Street · 98 of 8,516 by permit count
Building permits on Milner Ave, Scarborough
The City of Toronto has 1,132 building permits on record for Milner Ave in Scarborough, going back to 1997. Those permits created 2 homes and removed 0, a net change of +2. Declared construction value totals $149.5M. Half of the 1,039 permits issued here came through within 34 days of the application. The most recent permit was issued Oct 27, 2026 at 875 Milner Ave.
- Permits on record
- 1,1321997–2026
- Declared construction value
- $149.5Mas filed, not adjusted
- Homes created
- 2dwelling units
- Homes removed
- 0net +2
- Typical wait
- 34 days7 days slower than the city
Permits issued per year
Zoning
- Most common zone
- E100.0% of permits · by-law 60.20
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 258of 1,132 on record
The zoning categories the permits on Milner Ave fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Minor variances at the Committee of Adjustment
- Applications on record
- 24since 2016
- Approved
- 95.0%4.2% above the city · 20 decided
- Median time to a decision
- 127 days7 days slower than the city
Some projects on Milner Ave need the Committee of Adjustment to approve a minor variance from the zoning by-law before a building permit can be applied for at all. Where that applies, the committee’s clock runs first and the permit wait above starts only once it has stopped. Back to back, that is about 161 days, not the 34 days the permit figure alone suggests. How variances work, and the approval rates.
Most common work
Structures worked on
Postal areas
Where this street runs
Other streets in M1B
Looking for one address on Milner Ave? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 27, 2026 | Building Permit Related(MS) | HVAC - Proposed interior alterations for fit-out for canadian blood services donor centre. | — | Open |
| Oct 26, 2026 | Interior Alterations | Interior alterations to add a walkin cooler and freezer with hvac and plumbing to existing warehouse/office. | $60K | Open |
| Oct 23, 2026 | Building Permit Related(PS) | Plumbing - Interior alterations to add a walkin cooler and freezer with hvac and plumbing to existing warehouse/office. | — | Open |
| Oct 23, 2026 | Building Permit Related(MS) | HVAC - Interior alterations to add a walkin cooler and freezer with hvac and plumbing to existing warehouse/office. | — | Open |
| Oct 22, 2026 | Electromagnetic Locks | Install 1 electromagnetic locking devices for one single door, including all life safety requirements. | $10K | Open |
| Oct 15, 2026 | Multiple Projects | Proposed sprinkler system upgrade and relocation of exit door. | $500K | Open |
| Oct 13, 2026 | Interior Alterations | Revision 01 - Interior alteration to construct an open mezzanine for storage. No change in building footprint. Proposed interior alterations within an existing vacant retail unit (Spiritleaf Cannabis, Group E occupancy), consisting of renovation of a portion of the unit for a vape retail use, and mo | — | Open |
| Sep 30, 2026 | Other(BA) | Proposed outdoor patio at existing restaurant | $15K | Open |
| Sep 24, 2026 | Building Permit Related(PS) | Plumbing - Proposed interior alterations for fit-out for canadian blood services donor centre. | — | Open |
| Sep 21, 2026 | Interior Alterations | Proposed interior alterations for fit-out for canadian blood services donor centre. | $1.8M | Open |
| Sep 18, 2026 | Inside and Outside Drains | Drain - Proposal to convert warehouse into a new data center and to install 2 new emergency generators on site to support new Data Center. | — | Open |
| Sep 8, 2026 | Building Permit Related(MS) | HVAC - Building additions and alterations to an existing retail automotive dealership - East Court Ford Lincoln dealership | — | Open |
| Sep 8, 2026 | Building Permit Related(PS) | Plumbing - Building additions and alterations to an existing retail automotive dealership - East Court Ford Lincoln dealership | — | Open |
| Sep 8, 2026 | Multiple Projects | Building additions and alterations to an existing retail automotive dealership - East Court Ford Lincoln dealership | $5.0M | Open |
