thepermitmap

Street · 121 of 8,516 by permit count

Building permits on The East Mall, Etobicoke

The City of Toronto has 941 building permits on record for The East Mall in Etobicoke, going back to 1996. Those permits created 967 homes and removed 0, a net change of +967. Declared construction value totals $380.1M. Half of the 860 permits issued here came through within 32 days of the application. The most recent permit was issued Oct 23, 2026 at 380 The East Mall.

Permits on record
9411996–2026
Declared construction value
$380.1Mas filed, not adjusted
Homes created
967dwelling units
Homes removed
0net +967
Typical wait
32 days5 days slower than the city

Permits issued per year

20002026 (part year)

Zoning

Most common zone
CR60.2% of permits · by-law 40.10
In detached-house zones
2.1%35.8% below the city’s 38.0%
Permits with a zone
606of 941 on record
  • Commercial Residential365 · 60%
  • Employment Industrial150 · 25%
  • Residential30 · 5%
  • Residential Apartment29 · 5%
  • Utility and Transportation25 · 4%
  • Commercial6 · 1%
  • Open Space1 · 0%

The zoning categories the permits on The East Mall fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Minor variances at the Committee of Adjustment

Applications on record
24since 2016

Some projects on The East Mall need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. How variances work, and the approval rates.

Where this street runs

Etobicoke City Centre 457 permits
Islington 237 permits
Alderwood 4 permits

Other streets in M9B

Martin Grove Rd835 permits
Burnhamthorpe Rd611 permits
Laurel Ave424 permits
Rathburn Rd337 permits
Glen Agar Dr313 permits
Shaver Ave N280 permits
Lloyd Manor Rd235 permits

