Street · 1753 of 8,565 by permit count
Building permits on High Point Rd
The City of Toronto has 111 building permits on record for High Point Rd, going back to 1985. Those permits created 2 homes and removed 5, a net change of -3. Declared construction value totals $15.9M. The most recent permit was issued Sep 9, 2025 at 36 High Point Rd.
- Permits on record
- 1111985–2025
- Declared construction value
- $15.9Mas filed, not adjusted
- Homes created
- 2dwelling units
- Homes removed
- 5net -3
Permits issued per year
20002025 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 9, 2025 | New Building | Revision #2 - framing revision Revision - Some changes to the interior, to windows, doors and skylights.Proposal to construct a new 2-storey single family dwelling | — | New build |
| Jan 27, 2025 | Building Permit Related(MS) | HVAC - Proposal to construct a new 2-storey single family dwelling | — | Open |
| Jan 16, 2025 | Multiple Projects | REV 02 - to replace ceiling batt insulation with spray foamREV 01 - Revision to interior layout and windowsInterior Alteration and sunroom in the rear | — | Open |
| Jan 13, 2025 | Building Permit Related(MS) | REV 01 - to replace ceiling batt insulation with spray foamHVAC - Interior Alteration and sunroom in the rear | — | Open |
| Oct 3, 2024 | Building Permit Related (DR) | Drain - Proposal to construct a new 2-storey single family dwelling | — | Closed |
| Oct 3, 2024 | Demolition | Proposal to demolish the existing dwelling | — | Demolition |
| Oct 3, 2024 | Building Permit Related(PS) | Plumbing - Proposal to construct a new 2-storey single family dwelling | — | Open |
| Jul 22, 2024 | Alternative Solution | Alternative Solution to demonstrate that an egress strategy for the second floor level occupants of house 1 and house 3 will achieve a level of equivalency with the OBC subsection 9.9.9. by satisfying the associated objectives and functional statements.The functional and objective statements relativ | — | Closed |
| Jul 22, 2024 | Alternative Solution | Alternative Solution to demonstrate that an egress strategy for the second floor level occupants of house 1 and house 3 will achieve a level of equivalency with the OBC subsection 9.9.9. by satisfying the associated objectives and functional statements.The functional and objective statements relativ | — | Closed |
| Jan 29, 2024 | Building Permit Related(PS) | Plumbing - Interior Alteration and sunroom in the rear | — | Open |
| Dec 13, 2023 | Multiple Projects | Interior alteration and sunroom in the rear | $500K | Closed |
| Dec 13, 2023 | Building Permit Related(PS) | Plumbing - Interior alterations to the existing ground floor | — | Closed |
| May 13, 2021 | Accessory Building(s) | Revision 01- Removed existing sink from island. Detached accessory structure, cabana, with HVAC and plumbing, at rear of dwelling | — | Open |
| Jan 20, 2021 | Other(SR) | Proposal to construct a below grade addition for a golf simulation room in an existing SFD-detached dwelling. | $50K | Open |
| Apr 21, 2020 | New Building | REVISION # 3TO ORIGINAL PERMIT NO. 16 183323 BLD 00 NH. Honeywell fire system VISTA 250 in leiu of 120 volt standard smoke alarms. Battery backup in the main panel. System monitored by security company. Smoke & CO2 detectors horns & horn/strobes, heat & natural gas detectors per drawings. Keypads lo | — | New build |
| Dec 16, 2019 | Sprinklers | Revision 01: Changes to the sprinkler layout on the ground and second floors - refer to bubbled areas.Sprinklers in connection with Building Permit file 16-183323 BLD 00 NH and Alternative Solution file 16-162069 ALT 00 AS | — | Closed |
| Jun 4, 2019 | Pool Fence Enclosure | Proposal to install a Pool Fence Enclosure in the rear yard of the existing single family dwelling. | $5K | Closed |
