thepermitmap

Street · 302 of 8,516 by permit count

Building permits on Oxford St

The City of Toronto has 471 building permits on record for Oxford St, going back to 1994. Those permits created 129 homes and removed 20, a net change of +109. Declared construction value totals $26.1M. Half of the 444 permits issued here came through within 57 days of the application. The most recent permit was issued Oct 19, 2026 at 21 Oxford St.

Permits on record
4711994–2026
Declared construction value
$26.1Mas filed, not adjusted
Homes created
129dwelling units
Homes removed
20net +109
Typical wait
57 days30 days slower than the city

Permits issued per year

20002026 (part year)

Zoning

Most common zone
R44.4% of permits · by-law 10.10
In detached-house zones
0.0%38.0% below the city’s 38.0%
Permits with a zone
471of 471 on record
  • Residential437 · 93%
  • Commercial Residential17 · 4%
  • Employment Industrial17 · 4%

The zoning categories the permits on Oxford St fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Minor variances at the Committee of Adjustment

Applications on record
23since 2016
Approved
90.0%0.8% below the city · 20 decided

Some projects on Oxford St need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. How variances work, and the approval rates.

Where this street runs

Mimico-Queensway 245 permits
Kensington-Chinatown 226 permits

Other streets in M5T

Bathurst St5,033 permits
Spadina Ave2,479 permits
Augusta Ave513 permits
Simcoe St497 permits
Mc Caul St429 permits
Baldwin St332 permits
Beverley St253 permits
D'Arcy St214 permits

