Street · 501 of 8,516 by permit count
Building permits on Baldwin St
The City of Toronto has 332 building permits on record for Baldwin St, going back to 1974. Those permits created 34 homes and removed 3, a net change of +31. Declared construction value totals $10.6M. Half of the 302 permits issued here came through within 29 days of the application. The most recent permit was applied for Oct 30, 2026 at 20 Baldwin St.
- Permits on record
- 3321974–2026
- Declared construction value
- $10.6Mas filed, not adjusted
- Homes created
- 34dwelling units
- Homes removed
- 3net +31
- Typical wait
- 29 days2 days slower than the city
Permits issued per year
Zoning
- Most common zone
- CR60.8% of permits · by-law 40.10
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 311of 332 on record
The zoning categories the permits on Baldwin St fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Other streets in M5T
Looking for one address on Baldwin St? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 30, 2026 | Building Permit Related(PS) | Plumbing - Proposal for a rear yard addition, Exhaust & Fire Suppression to the existing ground floor restaurant.Srr also 26 217430 WNP and 26 217555 WNP | — | Open |
| Oct 28, 2026 | Multiple Projects | Proposed interior alterations, 3rd floor addition, and basement walk-out in front yard. | $400K | Open |
| Oct 22, 2026 | Building Permit Related(MS) | HVAC - Proposal for a rear yard addition, Exhaust & Fire Suppression to the existing ground floor restaurant.Srr also 26 217430 WNP and 26 217555 WNP | — | Open |
| Sep 2, 2026 | Interior Alterations | REV 01: first-floor wall partition/layout shift only; no plumbing changes.Proposal for interior alterations, finish basement, and to create a new secondary suite on the second floor. | — | Open |
| Sep 2, 2026 | Multiple Projects | Proposal for a rear yard addition, Exhaust & Fire Suppression to the existing ground floor restaurant.Srr also 26 217430 WNP and 26 217555 WNP | $30K | Open |
| Jul 13, 2026 | Interior Alterations | proposed Interior Alterations | $50K | Open |
| Jul 7, 2026 | Building Permit Related (DR) | Drain - Proposed 2 storey laneway suite with finished basement. | — | Closed |
| Jul 7, 2026 | New Laneway / Rear Yard Suite | Proposed 2 storey laneway suite with finished basement. | $250K | Closed |
| Jul 7, 2026 | Building Permit Related(PS) | Plumbing - Proposed 2 storey laneway suite with finished basement. | — | Closed |
| Jun 25, 2026 | Building Permit Related(MS) | HVAC - Proposal for a new 3 storey triplex. | — | Open |
| Apr 22, 2026 | Building Permit Related(MS) | HVAC - Proposal to convert two storey single family townhouse into three storey, two unit townhouse. Proposal to include front porch and canopy, rear deck, rear balcony, third storey addition, and side addition. | — | Closed |
| Apr 21, 2026 | Multiple Projects | Rev 01: changes to layouts, ceiling height, building height as per as-built conditionsProposal to convert two storey single family townhouse into three storey, two unit townhouse. Proposal to include front porch and canopy, rear deck, rear balcony, third storey addition, and side addition. | — | Closed |
| Mar 30, 2026 | Deck | Proposal to alter the existing flat roof to a deck on the second floor. | $5K | Closed |
| Mar 18, 2026 | Multiple Projects | Proposal for alterations to 3rd floor roof line, proposed second residential unit on second floor, proposed rear fire escape. | $32K | Closed |
| Mar 10, 2026 | Interior Alterations | Proposed interior alterations to multi-unit building. No building expansion is proposed.Additionally, the existing garden suite located in the rear yard will remain as an accessory dwelling unit and is not part of the proposed interior alterations work. | $50K | Open |
