Street · 3463 of 8,516 by permit count
Building permits on Tempo Ave, North York
The City of Toronto has 46 building permits on record for Tempo Ave in North York, going back to 1996. Declared construction value totals $21.8M. Half of the 42 permits issued here came through within 49 days of the application. The most recent permit was issued Jun 25, 2026 at 10 Tempo Ave.
- Permits on record
- 461996–2026
- Declared construction value
- $21.8Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 49 days22 days slower than the city
Permits issued per year
Most common work
Structures worked on
Postal areas
Other streets in M2H
Looking for one address on Tempo Ave? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jun 25, 2026 | Sign Building Permit Related | To erect and display four illuminated wall signs, displaying static copy, with the following details:Sign 1 with a face measuring 0.67m (L) x 2.47m (W) X 6.37m (H) on the north elevation;Sign 2 with a face measuring 2.87m (L) x 9.63m (W) X 20.15m (H) on the west elevation;Sign 3 with a face measurin | — | Open |
| Jun 19, 2026 | Sign Building Permit Related | 4 Wall Sign****AKUA**** | — | Open |
| May 7, 2026 | Other(BA) | Proposal to alter front entrance. | $50K | Open |
| Aug 25, 2025 | Interior Alterations | PROPOSAL FOR AN INTERIOR ALTERATION TO A SPA WITH SITE ALTERATIONS TO PROVIDE ALL NEW PARKING SPACES AND LOADING SPACES | $18.0M | Open |
| Aug 25, 2025 | Building Permit Related(PS) | Plumbing - PROPOSAL FOR AN INTERIOR ALTERATION TO A SPA | — | Open |
| Aug 25, 2025 | Building Permit Related(MS) | HVAC - PROPOSAL FOR AN INTERIOR ALTERATION TO A SPA | — | Open |
| Sep 25, 2024 | Interior Alterations | Proposal to demolish interior partial non-load bearing wall and related component of the wall on the ground floor of an existing printing press - Building B. | $20K | Open |
| Dec 7, 2021 | Sign Building Permit Related | To erect and display one ground sign | — | Closed |
| Jul 16, 2019 | Multiple Projects | Proposed Interior Alterations to existing industrial warehouse to overlay new concrete slab and install partition wall underside existing mezzanine. | $100K | Open |
| May 29, 2018 | Alter: Boiler/Furnace/AC Replacement | Proposed replacement of one rooftop unit with new unit of the same capacity on the rooftop of existing printing plant. | $40K | Closed |
| Jan 17, 2017 | Building Permit Related(MS) | HVAC - Interior alterations - 2nd Floor | — | Closed |
| Jan 17, 2017 | Interior Alterations | Interior alterations - 2nd Floor | $120K | Open |
| Sep 4, 2015 | Backflow Prevention Devices (Water only) | Backflow Prevention Devices (Water only) | $2K | Open |
| Feb 10, 2015 | Interior Alterations | Interior alterations for a new table top for printing press. | $10K | Open |
| May 14, 2014 | Building Permit Related(PS) | Plumbing - Construct interior alterations to the office space in the warehouse | — | Closed |
| Apr 24, 2014 | Interior Alterations | Construct interior alterations to the office space in the warehouse | $20K | Closed |
| Oct 10, 2012 | Sprinklers | Sprinkler shop drawings for existing gymnasium - raise roof renovation - Grace Chinese Gospel Church | $5K | Closed |
| Aug 17, 2012 | Building Permit Related(PS) | Plumbing - Interior alterations to locker rooms, repair rear stairs and add new exterior door | — | Closed |
| May 24, 2012 | Building Permit Related(MS) | HVAC - Interior alterations to locker rooms, repair rear stairs and add new exterior door | — | Closed |