Looking for one address on The East Mall? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Oct 23, 2026 Other(BA) Proposal to install 4 EV Charging Stations, DC Battery Enclosure and 13m Lightpole in the parking log and landscape area.See also 24 193340 ZAP. $200K Open
Oct 22, 2026 Interior Alterations REV 01: Revision to floor plan as per bubbled drawingsProposed interior alterations for pharmacy and medical office — Open
Oct 13, 2026 Building Permit Related(MS) HVAC - Proposed interior alterationsto convert existing retail to indoor golf training facility with practice areas and storage rooms. — Open
Oct 8, 2026 Interior Alterations Proposed interior alterationsto convert existing retail to indoor golf training facility with practice areas and storage rooms. $100K Open
Oct 8, 2026 Building Permit Related(PS) Plumbing - Proposed interior alterationsto convert existing retail to indoor golf training facility with practice areas and storage rooms. — Open
Sep 14, 2026 Multiple Projects Proposal for 2-storey front and rear additions to an existing two-storey detached house, with an intagral garage and a rear balcony. Also, proposed secondary suite in the basement, with a side basement walkout. $400K Open
Sep 14, 2026 Building Permit Related(MS) HVAC - 2 storey addition, convert basement into second unit — Open
Sep 9, 2026 Other Temporary Tents Proposal to iInstall (5) temporary tents for Relish Festival: ONE 82'x82' TENT (CERT#25 135831 000 00), ONE 30'x25' TENT (CERT#25 137586 000 00), ONE 40'x45' TENT (CERT#25 135929 000 00), ONE 30'x40' TENT (CERT#25 135938 000 00), ONE 20'x40' TENT (CERT#25 135795 000 00). Anchored by stakes. Install — Closed
Aug 21, 2026 Certified Tents Proposed installation of five (5) temporary tents for Relish Festival: ONE 82'x82' TENT (CERT#25 135831 000 00), ONE 30'x25' TENT (CERT#25 137586 000 00), ONE 40'x45' TENT (CERT#25 135929 000 00), ONE-30'x40' TENT (CERT#25 135938 000 00), ONE 20'x40' TENT (CERT#25 135795 000 00). Anchored by stakes. — Closed
Aug 17, 2026 Building Permit Related(PS) Plumbing - Proposed interior alterations for fit-out of shell unit into dental office — Open
Aug 17, 2026 Building Permit Related(MS) HVAC - Proposed interior alterations for fit-out of shell unit into dental office — Open
Aug 10, 2026 Interior Alterations Proposed interior alterations for fit-out of shell unit into dental office $590K Open
Jul 29, 2026 Building Permit Related(PS) Plumbing - Proposed interior alterations for pharmacy and medical office — Open
Jul 29, 2026 Building Permit Related(MS) HVAC - Proposed interior alterations for pharmacy and medical office — Open
Jul 9, 2026 Interior Alterations Rev 01 - revision to add new offices Interior Alteration to AN EXISTING PHARMACY(Arch, HVAC (MINOR WORK))Add new MEDICAL OFFICESConvinience Address: 81 THE EAST MALL — Closed
Jul 8, 2026 Building Permit Related(MS) Rev 01- revision to add new offices HVAC - Interior Alteration to AN EXISTING PHARMACY(Arch, HVAC (MINOR WORK))Add new OFFICESConvinience Address: 81 THE EAST MALL — Closed
Jun 23, 2026 Building Permit Related(PS) Plumbing - Interior Alteration to AN EXISTING PHARMACY(Arch, HVAC (MINOR WORK))Add new MEDICAL OFFICESConvinience Address: 81 THE EAST MALL — Open
Jun 22, 2026 Other Temporary Tents Proposal to install two 30' x 40' tents. Install date June 24, Removal date June 29 — Open
Jun 18, 2026 New Building Revision 01 - demise retailPhase 1 Tower D - 11-storey mixed-use building containing 217 residential rental units, 1292 square metres of non-residential gross floor area on the first floor and one level of underground parking. — New build
Jun 17, 2026 Other Temporary Tents Proposal to install two 30' x 40' tents. Install date June 24, Removal date June 29 — Closed
Jun 16, 2026 Building Permit Related(MS) Revision 02 - demise retailRevision 01 - Community space for Tower DPhase 1 Tower D - 11-storey mixed-use building containing 217 residential rental units, 1292 square metres of non-residential gross floor area on the first floor and one level of underground parking. — Open
Jun 16, 2026 Building Permit Related(PS) Revision 02 - demise retailRevision 01 - Community space for Tower DPhase 1 Tower D - 11-storey mixed-use building containing 217 residential rental units, 1292 square metres of non-residential gross floor area on the first floor and one level of underground parking. — Open
Jun 3, 2026 Building Permit Related(PS) Plumbing - Proposal for interior alterations of units 122 - 137. — Open
Jun 3, 2026 Interior Alterations Proposal for interior alterations of units 122 - 137. $1.8M Open
Jun 3, 2026 Building Permit Related(MS) HVAC - Proposal for interior alterations of units 122 - 137. — Open
Jun 2, 2026 Other Temporary Tents To erect two (2) tents and two (2) shade structures for a seasonal garden centre from April 15 to July 15, 2026. — Open
Apr 16, 2026 New Building Phase 1 Tower A - 30-storey rental apartment building containing 277 residential rental units sitting on top underground garage. Underground garage is part of Phase 1 Tower D. $85.0M New build
Apr 8, 2026 Building Permit Related(PS) Revision 01: Revisions marked in bubbled areas on drawings. Plumbing - Proposal to demolish existing redundant mezzanine in warehouse and some partitions on interior. — Closed
Apr 8, 2026 Building Permit Related(MS) Revision 01: Revisions marked in bubbled areas on drawings. HVAC - Proposal to demolish existing redundant mezzanine in warehouse and some partitions on interior. — Closed
Mar 27, 2026 Interior Alterations Proposed new wall to fully separate the second floor from the ground floor for single-tenant use. $6K Closed
Mar 25, 2026 Addition(s) Proposed balcony enclosure on the existing balcony of an apartment unit. $4K Open
Mar 6, 2026 Building Permit Related(FS) FS - Sprinkler Shop Drawing - PHASE 2 - Construct new 39 storey residential building with 438 rental units, including 4 storey podium and 2 levels of u/g parking garage - Tower B — Open
Feb 27, 2026 Alternative Solution Code Analysis for Proposed Alternative Solution for the Omission of Fire Hose Cabinets; — Closed
Feb 5, 2026 Building Permit Related(PS) Plumbing - Proposal to upgrade existing food processing room with new insulated panels and doors. Mechanical, plumbing, and sprinkler adjusted to new layout. — Open
Feb 5, 2026 Interior Alterations Proposal to upgrade existing food processing room with new insulated panels and doors. Mechanical, plumbing, and sprinkler adjusted to new layout. $100K Open
Feb 5, 2026 Building Permit Related(MS) HVAC - Proposal to upgrade existing food processing room with new insulated panels and doors. Mechanical, plumbing, and sprinkler adjusted to new layout. — Open
Feb 4, 2026 Temporary Structures It will be a temporary (seasonal) structure (to be used as a Garden Center) that will go in the parkinglot of Metro for Summer 2026 from March 1st to July 14th, 2026 (approximately 20 weeks). — Open
Jan 16, 2026 Building Permit Related(PS) Revision 2: Revision for updated 6" drain line and incoming water line.Revision 1: Revised HVAC for the existing warehouse and new loading dock addition, and reworked the proposed plumbing.Plumbing - Proposed existing warehouse facility will be renovated for new tenant including a new loading dock a — Open
Jan 12, 2026 Building Permit Related(PS) Plumbing - Proposal for interior alterations to an existing vacant unit for new tenant - "H&R Block Tax Office" — Closed
Jan 12, 2026 Interior Alterations Rev 01Proposed Interior Alterations to convert the existing warehouse to Recreational Use for Indoor soccer with office and lounge areas.Proposal to demolish existing redundant mezzanine in warehouse and add some partitions on interior. $700K Closed