Looking for one address on Oxford St? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Oct 19, 2026 Building Permit Related(PS) Plumbing - Propose to add a below grade separate entrance in the front yard, and legalize the existing finished basement as additional living space for the existing rooming house. — Open
Oct 19, 2026 Building Permit Related (DR) Drain - Propose to add a below grade separate entrance in the front yard, and legalize the existing finished basement as additional living space for the existing rooming house. — Open
Oct 19, 2026 Interior Alterations Proposed additional dwelling unit within the basement (originally stoarge and laundry rooms). $20K Open
Sep 22, 2026 Building Permit Related(MS) HVAC - Proposal for third floor addition. — Open
Aug 25, 2026 Addition(s) Revision to changes of the exterior wall construction at north and east sides to align with existing exterior was construction.Proposal for third floor addition. — Open
Jun 10, 2026 Building Permit Related(PS) Plumbing - No work is proposed on the third floor.Work on the second floor to consist of the alterations to the access stair and minor demolition of twoclosets. No alteration to the bedroom nor to the existing kitchen.The scope of work proposed falls within the definition of a basic renovation 11.3. — Closed
May 26, 2026 Building Permit Related(MS) HVAC - No work is proposed on the third floor.Work on the second floor to consist of the alterations to the access stair and minor demolition of twoclosets. No alteration to the bedroom nor to the existing kitchen.The scope of work proposed falls within the definition of a basic renovation 11.3.3.1. — Closed
Apr 20, 2026 Multiple Projects REVISION 2 - NEW REAR DECK. MODIFY THIRD FLOOR ROOF.Rev 1:cancelledInterior renovation and underpining of exisitng duplex (2 units). — Open
Mar 19, 2026 Building Permit Related(PS) Plumbing - Proposal for third floor addition. — Closed
Jan 20, 2026 Building Permit Related(MS) HVAC - EXISTING THREE STOREY BUILDING CURRENTLY ZONED AS COMMERCIAL RESIDENTIAL, PROPOSAL INCLUDES INTERIOR ALTERATIONS TO CONVERT THE GROUND FLOOR TO A SMALL RESTAURANT. — Open
Jan 12, 2026 Interior Alterations EXISTING THREE STOREY BUILDING CURRENTLY ZONED AS COMMERCIAL RESIDENTIAL, PROPOSAL INCLUDES INTERIOR ALTERATIONS TO CONVERT THE GROUND FLOOR TO A SMALL RESTAURANT. $120K Open
Jan 12, 2026 Building Permit Related(PS) Plumbing - EXISTING THREE STOREY BUILDING CURRENTLY ZONED AS COMMERCIAL RESIDENTIAL, PROPOSAL INCLUDES INTERIOR ALTERATIONS TO CONVERT THE GROUND FLOOR TO A SMALL RESTAURANT. — Open
Nov 6, 2025 Second Suite (New) Propoposal to construct a second unit on the basement level. $50K Closed
Nov 6, 2025 Building Permit Related (DR) Drain - Propose to demolish old garage and building a new garage with sink — Open
Nov 4, 2025 Multiple Projects Rev 02: Modifications to the existing apartment on floors 2/3. new stair, relocate kitchen. rev 01: Exterior Stair orientation is revised No work is proposed on the third floor.Work on the second floor to consist of the alterations to the access stair and minor demolition of twoclosets. No alteratio — Closed
Nov 3, 2025 Garage Propose to demolish old garage and building a new garage with sink $20K Open
Nov 3, 2025 Building Permit Related(PS) Plumbing - Propose to demolish old garage and building a new garage with sink — Open
Oct 30, 2025 Multiple Projects Miscellaneous typical concrete repairs within the underground garage & waterproofing replacement of plaza deck at three (3) courtyards. $560K Open
Oct 20, 2025 Interior Alterations Rev 01Proposal for interior alterations to convert existing warehouse space to a Central Kitchen - The Pie Commision — Closed
Aug 28, 2025 Multiple Projects REVISION 1 - REVISION TO EXISTING PERMIT# 18 153798 BLD 00 SR FOR 1. PROPOSED DECK 2.ALETRATIONS AT STAIRS TO SECOND FLOOR, 3. FIXED GLASS WINDOWS AT FRONT PORCH,4. ACCESS TO BALCONY AT SECOND FLOOR — Open
Aug 11, 2025 Building Permit Related(MS) Rev 01 - Revised DrawingsHVAC - Proposal for interior alterations to convert existing warehouse space to a Central Kitchen - The Pie Commision — Open
Jul 21, 2025 Multiple Projects Rev 02 - Third floor deck built wider than the approved permit drawings.Revision to relocate the second suite from the basement to the third floor — Closed
Jun 4, 2025 Building Permit Related(PS) REVISION - revised drawingsPlumbing - Proposal for interior alterations to convert existing warehouse space to a Central Kitchen - The Pie Commision — Closed
May 12, 2025 Building Permit Related (DR) Drain - Proposal to construct a new 2 storey laneway suite with basement. — Closed
May 12, 2025 New Laneway / Rear Yard Suite Proposal to construct a new 2 storey laneway suite with basement. $300K Closed
May 12, 2025 Building Permit Related(PS) Plumbing - Proposal to construct a new 2 storey laneway suite with basement. — Closed
May 12, 2025 Interior Alterations Renovation to existing basement dwelling and new walkout $10K Closed
May 7, 2025 Building Permit Related(MS) HVAC - Proposal to demolish the existing 1-storey rear addition & construct a 2-storey rear addition. Basement underpinning. New rear yard deck. [Tied to 24 233321 ZAP 00 ZR & A0941/24TEY.] — Closed
Apr 28, 2025 Building Permit Related(MS) HVAC - Proposed demolition of interior partition walls and finishes only to an existing multiplex. — Closed
Apr 7, 2025 Heat/Ventilation: SFD/Semi/TH Proposal to install a new HVAC system on all floors. $30K Closed
Mar 24, 2025 Building Permit Related(PS) Plumbing - Proposed demolition of interior partition walls and finishes only to an existing multiplex. — Closed
Feb 25, 2025 Building Permit Related (DR) Drain - Proposal for demolishing existing 1 storey addition at rear yard and construct a 2 storey addition at the rear yard and basement underpinning. — Closed
Feb 25, 2025 Multiple Projects Proposal to demolish the existing 1-storey rear addition & construct a 2-storey rear addition. Basement underpinning. New rear yard deck. [Tied to 24 233321 ZAP 00 ZR & A0941/24TEY.] $100K Closed
Feb 25, 2025 Building Permit Related(PS) Plumbing - Proposal for demolishing existing 1 storey addition at rear yard and construct a 2 storey addition at the rear yard and basement underpinning. — Closed
Feb 14, 2025 Building Permit Related (DR) Drain - Interior renovation and underpining of exisitng duplex (2 units). — Closed
Feb 14, 2025 Building Permit Related(PS) Plumbing - Interior renovation and underpining of exisitng duplex (2 units). — Closed
Feb 14, 2025 Party Wall Admin Permits Party wall admin permit for work being done at 72 Oxford st $10K Open
Jan 23, 2025 Party Wall Admin Permits Party wall admin permit for work being done at 72 Oxford st $1K Closed
Jan 23, 2025 Multiple Projects Proposal for interior alterations, basement underpinning and addition of a secondary unit(As built). $100K Closed
Jan 23, 2025 Building Permit Related(PS) Plumbing - Proposal for interior alterations, basement underpinning and addition of a secondary unit(As built). — Closed

The 40 most recent of 471 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Oxford St with a permit on record · 112

