Street · 507 of 8,516 by permit count
Building permits on Mill Rd, Etobicoke
The City of Toronto has 329 building permits on record for Mill Rd in Etobicoke, going back to 1995. Those permits created 354 homes and removed 0, a net change of +354. Declared construction value totals $168.1M. Half of the 316 permits issued here came through within 43 days of the application. The most recent permit was issued Sep 25, 2026 at 236 Mill Rd.
- Permits on record
- 3291995–2026
- Declared construction value
- $168.1Mas filed, not adjusted
- Homes created
- 354dwelling units
- Homes removed
- 0net +354
- Typical wait
- 43 days16 days slower than the city
Permits issued per year
Zoning
- Most common zone
- RA71.6% of permits · by-law 15.10
- In detached-house zones
- 27.7%10.3% below the city’s 38.0%
- Permits with a zone
- 296of 329 on record
The zoning categories the permits on Mill Rd fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Where this street runs
Other streets in M9C
Looking for one address on Mill Rd? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 25, 2026 | Back Water Valve (Sewer only) | Exterior Backwater Valve | — | Closed |
| Aug 4, 2026 | Interior Alterations | Proposed structural water damage restoration | $50K | Open |
| Jul 21, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to interior corridors with new Barrier free ramps in certain locations, as well as cafeteria and at auditorium stage. New elevator and new barrier free washroom. New exterior curb cut and sidewalk depression with sloped concrete sidewalk to front entrance | — | Open |
| Jul 21, 2026 | Interior Alterations | Proposal for interior alterations to interior corridors with new Barrier free ramps in certain locations, as well as cafeteria and at auditorium stage. New elevator and new barrier free washroom. New exterior curb cut and sidewalk depression with sloped concrete sidewalk to front entrance vestibule. | $1.6M | Open |
| Jun 29, 2026 | Fire Alarm | Proposed replacement of the building's Fire Alarm Control Panel | $95K | Open |
| Jun 24, 2026 | Garage Repair/Reconstruction | Proposal for parking garage rehabilitation | $2.4M | Open |
| Apr 21, 2026 | Addition(s) | Proposal to enclose existing rear concrete patio. | — | Open |
| Feb 4, 2026 | Other(BA) | Lumon Retractable Glazing System in existing balcony. Unit 304 | $16K | Closed |
| Aug 25, 2025 | Balcony/Guard Repairs | Proposal for localized balcony repairs including new waterproofing and guards | $380K | Open |
| Jul 21, 2025 | Addition(s) | Proposed roof over existing concrete patio at rear | $15K | Closed |
| Jun 25, 2025 | Partial Permit - Structural Framing | Conditional Permit - Part Permit - Proposal to construct a 19 storey infill rental apartment building with 4 levels of underground parking. (building B) | — | Closed |
| Jun 25, 2025 | Building Permit Related(MS) | HVAC - Proposal to construct a 19 storey infill rental apartment building with 4 levels of underground parking. | — | Open |
| Jun 25, 2025 | Building Permit Related(PS) | Plumbing - Proposal to construct a 19 storey infill rental apartment building with 4 levels of underground parking. | — | Open |
| May 2, 2025 | Piping: Other Buildings | Proposak for domestic cold and hot water riser replacement. | $100K | Open |
| Mar 20, 2025 | Multiple Projects | Rev. 02 - Eliminate the originally proposed renovation to basement bath & laundry room - existing to remain as-is. Rear mudroom addition and interior renovations, including removal of load-bearing wall to create open concept living space. | — | Open |
| Mar 7, 2025 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to convert 2 bedroom unit to 1 bedroom unit and alteration in kitchen and bathroom | — | Open |
| Mar 7, 2025 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to convert 2 bedroom unit to 1 bedroom unit and alteration in kitchen and bathroom | — | Open |
| Mar 7, 2025 | Interior Alterations | Proposal for interior alterations to convert 2 bedroom unit to 1 bedroom unit and alteration in kitchen and bathroom | $120K | Open |
| Mar 4, 2025 | Building Permit Related(PS) | Plumbing - One storey rear addition plus basement, front covered porch | — | Closed |
| Jan 27, 2025 | Multiple Projects | Proposal to remove the roof and front porch to construct a new addition with second floor overhang | $300K | Closed |
| Jan 27, 2025 | Building Permit Related(MS) | HVAC - Proposal to remove the roof and front porch to construct a new addition with second floor overhang | — | Closed |
| Dec 20, 2024 | Building Permit Related(PS) | Plumbing - Rear mudroom addition and interior renovations, including removal of load-bearing wall to create open concept living space. | — | Open |
| Dec 18, 2024 | Building Permit Related(MS) | HVAC - One storey rear addition plus basement, front covered porch | — | Closed |
| Dec 18, 2024 | Partial Permit - Foundation | Conditional Permit - Part Permit - Proposal to construct a 19 storey infill rental apartment building with 4 levels of underground parking. (building B) | — | Closed |
