thepermitmap

Street · 692 of 8,516 by permit count

Building permits on Scollard St

The City of Toronto has 252 building permits on record for Scollard St, going back to 1997. Those permits created 5 homes and removed 5, a net change of +0. Declared construction value totals $15.4M. Half of the 212 permits issued here came through within 33 days of the application. The most recent permit was issued Sep 18, 2026 at 55 Scollard St.

Permits on record
2521997–2026
Declared construction value
$15.4Mas filed, not adjusted
Homes created
5dwelling units
Homes removed
5net +0
Typical wait
33 days6 days slower than the city

Permits issued per year

20002026 (part year)

Zoning

Most common zone
CR100.0% of permits · by-law 40.10
In detached-house zones
0.0%38.0% below the city’s 38.0%
Permits with a zone
246of 252 on record
  • Commercial Residential246 · 100%

The zoning categories the permits on Scollard St fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Other streets in M5R

Hazelton Ave394 permits
Kendal Ave350 permits
Bedford Rd335 permits
Admiral Rd302 permits
Hilton Ave244 permits
Bernard Ave224 permits
Lowther Ave205 permits

Looking for one address on Scollard St? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Sep 18, 2026 Other(PS) Proposed bathroom renovation $25K Open
Sep 4, 2026 Demolition Proposal to demolition of existing 3-storey and one-storey buildings 876 Yonge Street & 9 Scollard Street to allow the construction of a new 50-storey residential building with a 10m underground (2-levels) on the property. (11 Scollard St - Vacant - Surface parking lot) — Demolition
Jul 17, 2026 Fire Damage Revision 01: Changes are for the addition of a new RTU unit in basement and full renovation to both residential units. Scope unrelated to fire damageProposal to structural fire damage restoration on third floor and roof level — Open
Jul 15, 2026 Other(BA) Localised repair of hydro vaults( only -No cladding work) $500K Open
Jun 16, 2026 Building Permit Related(PS) Plumbing - PROPOSED INTERIOR ALTERATIONS AND EXTERIOR FACADE REVISIONS TO EXISTING EATING ESTABLISHMENT (GROUND FLOOR & BASEMENT) — Closed
Jun 16, 2026 Building Permit Related(MS) HVAC - PROPOSED INTERIOR ALTERATIONS AND EXTERIOR FACADE REVISIONS TO EXISTING EATING ESTABLISHMENT (GROUND FLOOR & BASEMENT) — Closed
Jun 16, 2026 Multiple Projects PROPOSED INTERIOR ALTERATIONS AND EXTERIOR FACADE REVISIONS TO EXISTING EATING ESTABLISHMENT (GROUND FLOOR & BASEMENT) $1.0M Closed
May 12, 2026 Interior Alterations Revision 1: Revised Washroom Layout, Interior Layout, and Stair Refinement.Proposal for interior alterations for restaurant. — Open
Apr 15, 2026 Demolition Proposed demolition of a 2 storey office building due to fire damage. — Demolition
Apr 10, 2026 Building Permit Related(MS) HVAC - Proposal for interior alterations to existing residential unit - 606 — Open
Apr 10, 2026 Building Permit Related(PS) Plumbing - Proposal for interior alterations to existing residential unit - 606 — Open
Mar 30, 2026 Demolition Structural fire damage demolition. — Demolition
Mar 25, 2026 Interior Alterations Proposal for interior alterations to existing residential unit - 606 $500K Open
Mar 16, 2026 Interior Alterations — $1K Closed
Feb 19, 2026 Multiple Projects Proposal for interior alterations $150K Open
Oct 16, 2025 Building Permit Related(MS) Revision 01: Changes are for the addition of a new RTU unit to service the residential units and the associated architectural and structural changes associated with the mechanical design changes.HVAC - Proposal to structural fire damage restoration on third floor and roof level — Open
Sep 30, 2025 Multiple Projects Proposal for interior alterations and underpinning. $150K Closed
Sep 18, 2025 Other(BA) Proposed removal of veranda and construct a second floor deck with a staircase to ground level in rear yard of existing row house. $35K Closed
Sep 17, 2025 Building Permit Related(MS) REV 02: HVAC - TO REFLECT REVISED TOTAL RESIDENTIAL UNITS REV 01: UPDATED DRAWINGS HVAC - Proposal to construct a 42-storey mixed use building consisting of 112 residential units, 4 levels of below grade parking and ground floor commercial/retail space, — Open
Sep 17, 2025 Building Permit Related(PS) REV 02: PLUMBING - TO REFLECT REVISED TOTAL RESIDENTIAL UNITS Plumbing - Proposal to construct a 42-storey mixed use building consisting of 112 residential units, 4 levels of below grade parking and ground floor commercial/retail space. — Open
Sep 3, 2025 New Building REV 01: TO REFLECT REVISED TOTAL RESIDENTIAL UNITS - CHANGE UNIT COUNT FROM 148 TO 129Proposal to construct a 42-storey mixed use building consisting of 147 residential units, 4 levels of below grade parking and ground floor commercial/retail space. — New build
Jun 24, 2025 Interior Alterations PROPOSAL TO REPAIR TO MIXED-USE BUILDING DUE TO FIRE/ SMOKE DAMAGE. REPAIRS TO PARTY WALL. $20K Closed
Apr 29, 2025 Building Permit Related(MS) HVAC - Proposal for interior alterations for restaurant. — Open
Apr 29, 2025 Building Permit Related(PS) Plumbing - Proposal for interior alterations for restaurant. — Open
Mar 12, 2025 Demolition Proposal to demolish the remainder of building due to fire damage. — Demolition
Mar 12, 2025 Demolition Proposal to demolish the remainder of building due to fire damage. — Demolition
Mar 12, 2025 Demolition Proposal to demolish the remainder of building due to fire damage. — Demolition
Mar 12, 2025 Demolition Proposal to demolish the remainder of building due to fire damage. — Demolition
Mar 12, 2025 Demolition Proposal to demolish the remainder of building due to fire damage. — Demolition
Mar 12, 2025 Demolition Proposal to demolish the remainder of building due to fire damage. — Demolition
Feb 3, 2025 Other(BA) Proposal for a wholesale building envelope sealant replacement and suspended balcony slab repairs and waterproofing. Area of work is inclusive of structural concrete repairs only. $600K Open
Jul 11, 2024 Building Permit Related(PS) Plumbing - Convert the existing townhouse units 96, 98 and 100 Scollard St. to an office. Scope of work includes a two storey rear addition and basement and deck, interior alterations front porch and walkout stairs. — Open
Jul 10, 2024 Building Permit Related(PS) Plumbing - Convert the existing mixed use townhouse units 102, 104, and 104 1/2 Scollard St. to a single family townhouse unit. Scope of work includes a two storey rear addition and basement and deck, interior alterations front porch, walkout stair and roof terraces. — Open
Jul 5, 2024 Addition(s) To convert the existing two storey buildings at 96, 98 and 100 Scollard St. to an office use. Scope of work includes two storey rear additions, partial third floor addition, third floor roof terrace, interior alterations, basement rear additions, rear yard deck, front porch and stairs, front chair l $300K Open
Jul 5, 2024 Building Permit Related(MS) HVAC - Convert the existing townhouse units 96, 98 and 100 Scollard St. to an office. Scope of work includes a two storey rear addition and basement and deck, interior alterations front porch and walkout stairs. — Open
Jul 5, 2024 Building Permit Related(MS) HVAC - Convert the existing townhouse units 102, 104, and 104 1/2 Scollard St. to a single family townhouse unit. Scope of work includes a two storey rear addition and basement and deck, interior alterations front porch, walkout stair and roof terraces. — Open
Jul 5, 2024 Addition(s) Convert the existing buildings at 102, 104, and 104 1/2 Scollard St. to a single residential unit. Scope of work includes two storey rear additions, basement rear additions, rear yard deck, interior alterations, front porch and stairs, and front basement walkout stairs. $300K Open
Jun 28, 2024 Building Permit Related(PS) Fevision - Keeping existing plumbing fixtures locations.Rev 01: removal of proposed elevator and plan revisionsPlumbing - PROPOSED: Installation of new elevator and interior alteration of 3 floors above ground and basement office, front entry facade and canopy reclad — Closed
May 27, 2024 Sign Building Permit Related **FOR INFORMATION PURPOSES ONLY**This property is located in the CR- Commercial Residential sign district and is subject to the City of Toronto Municipal Code Chapter 694, Signs, GeneralThe proposal contains one first party projecting sign, displaying static copy, erected at the first storey on the — Closed
Apr 16, 2024 Multiple Projects Rev 01: removal of proposed elevator and plan revisionsPROPOSED: Installation of new elevator and interior alteration of 3 floors above ground and basement office, front entry facade and canopy reclad — Closed

