevention Devices (Water only) | Rev 01: Proposal to install 1 backflow prevention device. | — | Closed |
| Aug 23, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a 1 1/2 inch backflow prevention device. | $3K | Closed |
| Aug 19, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a 1 inch backflow prevention device. | $3K | Closed |
| Jul 22, 2016 | Backflow Prevention Devices (Water only) | Install one new Backflow Prevention Devices (Water only) | $4K | Closed |
| Jul 15, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a 2 inch backflow prevention device. Convenience address: 106 Vulcan St. | $2K | Closed |
| Apr 13, 2016 | Building Permit Related(PS) | Plumbing - Proposal to create new interior silo room. Scope includes removing and rebuilding part of building envelope, new interior partitions, new reinforced floor slab, roof reinforcement, sprinkler modification, new floor drains and installation of silos with service platform. | — | Open |
| Apr 13, 2016 | Multiple Projects | Proposal to create new interior silo room. Scope includes removing and rebuilding part of building envelope, new interior partitions, new reinforced floor slab, roof reinforcement, sprinkler modification, new floor drains and installation of silos with service platform. | $150K | Open |
| Jan 21, 2016 | Backflow Prevention Devices (Water only) | Backflow Prevention Devices (Water only) | $1K | Closed |
| Nov 20, 2015 | Backflow Prevention Devices (Water only) | Install backflow prevention device | $2K | Closed |
The 40 most recent of 107 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Vulcan St with a permit on record · 25
- 1 Vulcan St3 permits · to 2023
- 2 Vulcan St4 permits · to 2026
- 10 Vulcan St5 permits · to 2016
- 11 Vulcan St3 permits · to 2013
- 12 Vulcan St7 permits · to 2018
- 24 Vulcan St1 permit · to 2015
- 35 Vulcan St4 permits · to 2023
- 55 Vulcan St10 permits · to 2009
- 60 Vulcan St40 permits · to 2026
- 61 Vulcan St40 permits · to 2026
- 62 Vulcan St40 permits · to 2026
- 65 Vulcan St6 permits · to 2026
- 71 Vulcan St1 permit · to 2016
- 79 Vulcan St4 permits · to 2019
- 85 Vulcan St1 permit · to 2016
- 95 Vulcan St13 permits · to 2022
- 100 Vulcan St7 permits · to 2025
- 101 Vulcan St7 permits · to 2025
- 102 Vulcan St7 permits · to 2025
- 103 Vulcan St7 permits · to 2025
- 104 Vulcan St7 permits · to 2025
- 105 Vulcan St7 permits · to 2025
- 106 Vulcan St7 permits · to 2025
- 110 Vulcan St3 permits · to 2010
- 111 Vulcan St1 permit · to 2015