Street · 111 of 8,565 by permit count
Building permits on Sherbourne St
The City of Toronto has 1,010 building permits on record for Sherbourne St, going back to 1974. Those permits created 3,458 homes and removed 18, a net change of +3,440. Declared construction value totals $1.7B. The most recent permit was issued Sep 2, 2026 at 611 Sherbourne St.
- Permits on record
- 1,0101974–2026
- Declared construction value
- $1.7Bas filed, not adjusted
- Homes created
- 3,458dwelling units
- Homes removed
- 18net +3,440
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Where this street runs
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 2, 2026 | New Building | Revision No.3: ADDITION OF DEMISING PARTITION WALL IN RETAIL SHELL SPACE. REPLACES ARCHITECTURAL PAGES A2.01a, A4.03REV : Proposed revision for framing. Proposal to construct a new 53 storey mixed use building with 501 residential units, 5 levels of underground parking, retail shell on the ground fl | — | New build |
| Sep 1, 2026 | Inside and Outside Drains | Drain - Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units. | — | Closed |
| Sep 1, 2026 | Partial Permit - Shoring | Part Permit - Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units. | — | Open |
| Aug 25, 2026 | Building Permit Related(PS) | REV01: Proposed revision to existing building permit to add 7 suites along north side of existing 3 storey building and new laundry room in basement.Plumbing - Proposal for interior alterations to convert existing offices on ground, second & third floor into hotel / hostel use. | — | Open |
| Aug 25, 2026 | Building Permit Related(MS) | REV01: Proposed revision to existing building permit to add 7 suites along north side of existing 3 storey building and new laundry room in basement.HVAC - Proposal for interior alterations to convert existing offices on ground, second & third floor into hotel / hostel use. | — | Open |
| Aug 24, 2026 | Site Service | Drain - Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units. | $279K | Open |
| Aug 20, 2026 | Building Permit Related(MS) | HVAC - Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units. | — | Open |
| Aug 20, 2026 | Building Permit Related (DR) | Drain - Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units. | — | Open |
| Aug 20, 2026 | Building Permit Related(PS) | Plumbing - Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units. | — | Open |
| Aug 20, 2026 | New Building | Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units. | $150.0M | New build |
| Aug 19, 2026 | Interior Alterations | REV01: Proposed revision to existing building permit to add 7 suites along north side of existing 3 storey building and new laundry room in basement.Proposal for interior alterations to convert existing offices on ground, second & third floor into hotel / hostel use. | — | Open |
| Jul 30, 2026 | Alter: Boiler/Furnace/AC Replacement | Replacement of Heating and Domestic Hot Water Boiler | $700K | Open |
| Jul 29, 2026 | New Building | REV 02: Revision to permit, changes related to basement level, revised exit sign, added pull station to east door, added enter phone to east door, and added pull station to east door (as bubbled) | — | New build |
| Jul 21, 2026 | Building Permit Related(MS) | HVAC - Demolish rear and south portion of existing heritage building (725sq.m.). Interior renovations (282sq.m.) and construct new exterior walls to enclosed building along the rear and south sides | — | Open |
| Jul 9, 2026 | Site Service | REV: This is a permit application for an amended STS Permit for the Moss Park construction site. Toronto Water is no longer allowing temporary water supply from hydrants therefore this application is to tie into the street water main.Proposal for Temporary Site Services for the Moss Park constructio | — | Open |
| Jul 7, 2026 | Electromagnetic Locks | Addition of Electromagnetic Lock to existing gate exit from existing patio area and addition of required signage etc to provide required safety functions as shown on the plan. | $18K | Open |
| Jun 29, 2026 | Demolition | Demolition of a townhouse. The residential structure will be replaced with a 69 storey tower with 4 levels of underground parking. | — | Demolition |
| Jun 29, 2026 | Demolition | Demolition of a townhouse. The residential structure will be replaced with a 69 storey tower with 4 levels of underground parking. | — | Demolition |
| Jun 29, 2026 | Partial Permit - Shoring | Part Permit - Construction of a 37 storey building with 2 levels of underground parking garage for TCHC | — | Open |
| Jun 29, 2026 | Demolition | Demolition of a townhouse. The residential structure will be replaced with a 69 storey tower with 4 levels of underground parking. | — | Demolition |
| Jun 29, 2026 | New Building | Construction of a 37 storey building with 2 levels of underground parking garage for TCHC | $115.0M | New build |
| Jun 11, 2026 | Other(MS) | Proposal for DHW equipment replacement | $260K | Open |
| Jun 2, 2026 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - To construct new Ontario Line South transit - Moss Park Transit Station plus bike shelter | — | Open |
| May 12, 2026 | Backflow Prevention Devices (Water only) | Proposal to install a backflow preventer for incoming waterline. | $5K | Open |
| May 12, 2026 | Backflow Prevention Devices (Water only) | Install a backflow preventer for incoming waterline. | $8K | Open |
| May 12, 2026 | Backflow Prevention Devices (Water only) | Proposal to install a backflow preventer for incoming waterline. | $5K | Open |
| Apr 29, 2026 | Sign Building Permit Related | 1 WALL SIGN and 1PROJECTING SIGN**TIM HORTONS** | — | Closed |
| Apr 13, 2026 | Other(BA) | Proposal for scope of work involves repairing deteriorated wood balconies at the existing building | $113K | Open |
| Apr 2, 2026 | Building Permit Related(PS) | Plumbing - Proposal for New 21 Storey Student Residents | — | Open |
| Apr 1, 2026 | Building Permit Related(MS) | HVAC - Proposal for New 21 Storey Student Residents | — | Open |
| Mar 26, 2026 | Other(BA) | Proposal for alterations to exterior parking, line painting, tactiles, curbs, ramps and stairs | $50K | Closed |
| Mar 19, 2026 | Building Permit Related(MS) | HVAC - To construct new Ontario Line South transit - Moss Park Transit Station plus bike shelter | — | Open |
| Feb 23, 2026 | Building Permit Related (DR) | Drain - Proposed addition to existing arena to be used as refrigeration room | — | Open |
| Feb 23, 2026 | Building Permit Related(PS) | Plumbing - Proposed addition to existing arena to be used as refrigeration room | — | Open |
| Feb 23, 2026 | Addition(s) | Proposed addition to existing arena to be used as refrigeration room | $2.7M | Open |
| Feb 23, 2026 | Building Permit Related(MS) | HVAC - Proposed addition to existing arena to be used as refrigeration room | — | Open |
| Feb 9, 2026 | Alternative Solution | Propoosal to fire wrap the natural gas pipe line serving the emergency generator located above the P1 Mezzanine Level. | — | Closed |
| Feb 2, 2026 | Building Permit Related(PS) | Plumbing - To construct new Ontario Line South transit - Moss Park Transit Station plus bike shelter | — | Open |
| Feb 2, 2026 | Partial Permit - Structural Framing | Conditional Permit - Part Permit - To construct new Ontario Line South transit - Moss Park Transit Station plus bike shelter | — | Open |
| Jan 16, 2026 | Sign Building Permit Related | 2 Overhanging Structure Sign1 Wall Sign" BURKE " | — | Closed |
The 40 most recent of 1,010 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.