The 40 most recent of 252 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Scollard St with a permit on record · 50

  • 6 Scollard St3 permits · to 2009
  • 8 Scollard St2 permits · to 2022
  • 9 Scollard St1 permit · to 2026
  • 10 Scollard St6 permits · to 2006
  • 21 Scollard St8 permits · to 2025
  • 22 Scollard St3 permits · to 2017
  • 24 Scollard St7 permits · to 2017
  • 26 Scollard St7 permits · to 2017
  • 28 Scollard St2 permits · to 2014
  • 30 Scollard St7 permits · to 2002
  • 32 Scollard St2 permits · to 2008
  • 40 Scollard St15 permits · to 2026
  • 50 Scollard St17 permits · to 2026
  • 54 Scollard St2 permits · to 2020
  • 55 Scollard St12 permits · to 2026
  • 56 Scollard St1 permit · to 2020
  • 58 Scollard St1 permit · to 2020
  • 68 Scollard St11 permits · to 2018
  • 72 Scollard St4 permits · to 2012
  • 74 Scollard St6 permits · to 2025
  • 76 Scollard St2 permits · to 2012
  • 79 Scollard St3 permits · to 2003
  • 80 Scollard St1 permit · to 2007
  • 82 Scollard St2 permits · to 2016
  • 84 Scollard St2 permits · to 2019
  • 86 Scollard St4 permits · to 2023
  • 87 Scollard St8 permits · to 2020
  • 90 Scollard St1 permit · to 2013
  • 91 Scollard St19 permits · to 2021
  • 92 Scollard St13 permits · to 2026
  • 94 Scollard St3 permits · to 2026
  • 95 Scollard St1 permit · to 2005
  • 96 Scollard St7 permits · to 2025
  • 97 Scollard St4 permits · to 2006
  • 98 Scollard St1 permit · to 2025
  • 99 Scollard St9 permits · to 2024
  • 100 Scollard St3 permits · to 2025
  • 101 Scollard St4 permits · to 2011
  • 102 Scollard St5 permits · to 2025
  • 104 Scollard St4 permits · to 2025
  • 105 Scollard St9 permits · to 2026
  • 106 Scollard St5 permits · to 2026
  • 108 Scollard St1 permit · to 2025
  • 109 Scollard St1 permit · to 2006
  • 110 Scollard St2 permits · to 2024
  • 112 Scollard St2 permits · to 1999
  • 120 Scollard St7 permits · to 2018
  • 121 Scollard St4 permits · to 2022
  • 122 Scollard St5 permits · to 2017
  • 126 Scollard St3 permits · to 2006
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
252
Data through
2026-10-05
Refresh
Daily from the City
Sheet
STR-890