thepermitmap

Street · 838 of 8,516 by permit count

Building permits on Prince Arthur Ave

The City of Toronto has 217 building permits on record for Prince Arthur Ave, going back to 1994. Those permits created 1 homes and removed 0, a net change of +1. Declared construction value totals $32.2M. Half of the 193 permits issued here came through within 28 days of the application. The most recent permit was applied for Oct 30, 2026 at 8 Prince Arthur Ave.

Permits on record
2171994–2026
Declared construction value
$32.2Mas filed, not adjusted
Homes created
1dwelling units
Homes removed
0net +1
Typical wait
28 days1 day slower than the city

Permits issued per year

20002026 (part year)

Zoning

Most common zone
CR80.5% of permits · by-law 40.10
In detached-house zones
0.0%38.0% below the city’s 38.0%
Permits with a zone
164of 217 on record
  • Commercial Residential132 · 80%
  • Residential32 · 20%

The zoning categories the permits on Prince Arthur Ave fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Most common work

Structures worked on

Postal areas

Other streets in M5R

Admiral Rd302 permits
Scollard St252 permits
Hilton Ave244 permits
Bernard Ave224 permits
Lowther Ave205 permits
Boswell Ave183 permits
Tranby Ave172 permits
Lyndhurst Ave163 permits

Looking for one address on Prince Arthur Ave? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Oct 30, 2026 Partial Permit - Shoring Part Permit - Proposal for interior alteration and 3 stotrey addition and mechanical penthouse level to an existing 3 storey commercial building — Open
Oct 30, 2026 Building Permit Related(MS) HVAC - Proposal for interior alteration and 3 stotrey addition and mechanical penthouse level to an existing 3 storey commercial building — Open
Oct 30, 2026 Building Permit Related(PS) Plumbing - Proposal for interior alteration and 3 stotrey addition and mechanical penthouse level to an existing 3 storey commercial building — Open
Oct 19, 2026 Multiple Projects Proposal for interior alteration and 3 stotrey addition and mechanical penthouse level to an existing 3 storey commercial building $5.0M Open
Sep 23, 2026 Multiple Projects Revision 01: Proposed Interior Renovations. Updated Underpinning depths to an existing 3 Storey Commercial BuildingProposed interior alterations and underpinning (118.50 sm) — Open
Mar 13, 2026 Multiple Projects REVISION 2- add one room in the basement (Booth 015), revise the open waiting room 104 to an enclosed meeting room (Meeting 104) with accessible door added, revise the glazed partition at (Boardroom 105) from an operable partition, to a fixed partition with accessible doors, whereas previous mechani — Open
Mar 2, 2026 Building Permit Related(MS) REVISION - add one room in the basement (Booth 015), revise the open waiting room 104 to an enclosed meeting room (Meeting 104) with accessible door added, revise the glazed partition at (Boardroom 105) from an operable partition, to a fixed partition with accessible doors, whereas previous mechanic — Open
Mar 2, 2026 Building Permit Related(PS) REVISION - add one room in the basement (Booth 015), revise the open waiting room 104 to an enclosed meeting room (Meeting 104) with accessible door added, revise the glazed partition at (Boardroom 105) from an operable partition, to a fixed partition with accessible doors, whereas previous mechanic — Open
Feb 11, 2026 Sprinklers Proposal for supply and installation of sprinkler - 4" black steel sch10 sprinkler main on basement level up to and including the 4th floor c/w zone controls on each floor; 2" black steel sch10 sprinkler branch lines on basement level up to and including the 4th floor; 3" black steel sch10 window sp $152K Open
Dec 3, 2025 New Building Revision 02: Proposed pergola structure on suite 503 balcony.Revision 01 - Proposed alteration to an existing Building Permit for the 7th floor and mechanical penthouse layout (21 246313 BLD 00 NB)Interior Altertaions to Ground and second floor suite was added later as part of this revision -------- — New build
Sep 10, 2025 Alter: Boiler/Furnace/AC Replacement Proposal to replace 2 heating boilers. $200K Open
Aug 13, 2025 Interior Alterations Proposal for interior alteration to existing washroom, medical lab and general office space. $28K Closed
Jul 31, 2025 Building Permit Related(PS) Plumbing 01 - Proposed alteration to an existing Building Permit for the 7th floor and mechanical penthouse layout Plumbing - Proposed 7 storey mixed-use building with commercial on ground and 2 levels of underground garage; including a renovation to a re-located existing 2 storey heritage building — Open
Jul 28, 2025 Building Permit Related(MS) HVAC Revision 01 - Proposed alteration to an existing Building Permit for the 7th floor and mechanical penthouse layout (21 246313 BLD 00 NB)-------------------------------------------------------------------------------HVAC - Proposed 7 storey mixed-use building with commercial on ground and 2 leve — Open
Jun 19, 2025 Garage Repair/Reconstruction Proposed garage roof deck waterproofing $11K Open
May 8, 2025 Other(BA) Proposal for Stairwell Guard Alterations $130K Open
Apr 22, 2025 Demolition Proposal to demolish a two storey commercial building to facilitate a new building development of a residential apartment builidng. — Demolition
Apr 3, 2025 Re-Roofing/Re-Cladding Proposed masonry wall replacement at mechanical penthouse $100K Closed
Feb 4, 2025 Alternative Solution The Alternative Solution addresses protection of non-rated frames located between the sprinkler- protected glazed assemblies and adjacent unprotected openings, with closely spaced sprinklers. — Closed
Jan 24, 2025 Inside and Outside Drains Drain - Interior alterations and 4-storey rear addition to existing 3-storey building. $10.0M Open
Dec 9, 2024 Electromagnetic Locks Proposal for installation of one (1) maglock on ground floor. $1K Closed
Sep 6, 2024 Building Permit Related(PS) Plumbing - Proposed interior alterations. — Closed
Aug 19, 2024 Interior Alterations Proposed interior alterations. $150K Closed
Jun 14, 2024 Building Permit Related (DR) Drain - Interior alterations and 4-storey rear addition to existing 3-storey building. — Open
Apr 8, 2024 Alternative Solution Proposed alternative solution to fire seporation for roof top terrace walkable skylight. — Closed
Mar 26, 2024 Alternative Solution Alternative Solution for sprinkler Protected Glazing:Based on the limiting distance 79.74% to 80.69% of the area is required to have a fire resistance rating of not less than 1 h and is proposed to be achieved through sprinkler protected glazing/window sprinklers design in accordance with OBC 3.1.8. — Closed
Mar 21, 2024 Building Permit Related(PS) Plumbing - Proposed interior alterations. — Open
Mar 21, 2024 Building Permit Related(MS) HVAC - Proposed interior alterations. — Open
Mar 14, 2024 Interior Alterations Proposed interior alterations. $150K Open
Feb 29, 2024 Alternative Solution Proposed for all floors to design a standpipe system in a manner that standpipe risers provided with hose connections will be located in exit stairs enclosures or in 1hr rated shafts, if required. No fire hose cabinets will be provided on the floor areas or in the exit stairs. — Closed
Feb 26, 2024 Alternative Solution Alternative Solution for Exiting and Barrier free Access:ExitingThe minimum clear width required for exterior passageway is required to be 1100 mm and OBC 3.4.1.2.(2) highlights that exits are permitted to converge provided the cumulative capacity of converging exits does not contribute more than 50 — Open
Feb 6, 2024 Interior Alterations Interior alterations to an existing residential suite in an existing apartment building - UNIT 1205 $10K Open
Dec 28, 2023 Building Permit Related(PS) Plumbing - Proposal to demolish exitsing offce and reconstruct office to new layout for office purposes. — Closed
Dec 28, 2023 Building Permit Related(MS) HVAC - Proposal to demolish exitsing offce and reconstruct office to new layout for office purposes. — Closed
Dec 28, 2023 Interior Alterations Proposal for interior alterations for a new office fitout for tenant - 'Generation Capital Limited' in this existing ground floor level office. $1.0M Open
Dec 21, 2023 Building Permit Related(PS) Plumbing - Proposal for interior alteration with minor adjustment of HVAC. — Closed
Nov 21, 2023 Alternative Solution It is proposed to address the interconnected openings not more than 20 m2 between second and third floor levels of the building. In addition, it proposes the use of smoke baffles with closely space sprinklers and smoke detection system to address the floor opening in accordance with NFPA 13-2013, 8. — Closed
Nov 10, 2023 Building Permit Related(MS) REV 01 - Revision for an interior alterationHVAC - Proposal for interior alteration with minor adjustment of HVAC. — Closed
Sep 29, 2023 Alternative Solution The 29-31 Prince Arthur Avenue building will be provided with a standpipe system. In lieu of required fire hose stations, it is proposed to install 65 mm fire hose valve connections within the exit stairs in accordance with the NBC and NFPA 14. Fire hose valve connections will be located such that s — Closed
Aug 23, 2023 Interior Alterations Proposal for interior alteration with minor adjustment of HVAC. $150K Closed