The 40 most recent of 941 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on The East Mall with a permit on record · 76

  • 24 The East Mall4 permits · to 2020
  • 65 The East Mall6 permits · to 2022
  • 70 The East Mall4 permits · to 2018
  • 75 The East Mall1 permit · to 2009
  • 80 The East Mall34 permits · to 2024
  • 81 The East Mall38 permits · to 2026
  • 85 The East Mall25 permits · to 2016
  • 100 The East Mall6 permits · to 2026
  • 103 The East Mall1 permit · to 2016
  • 105 The East Mall3 permits · to 2019
  • 120 The East Mall13 permits · to 2026
  • 124 The East Mall4 permits · to 2026
  • 125 The East Mall1 permit · to 2006
  • 136 The East Mall7 permits · to 2026
  • 140 The East Mall4 permits · to 2016
  • 146 The East Mall12 permits · to 2025
  • 155 The East Mall12 permits · to 2023
  • 225 The East Mall35 permits · to 2019
  • 250 The East Mall249 permits · to 2026
  • 255 The East Mall2 permits · to 2018
  • 269 The East Mall3 permits · to 2024
  • 271 The East Mall1 permit · to 2000
  • 282 The East Mall2 permits · to 2026
  • 300 The East Mall128 permits · to 2026
  • 301 The East Mall115 permits · to 2026
  • 302 The East Mall152 permits · to 2026
  • 303 The East Mall115 permits · to 2026
  • 304 The East Mall134 permits · to 2026
  • 340 The East Mall10 permits · to 2017
  • 345 The East Mall2 permits · to 2023
  • 350 The East Mall12 permits · to 2025
  • 362 The East Mall21 permits · to 2026
  • 364 The East Mall2 permits · to 2014
  • 366 The East Mall1 permit · to 2014
  • 380 The East Mall84 permits · to 2026
  • 385 The East Mall1 permit · to 2011
  • 390 The East Mall4 permits · to 2020
  • 396 The East Mall3 permits · to 2016
  • 400 The East Mall24 permits · to 2021
  • 420 The East Mall3 permits · to 2024
  • 473 The East Mall1 permit · to 2014
  • 481 The East Mall1 permit · to 1999
  • 500 The East Mall12 permits · to 2021
  • 530 The East Mall3 permits · to 2010
  • 535 The East Mall7 permits · to 2024
  • 557 The East Mall1 permit · to 2013
  • 580 The East Mall18 permits · to 2023
  • 589 The East Mall5 permits · to 2006
  • 591 The East Mall4 permits · to 2005
  • 593 The East Mall3 permits · to 2019
  • 600 The East Mall26 permits · to 2025
  • 607 The East Mall14 permits · to 2023
  • 608 The East Mall13 permits · to 2023
  • 609 The East Mall16 permits · to 2023
  • 610 The East Mall13 permits · to 2023
  • 611 The East Mall15 permits · to 2023
  • 612 The East Mall13 permits · to 2023
  • 613 The East Mall14 permits · to 2023
  • 614 The East Mall13 permits · to 2023
  • 615 The East Mall14 permits · to 2023
  • 616 The East Mall13 permits · to 2023
  • 617 The East Mall14 permits · to 2023
  • 620 The East Mall1 permit · to 2017
  • 630 The East Mall6 permits · to 2017
  • 635 The East Mall2 permits · to 2012
  • 900 The East Mall2 permits · to 2024
  • 904 The East Mall3 permits · to 2012
  • 910 The East Mall2 permits · to 2016
  • 911 The East Mall1 permit · to 2016
  • 912 The East Mall1 permit · to 2016
  • 913 The East Mall1 permit · to 2016
  • 914 The East Mall1 permit · to 2016
  • 915 The East Mall1 permit · to 2016
  • 916 The East Mall1 permit · to 2016
  • 924 The East Mall1 permit · to 2014
  • 940 The East Mall3 permits · to 2024
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
941
Data through
2026-10-23
Refresh
Daily from the City
Sheet
STR-168