Street · 6455 of 8,565 by permit count
Building permits on Subway Cres
The City of Toronto has 13 building permits on record for Subway Cres, going back to 2011. Declared construction value totals $1.7M. The most recent permit was issued Dec 3, 2024 at 120 Subway Cres.
- Permits on record
- 132011–2024
- Declared construction value
- $1.7Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20112024 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Dec 3, 2024 | Interior Alterations | Proposal for new Second Cup Kiosk in the Kipling Go Station | $130K | Closed |
| Dec 3, 2024 | Building Permit Related(PS) | Plumbing - Proposal for new Second Cup Kiosk in the Kipling Go Station | — | Open |
| Mar 7, 2022 | Other(BA) | Construction of new concrete planters & dividing wood fence panels on existing roof deck complete with waterproofing tie-in to existing. Work includes removal and reinstatement of existing overburden and completion of landscaping finishes to match existing (sod) | $250K | Closed |
| Jan 8, 2020 | Building Permit Related(PS) | Revision 01: General revision to the permit plansPlumbing - Proposed above ground renovation of Passenger Pick Up and Drop off including a new elevator to accomodate the tie-in with the new Metrolinx tunnel from the Bus Terminal. | — | Closed |
| Nov 12, 2019 | Building Permit Related(MS) | Revision 01: General revision to the permit plansHVAC - Proposed above ground renovation of Passenger Pick Up and Drop off including a new elevator to accomodate the tie-in with the new Metrolinx tunnel from the Bus Terminal. | — | Closed |
| Nov 12, 2019 | Interior Alterations | Revision 01: General revision to the permit plansProposed above ground renovation of Passenger Pick Up and Drop off including a new elevator to accommodate the tie-in with the new Metrolinx tunnel from the Bus Terminal. @ Kipling station | — | Closed |
| May 24, 2019 | Unspecified | Site Works (Site Servicing) for the new parking areas and connections. Works include site services, concrete paving, landscaping, asphalt paving, curbs and sidewalks etc | — | Closed |
| Nov 16, 2018 | Garage Repair/Reconstruction | Proposal for repair and waterproofing of garage roof slab. | $250K | Open |
| Sep 14, 2018 | Garage Repair/Reconstruction | Proposal for repair and waterproofing of garage roof slab. | $250K | Closed |
| Aug 2, 2017 | Garage Repair/Reconstruction | Proposal for garage repairs (P1). | $190K | Open |
| Sep 8, 2016 | HVAC: Groups A & B | Proposal for replacement of swimming pool dehumidification system | $118K | Closed |
| Mar 14, 2013 | Piping: Other Buildings | Replacement of domestic hot water piping from 'M' to 'L' copper type. | $500K | Closed |
| Apr 27, 2011 | Backflow Prevention Devices (Water only) | (2) backflow prevention device to sprinkler room in basement of apartment building. | $5K | Closed |
The 13 most recent of 13 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.