Street · 1619 of 8,516 by permit count
Building permits on Kelfield St, Etobicoke
The City of Toronto has 120 building permits on record for Kelfield St in Etobicoke, going back to 1998. Declared construction value totals $10.1M. Half of the 116 permits issued here came through within 56 days of the application. The most recent permit was applied for Aug 4, 2026 at 55 Kelfield St.
- Permits on record
- 1201998–2026
- Declared construction value
- $10.1Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 56 days29 days slower than the city
Permits issued per year
Zoning
- Most common zone
- E46.9% of permits · by-law 60.20
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 96of 120 on record
The zoning categories the permits on Kelfield St fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M9W
Looking for one address on Kelfield St? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Aug 4, 2026 | Sign Building Permit Related | To erect and display two illuminated wall signs.***MAPLE LEAF SELF STORAGE*** | — | Closed |
| Mar 10, 2026 | Other(BA) | REVISION 2: PROPOSED CHANGES PER DRAWINGSProposal for interior alterations and add a service ramp/loading area in the rear of existing commercial storage and office building.See also 23 154694 ZAP and 23 211137 MV. | — | Open |
| Jan 29, 2026 | Fire Alarm | Proposal to replace fire alarm control panel; no expansion or modification to the existing field devices/coverage is proposed. | $15K | Closed |
| Jun 27, 2025 | Interior Alterations | INTERIOR ALTERATION OF A AUTOSHOP569-2013 Proposed Use = "Vehicle Repair Shop" | $20K | Open |
| Dec 6, 2024 | Backflow Prevention Devices (Water only) | Replacement of the premise back flow preventer | $2K | Closed |
| Oct 17, 2024 | Building Permit Related(MS) | HVAC - Proposal for interior alterations and add a service ramp/loading area in the rear of existing commercial storage and office building.See also 23 154694 ZAP and 23 211137 MV. | — | Open |
| Oct 10, 2024 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations and add a service ramp/loading area in the rear of existing commercial storage and office building.See also 23 154694 ZAP and 23 211137 MV. | — | Open |
| Sep 13, 2024 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to the ground and mezzanine level of an existing office - Hydro One | — | Open |
| Jul 5, 2024 | Other(BA) | Proposed installation of a motorized sectional overhead door and door system, including all required demolition, and installation of all system, hardware, openers, tracks. Removal of 4 existing concrete pads. New section of asphalt driveway at new overhead door location. | $145K | Open |
| Apr 4, 2023 | Interior Alterations | Proposal for interior alterations to the ground and mezzanine level of an existing office - Hydro One | $150K | Open |
| Nov 4, 2022 | Building Permit Related(MS) | HVAC - Interior alteration to existing office space, build 1 new office, and enlargen existing office. Revise M&E to suite new build out. | — | Closed |
| Nov 4, 2022 | Interior Alterations | Interior alteration to existing office space, build 1 new office, and enlargen existing office. Revise M&E to suite new build out. | $80K | Closed |
| Mar 7, 2022 | Sign Building Permit Related | To erect and display one first party illuminated wall sign displaying static copy at the first storey of west elevation.Dimensions: 2.44m L x 3.35m W x 0.08m D at a height of 6.68m.**Sensa Spa** | — | Closed |
| Aug 4, 2021 | Sign Building Permit Related | To erect and display one illuminated ground sign.****71 KELFIELD ST**** | — | Closed |
| Jul 29, 2021 | Sign Building Permit Related | To erect and display one illuminated ground sign.****81 KELFIELD ST**** | — | Closed |
| Feb 23, 2021 | Sign Building Permit Related | To erect and display one illuminated ground sign.****91 KELFIELD ST**** | — | Closed |
| Jan 28, 2021 | Backflow Prevention Devices (Water only) | Proposal to install a 1" D.C.V.A. Backflow Prevention Device in the existing Warehouse. | $2K | Closed |
| Jul 6, 2020 | Building Permit Related(PS) | Plumbing - Proposed alterations to convert an existing warehouse into Body Rub Services. Front portion of building will be demolished and rebuilt with higher walls, also a new mezzanine is proposed. | — | Closed |
| Jul 6, 2020 | Building Permit Related(MS) | HVAC - Proposed alterations to convert an existing warehouse into Body Rub Services. Front portion of building will be demolished and rebuilt with higher walls, also a new mezzanine is proposed. | — | Closed |