The 40 most recent of 217 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Prince Arthur Ave with a permit on record · 25

  • 8 Prince Arthur Ave5 permits · to 2026
  • 9 Prince Arthur Ave6 permits · to 2003
  • 10 Prince Arthur Ave16 permits · to 2025
  • 11 Prince Arthur Ave3 permits · to 2021
  • 14 Prince Arthur Ave3 permits · to 2023
  • 15 Prince Arthur Ave7 permits · to 2010
  • 17 Prince Arthur Ave24 permits · to 2023
  • 20 Prince Arthur Ave10 permits · to 2022
  • 21 Prince Arthur Ave5 permits · to 2022
  • 25 Prince Arthur Ave1 permit · to 2006
  • 27 Prince Arthur Ave2 permits · to 2013
  • 29 Prince Arthur Ave10 permits · to 2026
  • 31 Prince Arthur Ave1 permit · to 2026
  • 33 Prince Arthur Ave4 permits · to 2009
  • 35 Prince Arthur Ave1 permit · to 2002
  • 36 Prince Arthur Ave9 permits · to 2025
  • 37 Prince Arthur Ave4 permits · to 2017
  • 38 Prince Arthur Ave9 permits · to 2003
  • 39 Prince Arthur Ave5 permits · to 2019
  • 40 Prince Arthur Ave3 permits · to 1998
  • 50 Prince Arthur Ave17 permits · to 2025
  • 55 Prince Arthur Ave55 permits · to 2025
  • 64 Prince Arthur Ave5 permits · to 2025
  • 88 Prince Arthur Ave3 permits · to 2008
  • 95 Prince Arthur Ave9 permits · to 2025
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
217
Data through
2026-10-30
Refresh
Daily from the City
Sheet
STR-561