| May 24, 2012 | Interior Alterations | Interior alterations to locker rooms, repair rear stairs and add new exterior door | $102K | Closed |
| Oct 21, 2011 | Backflow Prevention Devices (Water only) | Install backflow preventor | $5K | Closed |
| Aug 26, 2010 | Interior Alterations | - Conver portion of a Place of worship to be used as a day nursery. | $50K | Closed |
| Feb 10, 2010 | Backflow Prevention Devices (Water only) | Installation of backflow preventor for a printing plant - Metroland | $5K | Closed |
| Mar 20, 2007 | Interior Alterations | Remove & relocation of int wall on the ground floor to metroland printing and publishing ltd. | $50K | Open |
| Feb 23, 2005 | Building Permit Related(PS) | Plumbing - Interior alterations to add day nursery and gymnasium to exisitng place of worship - Interior Alterations | — | Closed |
| Feb 23, 2005 | Interior Alterations | Exterior alterations to existing building and interior alterations for new day nursery/gymnasium. | $1.2M | Closed |
| Jan 21, 2005 | Building Permit Related(MS) | HVAC - Interior alterations to add day nursery and gymnasium to exisitng place of worship - Interior Alterations | — | Closed |
| Aug 17, 2004 | Interior Alterations | make interior alterations by constructing elevator to existing 2nd floor. | $15K | Open |
| May 18, 2004 | Interior Alterations | Interior alterations to office | $200K | Open |
| Jan 8, 2004 | Building Permit Related(MS) | HVAC - INTERIOR ALTERATIONS (INCLUDING NEW MEZZANINE AREA) AND NEW LOADING SPACES TO EXISTING INDUSTRIAL BUILDING. BUILDING "C". - Interior Alterations | — | Closed |
| Jul 4, 2003 | Building Permit Related(MS) | HVAC - TO CONSTRUCT A ONE STOREY ADDITION TO THE EXISTING INDUSTRIAL BUILDING - BUILDING "A". DEMOLITION OF LOADING DOCK IN BUILDING B AND CONSTRUCTION OF A NEW TRANSFORMER VAULT ATTACHED TO BUILDING B. - Addition(s) | — | Closed |
| May 13, 2003 | Building Permit Related(PS) | Install Plumbing in interior alterations to existing Church | — | Closed |
| May 13, 2003 | Building Permit Related(MS) | Install HVAC in interior alterations to existing Church. | — | Closed |
| May 8, 2003 | Interior Alterations | Interior alterations to existing Church | $250K | Open |
| Apr 1, 2003 | Building Permit Related(PS) | Plumbing - TO CONSTRUCT A ONE STOREY ADDITION TO THE EXISTING INDUSTRIAL BUILDING - BUILDING "A". DEMOLITION OF LOADING DOCK IN BUILDING B AND CONSTRUCTION OF A NEW TRANSFORMER VAULT ATTACHED TO BUILDING B. - Addition(s) | — | Closed |
| Nov 21, 2002 | Addition(s) | TO CONSTRUCT A ONE STOREY ADDITION TO THE EXISTING INDUSTRIAL BUILDING - BUILDING "A". DEMOLITION OF LOADING DOCK IN BUILDING B AND CONSTRUCTION OF A NEW TRANSFORMER VAULT ATTACHED TO BUILDING B. | $1.0M | Open |
| Oct 16, 2002 | Interior Alterations | INTERIOR ALTERATIONS (INCLUDING NEW MEZZANINE AREA) AND NEW LOADING SPACES TO EXISTING INDUSTRIAL BUILDING. BUILDING "C". | $100K | Open |
| Sep 25, 2002 | Demolition | Demolish 918.4 sq. m. of existing building. | — | Demolition |
| Aug 29, 2002 | Addition to Existing Building | ONE STOREY ADDITION TO EXISTING INDUSTRIAL BUILDING | — | Closed |
| Jun 28, 2002 | Multiple Projects | INTERIOR ALTERATIONS TO OFFICE AND WAREHOUSE, AND ADDITION OF OVERHEAD DOORS. | $100K | Closed |
The 40 most recent of 46 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Tempo Ave with a permit on record · 6
- 10 Tempo Ave22 permits · to 2026
- 30 Tempo Ave1 permit · to 2011
- 55 Tempo Ave3 permits · to 2012
- 100 Tempo Ave8 permits · to 2019
- 201 Tempo Ave11 permits · to 2026
- 250 Tempo Ave1 permit · to 2015