| Sep 1, 2026 | Building Permit Related(MS) | HVAC - Proposed interior alterations for nail salon - unit # 2. Scope of work includes partition walls, appliances and equipment, sinks, finish floor, walls , and ceiling. | — | Open |
| Sep 1, 2026 | Building Permit Related(PS) | Plumbing - Proposed interior alterations for nail salon - unit # 2. Scope of work includes partition walls, appliances and equipment, sinks, finish floor, walls , and ceiling. | — | Open |
| Sep 1, 2026 | Interior Alterations | Proposed interior alterations for nail salon - unit # 2. Scope of work includes partition walls, appliances and equipment, sinks, finish floor, walls , and ceiling. | $50K | Open |
| Aug 31, 2026 | Building Permit Related(MS) | Revision 01 - Interior alteration to construct an open mezzanine for storage. No change in building footprint. HVAC - Proposed interior alterations for spiritleaf cannabis store by adding vape area inside the existing unit and changing front facade of unit by adding 2 entry doors with a glass window | — | Open |
| Aug 27, 2026 | Sign Building Permit Related | Single sided third party ground sign | — | Open |
| Aug 25, 2026 | Interior Alterations | REV 01: Proposed to include Structural scope and drawings in permit 26 137331Element Event Solutions New Facility - interior alteration and exterior scope, including concrete for prefabricated loading ramp, enlarging existing loading dock door, security fencing and an exterior cage. | — | Open |
| Aug 21, 2026 | Interior Alterations | Revision 01: Revised drawings. Warehouse fit-out for new manufacturing equipment, including water, HVAC and power. Egress aisles to suit the manufacturing layout. | — | Open |
| Aug 5, 2026 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Inclusion of Sprinkler design to permit 26 137331 BLDElement Event Solutions New Facility - Fit-out. | — | Closed |
| Jul 28, 2026 | Other(FS) | Proposal to rework existing wet sprinkler system in scope of work area, supply & installation of pre-action system and supply & installation of clean agent in Data centre. | — | Open |
| Jul 24, 2026 | Interior Alterations | Installation of a 2 level commercial passenger elevator. | $100K | Open |
| Jul 23, 2026 | Interior Alterations | Revision 1: Northern wall to have fire rating removed, and required areas needing additional fire rating to be altered to suite.Proposal to convert warehouse into a new data center and to install 2 new emergency generators on site to support new Data Center. | — | Open |
| Jul 17, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations include new privacy room, new interview room, Power for jewelry and BAF in stockroom. | — | Open |
| Jul 17, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations include new privacy room, new interview room, Power for jewelry and BAF in stockroom. | — | Open |
| Jul 17, 2026 | Interior Alterations | Proposal for interior alterations include new privacy room, new interview room, Power for jewelry and BAF in stockroom. | $1.1M | Open |
| Jul 14, 2026 | Building Permit Related(MS) | HVAC - PROPOSAL FOR ADDING INTERIOR PARTITIONS TO THE OFFICE AND 2 COOLERS & 1 FREEZER. | — | Open |
| Jul 14, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to an existing single-tenant floor, including the construction of offices, meeting rooms and washrooms, with associated electrical, mechanical and life safety modifications, and structural reinforcement for movable partitions and rooftop condenser units | — | Open |
| Jul 14, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to an existing single-tenant floor, including the construction of offices, meeting rooms and washrooms, with associated electrical, mechanical and life safety modifications, and structural reinforcement for movable partitions and rooftop condenser units | — | Open |
| Jul 14, 2026 | Interior Alterations | PROPOSAL FOR ADDING INTERIOR PARTITIONS TO THE OFFICE AND 2 COOLERS & 1 FREEZER. | $100K | Open |
| Jul 14, 2026 | Building Permit Related(PS) | Plumbing - PROPOSAL FOR ADDING INTERIOR PARTITIONS TO THE OFFICE AND 2 COOLERS & 1 FREEZER. | — | Open |
| Jul 14, 2026 | Interior Alterations | Proposal for interior alterations to an existing single-tenant floor, including the construction of offices, meeting rooms and washrooms, with associated electrical, mechanical and life safety modifications, and structural reinforcement for movable partitions and rooftop condenser units | $100K | Open |