  • 8 Oxford St1 permit · to 2001
  • 10 Oxford St1 permit · to 2016
  • 11 Oxford St1 permit · to 2003
  • 12 Oxford St1 permit · to 2014
  • 13 Oxford St3 permits · to 2021
  • 14 Oxford St1 permit · to 2014
  • 16 Oxford St1 permit · to 2021
  • 18 Oxford St9 permits · to 2025
  • 20 Oxford St3 permits · to 2008
  • 21 Oxford St8 permits · to 2026
  • 22 Oxford St4 permits · to 2007
  • 23 Oxford St7 permits · to 2021
  • 26 Oxford St1 permit · to 1998
  • 31 Oxford St7 permits · to 2023
  • 32 Oxford St3 permits · to 2026
  • 33 Oxford St6 permits · to 2021
  • 34 Oxford St14 permits · to 2025
  • 35 Oxford St3 permits · to 2014
  • 37 Oxford St3 permits · to 2019
  • 39 Oxford St1 permit · to 2018
  • 45 Oxford St3 permits · to 2010
  • 47 Oxford St5 permits · to 2010
  • 50 Oxford St2 permits · to 2000
  • 52 Oxford St3 permits · to 2018
  • 53 Oxford St5 permits · to 2021
  • 55 Oxford St12 permits · to 2025
  • 57 Oxford St2 permits · to 2024
  • 58 Oxford St1 permit · to 2011
  • 59 Oxford St2 permits · to 2024
  • 64 Oxford St4 permits · to 2018
  • 67 Oxford St5 permits · to 2015
  • 68 Oxford St9 permits · to 2008
  • 70 Oxford St4 permits · to 2017
  • 71 Oxford St12 permits · to 2026
  • 72 Oxford St9 permits · to 2026
  • 73 Oxford St1 permit · to 2019
  • 74 Oxford St6 permits · to 2025
  • 75 Oxford St1 permit · to 2015
  • 76 Oxford St2 permits · to 2013
  • 83 Oxford St2 permits · to 2010
  • 87 Oxford St3 permits · to 2008
  • 88 Oxford St7 permits · to 2009
  • 91 Oxford St12 permits · to 2018
  • 97 Oxford St2 permits · to 2005
  • 98 Oxford St6 permits · to 2010
  • 99 Oxford St11 permits · to 2022
  • 100 Oxford St3 permits · to 2025
  • 103 Oxford St1 permit · to 2015
  • 112 Oxford St1 permit · to 2025
  • 117 Oxford St4 permits · to 2025
  • 118 Oxford St2 permits · to 2003
  • 119 Oxford St6 permits · to 2022
  • 505 Oxford St1 permit · to 2012
  • 527 Oxford St2 permits · to 2001
  • 529 Oxford St2 permits · to 2021
  • 531 Oxford St1 permit · to 2001
  • 533 Oxford St3 permits · to 2007
  • 535 Oxford St2 permits · to 2001
  • 537 Oxford St1 permit · to 2001
  • 539 Oxford St3 permits · to 2017
  • 541 Oxford St1 permit · to 2001
  • 543 Oxford St1 permit · to 2001
  • 545 Oxford St1 permit · to 2001
  • 547 Oxford St1 permit · to 2001
  • 549 Oxford St1 permit · to 2001
  • 551 Oxford St1 permit · to 2001
  • 553 Oxford St2 permits · to 2024
  • 555 Oxford St1 permit · to 2001
  • 557 Oxford St1 permit · to 2001
  • 559 Oxford St1 permit · to 2001
  • 561 Oxford St1 permit · to 2001
  • 563 Oxford St1 permit · to 2001
  • 565 Oxford St1 permit · to 2001
  • 577 Oxford St10 permits · to 2006
  • 593 Oxford St1 permit · to 2013
  • 595 Oxford St9 permits · to 2016
  • 597 Oxford St2 permits · to 2024
  • 599 Oxford St7 permits · to 2010
  • 613 Oxford St1 permit · to 2023
  • 615 Oxford St1 permit · to 2017
  • 619 Oxford St3 permits · to 2025
  • 621 Oxford St5 permits · to 2018
  • 661 Oxford St7 permits · to 2006
  • 663 Oxford St9 permits · to 2017
  • 671 Oxford St1 permit · to 1994
  • 737 Oxford St2 permits · to 2000
  • 739 Oxford St2 permits · to 2000
  • 749 Oxford St1 permit · to 1996
  • 751 Oxford St4 permits · to 2024
  • 759 Oxford St5 permits · to 2020
  • 761 Oxford St1 permit · to 2018
  • 763 Oxford St2 permits · to 2024
  • 783 Oxford St9 permits · to 2019
  • 787 Oxford St1 permit · to 2007
  • 795 Oxford St4 permits · to 2014
  • 797 Oxford St7 permits · to 2014
  • 819 Oxford St10 permits · to 2008
  • 821 Oxford St9 permits · to 2008
  • 823 Oxford St9 permits · to 2008
  • 825 Oxford St9 permits · to 2008
  • 827 Oxford St10 permits · to 2008
  • 829 Oxford St10 permits · to 2008
  • 831 Oxford St9 permits · to 2008
  • 833 Oxford St10 permits · to 2008
  • 835 Oxford St10 permits · to 2008
  • 837 Oxford St9 permits · to 2008
  • 839 Oxford St10 permits · to 2008
  • 855 Oxford St7 permits · to 2016
  • 901 Oxford St1 permit · to 2002
  • 907 Oxford St1 permit · to 1997
  • 919 Oxford St3 permits · to 2025
  • 923 Oxford St5 permits · to 2018
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
471
Data through
2026-10-19
Refresh
Daily from the City
Sheet
STR-654