| Feb 24, 2026 | New Building | Proposal for a new 3 storey triplex. | $1.5M | New build |
| Dec 19, 2025 | Building Permit Related(MS) | HVAC Revision 01 - Revised ductwork at dining area for site condition.-----------------------------------------------------------------HVAC - Proposal for a new bar and new seating area, washrooms and kitchen. | — | Closed |
| Dec 3, 2025 | Sign Building Permit Related | To permit 3 existing wall signs as per 2025 240081 SNP 00 VI.**LEVY ZAVET** | — | Open |
| Nov 27, 2025 | Building Permit Related (DR) | Drain - Proposal to convert two storey single family townhouse into three storey, two unit townhouse. Proposal to include front porch and canopy, rear deck, rear balcony, third storey addition, and side addition. | — | Closed |
| Nov 27, 2025 | Party Wall Admin Permits | Proposal for Party Wall Admin Permit to 99 Baldwin St (25 229970 BLD 00 SR) | $1K | Closed |
| Nov 27, 2025 | Building Permit Related(PS) | Plumbing - Proposal to convert two storey single family townhouse into three storey, two unit townhouse. Proposal to include front porch and canopy, rear deck, rear balcony, third storey addition, and side addition. | — | Closed |
| Oct 14, 2025 | Sign Building Permit Related | To permit existing 3 wall signs for lawyer business operating at same address as per 2025 230546 000 00 BR.**LEVY ZAVET** | — | Closed |
| Oct 9, 2025 | Change of Use | Proposed interior alterations to second floor office. | $30K | Closed |
| Sep 23, 2025 | Addition(s) | Proposal to build an addition storage room in rear yard. Slab-on-grade. No water, sewer and HVAC required inside. **** REAR EXIT ELIMINATED **** | $80K | Open |
| Aug 15, 2025 | Building Permit Related(MS) | Revision 01 - Relocate the furnace for the 3rd storey from basement utility room to the third floor utility roomHVAC - Proposal to demolish the Existing Detached House and construct a New Detached 3-Storey Single Family Dwelling with a basment walkout | — | Closed |
| Jul 31, 2025 | New Laneway / Rear Yard Suite | Rev 01: revise windows to regular glazing instead of wired glassProposal to construct new 2 storey laneway suite | — | Closed |
| Jul 3, 2025 | Multiple Projects | Remove the existing garage structure and replace it with a two storey ADU (laneway suite) in the same spot/dimensions | $300K | Closed |
| Jul 2, 2025 | Building Permit Related(PS) | Plumbing - Proposal for a new bar and new seating area, washrooms and kitchen. | — | Closed |
| Jul 2, 2025 | Interior Alterations | Proposal for a new bar and new seating area. Existing washrooms and kitchen to remain as is. | $100K | Closed |
| Jun 30, 2025 | Other(BA) | Replacement of front balcony and changing of front facade. | $30K | Open |
| Apr 30, 2025 | Building Permit Related(PS) | Plumbing - Proposal for a new attached triplex | — | Open |
| Apr 2, 2025 | Building Permit Related(MS) | HVAC - Proposal to construct new 2 storey laneway suite | — | Closed |
| Feb 21, 2025 | Demolition | Demolish a two story dwelling. | — | Demolition |
| Jan 8, 2025 | Building Permit Related (DR) | Drain - Proposal for a new detached fourplex | — | Closed |
| Dec 11, 2024 | New Building | REVISION 01: REVISE THE FIRST FLOOR ELEVATION Proposal for a new attached triplex | — | New build |
| Sep 9, 2024 | Party Wall Admin Permits | PROPOSED UNDERPINNING FOR PARTY WALL, KEEP EXISTING PARTY WALL AS COMPLETED AS EXTERIOR WALL FOR 78 BALDWIN ST #24 145840 BLD 00 SR | — | Open |
| Sep 6, 2024 | Fire Damage | REV01: Propposed revision for cladding of the damage portion to vinyl siding and to cancel the cladding alteration on the remaining portion of the building. Interior renovation/exterior repair for fire damage restoration:- REFRAMING REAR PART OF SECOND STORY- REPAIR EXTERIOR CLADDING. CHANGE THE WES | — | Closed |
