thepermitmap

Street · 6446 of 8,516 by permit count

Building permits on Subway Cres, Etobicoke

The City of Toronto has 13 building permits on record for Subway Cres in Etobicoke, going back to 2011. Declared construction value totals $1.7M. The most recent permit was issued Dec 3, 2024 at 120 Subway Cres.

Permits on record
132011–2024
Declared construction value
$1.7Mas filed, not adjusted
Homes created
0dwelling units
Homes removed
0net +0

Permits issued per year

20112024 (part year)

Other streets in M9B

Harrowby Crt15 permits
Echo Valley Rd14 permits
Peterlee Ave14 permits
Tamerlane Crt13 permits
Bowness Crt11 permits
Gordon Park Dr11 permits

Looking for one address on Subway Cres? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Dec 3, 2024 Interior Alterations Proposal for new Second Cup Kiosk in the Kipling Go Station $130K Closed
Dec 3, 2024 Building Permit Related(PS) Plumbing - Proposal for new Second Cup Kiosk in the Kipling Go Station — Open
Mar 7, 2022 Other(BA) Construction of new concrete planters & dividing wood fence panels on existing roof deck complete with waterproofing tie-in to existing. Work includes removal and reinstatement of existing overburden and completion of landscaping finishes to match existing (sod) $250K Closed
Jan 8, 2020 Building Permit Related(PS) Revision 01: General revision to the permit plansPlumbing - Proposed above ground renovation of Passenger Pick Up and Drop off including a new elevator to accomodate the tie-in with the new Metrolinx tunnel from the Bus Terminal. — Closed
Nov 12, 2019 Building Permit Related(MS) Revision 01: General revision to the permit plansHVAC - Proposed above ground renovation of Passenger Pick Up and Drop off including a new elevator to accomodate the tie-in with the new Metrolinx tunnel from the Bus Terminal. — Closed
Nov 12, 2019 Interior Alterations Revision 01: General revision to the permit plansProposed above ground renovation of Passenger Pick Up and Drop off including a new elevator to accommodate the tie-in with the new Metrolinx tunnel from the Bus Terminal. @ Kipling station — Closed
May 24, 2019 Unspecified Site Works (Site Servicing) for the new parking areas and connections. Works include site services, concrete paving, landscaping, asphalt paving, curbs and sidewalks etc — Closed
Nov 16, 2018 Garage Repair/Reconstruction Proposal for repair and waterproofing of garage roof slab. $250K Open
Sep 14, 2018 Garage Repair/Reconstruction Proposal for repair and waterproofing of garage roof slab. $250K Closed
Aug 2, 2017 Garage Repair/Reconstruction Proposal for garage repairs (P1). $190K Open
Sep 8, 2016 HVAC: Groups A & B Proposal for replacement of swimming pool dehumidification system $118K Closed
Mar 14, 2013 Piping: Other Buildings Replacement of domestic hot water piping from 'M' to 'L' copper type. $500K Closed
Apr 27, 2011 Backflow Prevention Devices (Water only) (2) backflow prevention device to sprinkler room in basement of apartment building. $5K Closed

The 13 most recent of 13 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Subway Cres with a permit on record · 2

  • 101 Subway Cres7 permits · to 2022
  • 120 Subway Cres6 permits · to 2024
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
13
Data through
2025-12-29
Refresh
Daily from the City
Sheet
STR-699