| Feb 25, 2019 | Porch | Construct new front porch and balcony | $30K | Open |
| Nov 1, 2018 | Building Permit Related(MS) | HVAC - Interior alterations to basement including new basement walkout | — | Open |
| Oct 23, 2018 | Multiple Projects | Interior alterations to basement including new basement walkout | $85K | Open |
| Oct 23, 2018 | Building Permit Related(PS) | Plumbing - Interior alterations to basement including new basement walkout | — | Open |
| Oct 10, 2018 | Building Permit Related(MS) | Revision # 01 - All duct work, supply air grilles, return air grilles have changed. Equipment remains the same.HVAC - Construct a new 3 storey single family house (1957.5m2), finished basement (746.86m2) with attached garage and attached cabana | — | Closed |
| Aug 14, 2018 | Other Temporary Tents | Installation of two temporary tents on property each measuring 421.04 m2 installed on or about wednesday august 15 and removed on or about sunday august 19 / monday august 20, 2018. | — | Closed |
| Jan 3, 2018 | Other(SR) | Selective replacement and rehabilitation of existing indoor pool roof structure, (joists and decking)envelope upgrades, re-roofing, skylights and clerestorey | $800K | Open |
| Feb 23, 2017 | Building Permit Related(MS) | HVAC - Interior alterations to the existing 3 storey dwelling. Partial alteration/renovation of the basement, minor alterations to the ground, second (new laundry room) and third floors | — | Closed |
| Feb 21, 2017 | Building Permit Related (DR) | Drain - Interior alterations to the existing 3 storey dwelling. Partial alteration/renovation of the basement, minor alterations to the ground, second (new laundry room) and third floors | — | Closed |
| Feb 21, 2017 | Interior Alterations | Interior alterations to the existing 3 storey dwelling. Partial alteration/renovation of the basement, minor alterations to the ground, second (new laundry room) and third floors | $200K | Closed |
| Feb 21, 2017 | Building Permit Related(PS) | Plumbing - Interior alterations to the existing 3 storey dwelling. Partial alteration/renovation of the basement, minor alterations to the ground, second (new laundry room) and third floors | — | Closed |
| Jan 23, 2017 | Building Permit Related(PS) | Plumbing - Change existing stair and entrance door. | — | Closed |
| Jan 20, 2017 | Interior Alterations | Change existing stair and entrance door. | $49K | Closed |
| Nov 30, 2016 | Building Permit Related(PS) | Plumbing - Proposed 2 storey sfdProposed 3 storey Part 3 sfd (sprinklered)-JL | — | Closed |
| Oct 3, 2016 | Building Permit Related (DR) | Drain - floor drains - Construct a new 3 storey single family house (1957.5m2), finished basement (746.86m2) with attached garage and attached cabana | — | Closed |
| Oct 3, 2016 | Building Permit Related(PS) | Plumbing - Construct a new 3 storey single family house (1957.5m2), finished basement (746.86m2) with attached garage and attached cabana | — | Closed |
| Jul 28, 2016 | Certified Tents | Install one 40'x100' frame tent (certified #14-206102) from July 28, 2016 - Aug 2, 2016 | — | Closed |
| Jun 30, 2016 | Site Service | New underground services | $30K | Closed |
| May 26, 2016 | Alternative Solution | Proposed alternative solution to waive the requirements for fire seperations and instead sprinkler will be provided. | — | Closed |
| Nov 18, 2015 | Building Permit Related(PS) | Plumbing - New house | — | Closed |
| Apr 13, 2015 | Building Permit Related(MS) | HVAC - Proposed 2 storey sfd | — | Closed |
| Apr 22, 2014 | Building Permit Related(PS) | Plumbing - One storey side addition and detached cabana | — | Closed |
| Apr 22, 2014 | Building Permit Related(MS) | HVAC - One storey side addition and detached cabana | — | Closed |
The 40 most recent of 111 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.