| Jul 6, 2020 | Multiple Projects | Proposed alterations to convert an existing warehouse into Body Rub Services. Front portion of building will be demolished and rebuilt with higher walls, also a new mezzanine is proposed. | $300K | Closed |
| Feb 10, 2020 | Building Permit Related(PS) | Revision 01: modifications to the plumbing sizePlumbing - Proposed 4 storey addition to an existing three storey self storage buidling. | — | Closed |
| Dec 13, 2019 | New Building | Construct new single storey non-climate controlled drive up self storage building H | $150K | New build |
| Oct 21, 2019 | Interior Alterations | Revision 01: Changes to the interior layout to add a new demising wall. (NO USE IS PROPOSED)Interior alterations to expand Unit 2 into Units 1 and 3, which currently vacant. Will add office,warehouse and showroom space | — | Open |
| Jul 10, 2019 | Inside and Outside Drains | Drain - NEW AUTO REPAIR GARAGE FROM FOUNDATION ONWARDS INCLUDES ARCHITECTURE, STRUCTURE, HVAC AND PLUMBING.BUILDING WAS DEMOLISHED BY FIRE. | $150K | Open |
| Jun 26, 2019 | Building Permit Related(PS) | Plumbing - Revision #1: reposition the oil interceptor NEW AUTO REPAIR GARAGE FROM FOUNDATION ONWARDS INCLUDES ARCHITECTURE, STRUCTURE, HVAC AND PLUMBING.BUILDING WAS DEMOLISHED BY FIRE. | — | Closed |
| Jun 13, 2019 | Building Permit Related(MS) | HVAC - Proposed replacement of existing rooftop HVAC equipment. | — | Open |
| Mar 20, 2019 | Building Permit Related(MS) | HVAC - NEW AUTO REPAIR GARAGE FROM FOUNDATION ONWARDS INCLUDES ARCHITECTURE, STRUCTURE, HVAC AND PLUMBING.BUILDING WAS DEMOLISHED BY FIRE. | — | Closed |
| Feb 27, 2019 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to existing Unit 1. | — | Open |
| Feb 1, 2019 | Interior Alterations | Proposed interior alterations to existing Unit 1. | $25K | Open |
| Jan 22, 2019 | Addition(s) | Rev 01: Revision to the column fire proofing material and wall assembly AU barrier product as per bubbled areas.Proposed 4 storey addition to an existing three storey self storage buidling. | — | Closed |
| Jul 31, 2018 | Fire Alarm | Replacemnet of Fire Alarm Control Panel with New | $9K | Closed |
| May 18, 2018 | Fire Damage | NEW AUTO REPAIR GARAGE FROM FOUNDATION ONWARDS INCLUDES ARCHITECTURE, STRUCTURE, HVAC AND PLUMBING.BUILDING WAS DEMOLISHED BY FIRE. | — | Open |
| Mar 1, 2018 | Inside and Outside Drains | Drain - Proposed 4 storey addition to an existingthree storey self storage buidling. | — | Closed |
| Feb 27, 2018 | Building Permit Related(MS) | HVAC - Proposed 4 storey addition to an existingthree storey self storage buidling. | — | Closed |
| Dec 7, 2017 | Building Permit Related(MS) | HVAC - Interior alterations to expand Unit 2 into Units 1 and 3, which currently vacant. Will add office,warehouse and showroom space | — | Open |
| Dec 7, 2017 | Building Permit Related(PS) | Plumbing - Interior alterations to expand Unit 2 into Units 1 and 3, which currently vacant. Will add office,warehouse and showroom space | — | Open |
| Oct 31, 2017 | Fire Alarm | Proposal to install new fire alarm control panel - Building O | $11K | Closed |
| Oct 31, 2017 | Fire Alarm | Proposal to install fire alarm control panel - Building M | $8K | Closed |
| May 18, 2017 | New Building | Proposal to construct a new electrical infrastructure (Automatic Transfer building) | $250K | New build |
| Aug 18, 2016 | Backflow Prevention Devices (Water only) | Proposal to install a 3/4 inch backflow prevention device. | $2K | Closed |
The 40 most recent of 120 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Kelfield St with a permit on record · 20
- 7 Kelfield St2 permits · to 2025
- 10 Kelfield St17 permits · to 2024
- 11 Kelfield St1 permit · to 2015
- 17 Kelfield St1 permit · to 2016
- 21 Kelfield St3 permits · to 2015
- 25 Kelfield St5 permits · to 2022
- 27 Kelfield St1 permit · to 2016
- 29 Kelfield St1 permit · to 2016
- 30 Kelfield St2 permits · to 2021
- 34 Kelfield St4 permits · to 2019
- 38 Kelfield St7 permits · to 2026
- 40 Kelfield St7 permits · to 2014
- 41 Kelfield St1 permit · to 2016
- 49 Kelfield St1 permit · to 2004
- 51 Kelfield St12 permits · to 2015
- 55 Kelfield St11 permits · to 2026
- 65 Kelfield St34 permits · to 2024
- 71 Kelfield St1 permit · to 2021
- 81 Kelfield St8 permits · to 2021
- 91 Kelfield St1 permit · to 2021