| Aug 28, 2024 | Demolition | Proposed demolition of the existing semi-detached dwelling | — | Demolition |
| Aug 18, 2024 | Interior Alterations | Proposed conversion of a portion of the existing second-floor residential space to a VIP room for restaurant on the ground floor. | $100K | Closed |
| Aug 6, 2024 | Building Permit Related (DR) | Drain - Proposal to construct new 2 storey laneway suite | — | Closed |
The 40 most recent of 332 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Baldwin St with a permit on record · 92
- 1 Baldwin St7 permits · to 2019
- 2 Baldwin St7 permits · to 2016
- 3 Baldwin St1 permit · to 2011
- 9 Baldwin St9 permits · to 2023
- 11 Baldwin St6 permits · to 2004
- 13 Baldwin St3 permits · to 2019
- 14 Baldwin St3 permits · to 2019
- 16 Baldwin St5 permits · to 2026
- 17 Baldwin St3 permits · to 2026
- 18 Baldwin St1 permit · to 2017
- 19 Baldwin St2 permits · to 2017
- 20 Baldwin St8 permits · to 2026
- 23 Baldwin St4 permits · to 2017
- 24 Baldwin St1 permit · to 2018
- 26 Baldwin St4 permits · to 2004
- 27 Baldwin St9 permits · to 2023
- 29 Baldwin St4 permits · to 2019
- 30 Baldwin St2 permits · to 2021
- 31 Baldwin St9 permits · to 2025
- 33 Baldwin St15 permits · to 2025
- 40 Baldwin St2 permits · to 2010
- 41 Baldwin St11 permits · to 2022
- 42 Baldwin St1 permit · to 2010
- 43 Baldwin St1 permit · to 1974
- 47 Baldwin St4 permits · to 2024
- 49 Baldwin St2 permits · to 2020
- 50 Baldwin St1 permit · to 2015
- 51 Baldwin St4 permits · to 2024
- 64 Baldwin St7 permits · to 2022
- 65 Baldwin St2 permits · to 2014
- 67 Baldwin St1 permit · to 2014
- 69 Baldwin St1 permit · to 2017
- 70 Baldwin St2 permits · to 2001
- 73 Baldwin St1 permit · to 2009
- 74 Baldwin St3 permits · to 2012
- 75 Baldwin St5 permits · to 2022
- 76 Baldwin St5 permits · to 2024
- 77 Baldwin St1 permit · to 2026
- 78 Baldwin St10 permits · to 2026
- 80 Baldwin St2 permits · to 2017
- 84 Baldwin St3 permits · to 2012
- 85 Baldwin St1 permit · to 2016
- 87 Baldwin St7 permits · to 2013
- 89 Baldwin St2 permits · to 2026
- 91 Baldwin St3 permits · to 2011
- 93 Baldwin St1 permit · to 2010
- 95 Baldwin St4 permits · to 2014
- 97 Baldwin St3 permits · to 2015
- 98 Baldwin St2 permits · to 2006
- 99 Baldwin St4 permits · to 2026
- 101 Baldwin St2 permits · to 2025
- 103 Baldwin St3 permits · to 2026
- 104 Baldwin St3 permits · to 2010
- 107 Baldwin St1 permit · to 2025
- 109 Baldwin St3 permits · to 2015
- 114 Baldwin St1 permit · to 2025
- 118 Baldwin St4 permits · to 2011
- 119 Baldwin St10 permits · to 2026
- 122 Baldwin St3 permits · to 2026
- 124 Baldwin St5 permits · to 2001
- 126 Baldwin St1 permit · to 2011
- 127 Baldwin St1 permit · to 2012
- 128 Baldwin St3 permits · to 2011
- 129 Baldwin St4 permits · to 2016
- 130 Baldwin St2 permits · to 2022
- 131 Baldwin St1 permit · to 2016
- 147 Baldwin St6 permits · to 2014
- 149 Baldwin St2 permits · to 2001
- 160 Baldwin St6 permits · to 2017
- 168 Baldwin St2 permits · to 2022
- 170 Baldwin St2 permits · to 2018
- 172 Baldwin St3 permits · to 2019
- 176 Baldwin St2 permits · to 2016
- 177 Baldwin St2 permits · to 2022
- 179 Baldwin St1 permit · to 2016
- 180 Baldwin St2 permits · to 2010
- 181 Baldwin St6 permits · to 2017
- 182 Baldwin St1 permit · to 2010
- 184 Baldwin St1 permit · to 2010
- 185 Baldwin St6 permits · to 2025
- 186 Baldwin St1 permit · to 1998
- 187 Baldwin St1 permit · to 2017
- 188 Baldwin St2 permits · to 1995
- 189 Baldwin St6 permits · to 2019
- 191 Baldwin St12 permits · to 2025
- 192 Baldwin St1 permit · to 2008
- 193 Baldwin St10 permits · to 2021
- 194 Baldwin St3 permits · to 2008
- 195 Baldwin St2 permits · to 2013
- 198 Baldwin St1 permit · to 2012
- 199 Baldwin St3 permits · to 2020
- 206 Baldwin St2 permits · to 2017