Street · 5346 of 8,567 by permit count
Building permits on North Wind Pl
The City of Toronto has 21 building permits on record for North Wind Pl, going back to 2003. Declared construction value totals $1.9M. The most recent permit was issued Sep 20, 2023 at 60 North Wind Pl.
- Permits on record
- 212003–2023
- Declared construction value
- $1.9Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
Permits issued per year
20032023 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 20, 2023 | Multiple Projects | Proposal to construct a mezzanine floor and interior alterations to an existing warehouse and office. | $300K | Open |
| Sep 20, 2023 | Building Permit Related(MS) | HVAC - Proposal to construct a mezzanine floor and interior alterations to an existing warehouse and office. | — | Open |
| Aug 5, 2022 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposal to construct a mezzanine floor and interior alterations to an existing warehouse and office. | — | Open |
| Apr 6, 2022 | Building Permit Related(MS) | HVAC - One storey pre-engineered addition onto the side of the existing warehouse building - YDM Metal Inc | — | Closed |
| Apr 6, 2022 | Addition(s) | One storey pre-engineered addition onto the side of the existing warehouse building - YDM Metal Inc | $500K | Closed |
| Jan 14, 2021 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - One storey pre-engineered addition onto the side of the existing warehouse building - YDM Metal Inc | — | Closed |
| May 31, 2019 | Building Permit Related(PS) | Plumbing - Proposed addition on ground floor and new second floor to create new office spaces, interior alterations on ground floor to convert existing office spaces into warehouse space, to existing one storey warehouse building. | — | Closed |
| May 31, 2019 | Building Permit Related(MS) | HVAC - Proposed addition on ground floor and new second floor to create new office spaces, interior alterations on ground floor to convert existing office spaces into warehouse space, to existing one storey warehouse building. | — | Closed |
| May 31, 2019 | Multiple Projects | Proposed addition on ground floor and new second floor to create new office spaces, interior alterations on ground floor to convert existing office spaces into warehouse space, to existing one storey warehouse building. | $600K | Closed |
| Aug 31, 2018 | Retaining Wall | Proposal to build additional parking area and retaining walls at the west side of the existing warehouse. | $40K | Open |
| Jun 30, 2016 | Backflow Prevention Devices (Water only) | To install a backflow preventer | $2K | Closed |
| Sep 16, 2014 | Building Permit Related(MS) | HVAC - interior alterations to office area of warehouse - new partition wall, relocate diffusers | — | Closed |
| Sep 16, 2014 | Interior Alterations | interior alterations to office area of warehouse - new partition wall, relocate diffusers. GOLD STAR | $200K | Closed |
| Mar 1, 2012 | Solar Collector | Rooftop solar panels for electricity | $50K | Closed |
| Mar 1, 2012 | Solar Collector | Solar roof panels for electricity | $50K | Closed |
| Apr 14, 2010 | Backflow Prevention Devices (Water only) | To install one (1) backflow prevention device | $6K | Closed |
| Oct 14, 2009 | Backflow Prevention Devices (Water only) | Install one backflow preventor | $7K | Open |
| Oct 31, 2007 | Interior Alterations | interior alteration | $150K | Closed |
| Jun 16, 2003 | Electromagnetic Locks | 8 MAGLOCKS ON GROUND FLOOR FOR WAREHOUSE AND OFFICES | $8K | Closed |
| May 26, 2003 | Interior Alterations | INSTALL NEW METAL CAGE/FENCE | $20K | Closed |
| Feb 27, 2003 | Other(BA) | CHANGE TO 1 DOOR OPENING, ADDITION OF TWO DOORS | $5K | Closed |
The 21 most recent of 21 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.