| Dec 18, 2024 | Building Permit Related (DR) | Drain - Proposal to construct a 19 storey infill rental apartment building with 4 levels of underground parking. | — | Open |
| Nov 26, 2024 | Multiple Projects | One storey rear addition plus basement, front covered porch | $100K | Closed |
| Nov 25, 2024 | Building Permit Related(MS) | HVAC - Interior renovation - Sewing/Photography Classroom 135 - new finishes including ATC ceiling and VCT flooring, new lighting, new partition walls below mezzanine and new plumbing for laundry room. Renovation of Family studies classroom 203 - relocation of existing workstation, alteration of plu | — | Open |
| Nov 25, 2024 | Building Permit Related(PS) | Plumbing - Interior renovation - Sewing/Photography Classroom 135 - new finishes including ATC ceiling and VCT flooring, new lighting, new partition walls below mezzanine and new plumbing for laundry room. Renovation of Family studies classroom 203 - relocation of existing workstation, alteration of | — | Open |
| Nov 20, 2024 | Interior Alterations | Interior renovation - Sewing/Photography Classroom 135 - new finishes including ATC ceiling and VCT flooring, new lighting, new partition walls below mezzanine and new plumbing for laundry room. Renovation of Family studies classroom 203 - relocation of existing workstation, alteration of plumbing, | $1.3M | Open |
| Nov 14, 2024 | Alternative Solution | Proposed alternative Solution for Single-Stage Fire Alarm System | — | Closed |
| Jul 11, 2024 | Back Water Valve (Sewer only) | Backwater valve installation. | — | Closed |
| Jul 10, 2024 | Other(SR) | Residential Rooftop Solar PV | $20K | Closed |
| Jun 20, 2024 | Building Permit Related(MS) | REVISION - ducting on the first floor was removed and the second floor unit was changed to include the entirety of the second floorHVAC - Proposal to construct a new front porch roof, interior alterations, two storey rear addition with platform deck and a 1 storey addition over existing garage. | — | Closed |
| May 24, 2024 | Garage Repair/Reconstruction | Proposed parking garage ramp repair and guard replacement to existing apartment building. | $331K | Closed |
| Apr 29, 2024 | Piping: Other Buildings | Proposed replacement of in-suite Kitec domestic water piping on floors 1-9, lower, middile and upper penthouse in an existing apartment building. UNIT 1202 | $120K | Closed |
| Apr 29, 2024 | Piping: Other Buildings | Proposed replacement of in-suite Kitec domestic water piping on floors 1-9, lower, middile and upper penthouse in an existing apartment building this is the superintendent's suite for Toronto Standard Condominium Corporation No. 1493. UNIT 111 | $120K | Closed |
| Apr 26, 2024 | Site Service | Replacement of private buried firewater and domestic water mains. | $1.5M | Open |
| Apr 8, 2024 | Partial Permit - Shoring | Conditional Permit - Part Permit - Proposal to construct a 19 storey infill rental apartment building with 4 levels of underground parking. | — | Closed |
| Feb 23, 2024 | Back Water Valve (Sewer only) | Proposal for backwater valve installation | — | Closed |
| Jan 29, 2024 | Piping: Other Buildings | Proposed replacement of in-suite Kitec domestic water piping on floors 1-9, lower, middile and upper penthouse in an existing apartment building. UNIT 1206 | $120K | Closed |
The 40 most recent of 329 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Mill Rd with a permit on record · 53
- 71 Mill Rd3 permits · to 2018
- 75 Mill Rd2 permits · to 2023
- 76 Mill Rd4 permits · to 2013
- 77 Mill Rd2 permits · to 2019
- 78 Mill Rd4 permits · to 2024
- 83 Mill Rd2 permits · to 2000
- 87 Mill Rd1 permit · to 2020
- 88 Mill Rd2 permits · to 2013
- 90 Mill Rd1 permit · to 2013
- 91 Mill Rd2 permits · to 2021
- 92 Mill Rd5 permits · to 2024
- 93 Mill Rd1 permit · to 2009
- 96 Mill Rd4 permits · to 2009
- 98 Mill Rd1 permit · to 2018
- 100 Mill Rd4 permits · to 2025
- 101 Mill Rd1 permit · to 2014
- 102 Mill Rd2 permits · to 2009
- 106 Mill Rd1 permit · to 2015
- 107 Mill Rd1 permit · to 2019
- 109 Mill Rd1 permit · to 2019
- 112 Mill Rd1 permit · to 2005
- 117 Mill Rd3 permits · to 2010
- 195 Mill Rd2 permits · to 2018
- 199 Mill Rd3 permits · to 2013
- 201 Mill Rd1 permit · to 2014
- 207 Mill Rd1 permit · to 2014
- 222 Mill Rd11 permits · to 2023
- 229 Mill Rd3 permits · to 2013
- 231 Mill Rd1 permit · to 2013
- 236 Mill Rd1 permit · to 2026
- 242 Mill Rd1 permit · to 2013
- 245 Mill Rd4 permits · to 2023
- 247 Mill Rd2 permits · to 2026
- 253 Mill Rd1 permit · to 1998
- 254 Mill Rd2 permits · to 2024
- 256 Mill Rd2 permits · to 2025
- 260 Mill Rd3 permits · to 2025
- 261 Mill Rd3 permits · to 2021
- 263 Mill Rd4 permits · to 2014
- 284 Mill Rd18 permits · to 2025
- 288 Mill Rd12 permits · to 2022
- 291 Mill Rd11 permits · to 2026
- 296 Mill Rd3 permits · to 2022
- 299 Mill Rd10 permits · to 2026
- 300 Mill Rd5 permits · to 2022
- 303 Mill Rd3 permits · to 2020
- 330 Mill Rd2 permits · to 2023
- 335 Mill Rd7 permits · to 2025
- 340 Mill Rd25 permits · to 2026
- 350 Mill Rd110 permits · to 2024
- 411 Mill Rd11 permits · to 2023
- 415 Mill Rd2 permits · to 2009
- 420 Mill Rd17 permits · to 2026