| Jun 29, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alteration. | — | Open |
| Jun 29, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alteration. | — | Open |
| Jun 24, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to existing warehouse to add a walkin freezer | — | Closed |
| Jun 24, 2026 | Interior Alterations | Proposal for interior alterations to existing warehouse to add a walk-in freezer, and roof top mechanical equipment w structural reinforcement | $50K | Closed |
| Jun 23, 2026 | Sprinklers | Proposal for supply and install up to two (2) pendent sprinklers. | $10K | Closed |
| Jun 15, 2026 | Other(BA) | Proposal to install stand-alone steel storage pallet racks inside the warehouse. Unit 1. | $599K | Closed |
The 40 most recent of 1,132 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Milner Ave with a permit on record · 91
- 0 Milner Ave1 permit · to 2017
- 8 Milner Ave2 permits · to 2022
- 10 Milner Ave3 permits · to 2018
- 12 Milner Ave1 permit · to 2016
- 41 Milner Ave41 permits · to 2024
- 43 Milner Ave6 permits · to 2025
- 44 Milner Ave8 permits · to 2017
- 45 Milner Ave5 permits · to 2018
- 47 Milner Ave3 permits · to 2026
- 48 Milner Ave3 permits · to 2025
- 55 Milner Ave3 permits · to 2009
- 56 Milner Ave3 permits · to 2009
- 57 Milner Ave3 permits · to 2009
- 58 Milner Ave3 permits · to 2009
- 59 Milner Ave3 permits · to 2009
- 70 Milner Ave3 permits · to 2026
- 75 Milner Ave13 permits · to 2025
- 101 Milner Ave8 permits · to 2015
- 110 Milner Ave2 permits · to 2026
- 115 Milner Ave20 permits · to 2026
- 120 Milner Ave1 permit · to 2016
- 124 Milner Ave13 permits · to 2024
- 125 Milner Ave22 permits · to 2024
- 126 Milner Ave12 permits · to 2024
- 128 Milner Ave3 permits · to 2011
- 130 Milner Ave1 permit · to 2016
- 135 Milner Ave11 permits · to 2026
- 140 Milner Ave1 permit · to 2011
- 141 Milner Ave1 permit · to 2011
- 142 Milner Ave1 permit · to 2011
- 143 Milner Ave1 permit · to 2011
- 144 Milner Ave1 permit · to 2011
- 145 Milner Ave6 permits · to 2015
- 146 Milner Ave1 permit · to 2011
- 147 Milner Ave1 permit · to 2011
- 148 Milner Ave1 permit · to 2011
- 149 Milner Ave1 permit · to 2011
- 150 Milner Ave1 permit · to 2011
- 165 Milner Ave40 permits · to 2026
- 172 Milner Ave7 permits · to 2026
- 185 Milner Ave1 permit · to 2000
- 189 Milner Ave8 permits · to 2023
- 190 Milner Ave8 permits · to 2019
- 210 Milner Ave1 permit · to 2008
- 211 Milner Ave1 permit · to 2008
- 212 Milner Ave1 permit · to 2008
- 213 Milner Ave1 permit · to 2008
- 214 Milner Ave1 permit · to 2008
- 215 Milner Ave1 permit · to 2008
- 216 Milner Ave1 permit · to 2008
- 217 Milner Ave1 permit · to 2008
- 218 Milner Ave1 permit · to 2008
- 219 Milner Ave1 permit · to 2008
- 220 Milner Ave2 permits · to 2008
- 221 Milner Ave18 permits · to 2025
- 242 Milner Ave3 permits · to 2015
- 305 Milner Ave228 permits · to 2026
- 325 Milner Ave115 permits · to 2026
- 415 Milner Ave2 permits · to 2017
- 419 Milner Ave9 permits · to 2013
- 445 Milner Ave25 permits · to 2026
- 455 Milner Ave14 permits · to 2024
- 465 Milner Ave9 permits · to 2026
- 515 Milner Ave4 permits · to 2016
- 525 Milner Ave5 permits · to 2015
- 601 Milner Ave52 permits · to 2026
- 603 Milner Ave4 permits · to 2014
- 607 Milner Ave3 permits · to 2002
- 657 Milner Ave10 permits · to 2025
- 709 Milner Ave11 permits · to 2026
- 715 Milner Ave66 permits · to 2026
- 785 Milner Ave145 permits · to 2025
- 787 Milner Ave1 permit · to 2020
- 797 Milner Ave3 permits · to 2006
- 799 Milner Ave6 permits · to 2025
- 801 Milner Ave9 permits · to 2023
- 825 Milner Ave9 permits · to 2026
- 850 Milner Ave14 permits · to 2023
- 851 Milner Ave9 permits · to 2026
- 853 Milner Ave51 permits · to 2026
- 859 Milner Ave10 permits · to 2015
- 863 Milner Ave7 permits · to 2023
- 866 Milner Ave1 permit · to 2017
- 870 Milner Ave1 permit · to 2016
- 875 Milner Ave16 permits · to 2026
- 880 Milner Ave5 permits · to 2025
- 885 Milner Ave2 permits · to 2019
- 895 Milner Ave21 permits · to 2025
- 898 Milner Ave5 permits · to 2011
- 951 Milner Ave2 permits · to 2013
- 958 Milner Ave4 permits · to 2026