thepermitmap

Street · 1631 of 8,565 by permit count

Building permits on Hemford Cres

The City of Toronto has 119 building permits on record for Hemford Cres, going back to 1994. Those permits created 10 homes and removed 13, a net change of -3. Declared construction value totals $8.6M. The most recent permit was issued Feb 20, 2026 at 65 Hemford Cres.

Permits on record
1191994–2026
Declared construction value
$8.6Mas filed, not adjusted
Homes created
10dwelling units
Homes removed
13net -3

Permits issued per year

20002026 (part year)

Most common work

  • Building Permit Related(PS)22 · 18%
  • Building Permit Related (DR)19 · 16%
  • Building Permit Related(MS)19 · 16%
  • New Building15 · 13%
  • Demolition15 · 13%
  • Addition(s)6 · 5%
  • Underpinning3 · 3%
  • Back Water Valve (Sewer only)3 · 3%
  • Multiple Projects2 · 2%
  • Fire Damage2 · 2%
  • HVAC: SFD/Semi/TH2 · 2%
  • Interior Alterations2 · 2%

Structures worked on

  • SFD - Detached116 · 97%
  • 2 Unit - Detached2 · 2%
  • Underpinning1 · 1%

Most recent permits

Issued Work What was filed Value Status
Feb 20, 2026 Building Permit Related (DR) Drain - Construct underpinning only, no interior alterations Open
Nov 5, 2025 Building Permit Related(PS) Revision 01: Proposed revision to the basement layout to include a washroomPlumbing - Proposal to demolish existing one storey dwelling and construct a new one storey dwelling Open
Oct 23, 2025 New Building Revision 01: Proposed revision to the basement layout to include a washroomProposal to demolish existing one storey dwelling and construct a new one storey dwelling New build
Jul 9, 2025 Interior Alterations Proposal to remove load-bearing wall on first floor Closed
Oct 3, 2024 Addition(s) Proposal to demolish existing front porch and canopy and construct new one-storey garage addition. $289K Closed
Jan 4, 2024 Building Permit Related(PS) Plumbing - Interior alterations - lowering the basement floor, finishing the basement, and rear deck Closed
Dec 29, 2023 Multiple Projects Interior alterations - lowering the basement floor, finishing the basement, and rear deck $20K Closed
Oct 25, 2023 Underpinning Construct underpinning only, no interior alterations $500K Closed
Sep 27, 2023 Underpinning PROPOSAL FOR UNDERPINNING THE BASEMENT $500K Closed
Sep 27, 2023 Building Permit Related (DR) Drain - PROPOSAL FOR UNDERPINNING THE BASEMENT Closed
Aug 21, 2023 New Building Revision 02 - Convert basement into second unitRevision 01: Revision of issued permit "23 105572 BLD 00 NH", depth of building and eaves height revised based on recent approved variances. A secondary suite is not part of this proposal. To demolish existing dwelling and construct a new two storey wit New build
May 5, 2023 Building Permit Related(MS) HVAC - Revision of issued permit "23 105572 BLD 00 NH", depth of building and eaves height revised based on recent approved variaces and new HVACTo demolish existing dwelling and construct a new two storey with integral garage.A secondary suite is not part of this proposal. Open
Mar 27, 2023 Demolition To demolish existing dwelling and construct a new two storey with integral garage Demolition
Mar 22, 2023 Building Permit Related(MS) HVAC - TO BUILD A NEW TWO STOREY DETACHED HOUSE WITH INTEGRAL GARAGE, FRONT PORCH, REAR PATIO AND A SIDE WALK UP. Open
Mar 21, 2023 Demolition TO BUILD A NEW TWO STOREY DETACHED HOUSE WITH INTEGRAL GARAGE, FRONT PORCH, REAR PATIO AND A SIDE WALK UP. Demolition
Mar 21, 2023 New Building TO BUILD A NEW TWO STOREY DETACHED HOUSE WITH INTEGRAL GARAGE, FRONT PORCH, REAR PATIO AND A SIDE WALK UP. $1.0M New build
Mar 21, 2023 Building Permit Related (DR) Drain - TO BUILD A NEW TWO STOREY DETACHED HOUSE WITH INTEGRAL GARAGE, FRONT PORCH, REAR PATIO AND A SIDE WALK UP. Open
Mar 21, 2023 Building Permit Related(PS) Plumbing - TO BUILD A NEW TWO STOREY DETACHED HOUSE WITH INTEGRAL GARAGE, FRONT PORCH, REAR PATIO AND A SIDE WALK UP. Open
Mar 9, 2023 Building Permit Related(PS) Plumbing - To demolish existing dwelling and construct a new two storey with integral garage Open
Mar 9, 2023 Building Permit Related (DR) Drain - To demolish existing dwelling and construct a new two storey with integral garage Open
Oct 28, 2022 Fire Damage Structural fire damage restoration to existing dwelling Open
May 26, 2022 Building Permit Related (DR) Drain - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 22 137179 DEM, 21 139941 ZZC and 21 157712 MV. Closed
May 26, 2022 Demolition Proposal to demolish the existing 1 storey SFD-detached dwelling. Demolition
May 26, 2022 New Building Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 22 137179 DEM, 21 139941 ZZC and 21 157712 MV. $1.8M New build
May 26, 2022 Building Permit Related(PS) Plumbing - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 22 137179 DEM, 21 139941 ZZC and 21 157712 MV. Closed
May 26, 2022 Building Permit Related(MS) HVAC - Proposal to construct a new 2 storey SFD-detached dwelling with an integral garage and a finished basement. See also 22 137179 DEM, 21 139941 ZZC and 21 157712 MV. Closed
Sep 29, 2021 Building Permit Related(MS) HVAC - To construct second floor addition and carport enclosure with rear deck and interior alterations Open
Sep 7, 2021 Building Permit Related(PS) Plumbing - To construct second floor addition and carport enclosure with rear deck and interior alterations Open
Sep 7, 2021 Multiple Projects To construct second floor addition and carport enclosure with rear deck and interior alterations $500K Open
Feb 6, 2020 Second Suite (New) Proposal to legalize and maintain the 2nd suite in the basement of existing 1 storey dwelling. $5K Open
May 2, 2019 Building Permit Related(MS) Rev 1 - Proposed revision to have 2 separate furnaces. HVAC - Proposal to construct a new 2 storey SFD with integral garage and finished basement. See ZZC, COA, and Demo. Closed
Aug 16, 2018 New Building REV 01: Revision to 16-146172 BLD. Proposal to revise south elevation as per bubbled area on submitted drawing. Construct new two storey sfd-detached (405.40m2) w/ finished basement (180m2) New build
Aug 7, 2018 New Building REVISION - 2 windows added in the basementProposal to construct a new 2 storey single family dwelling and demolish the existing 2 storey single family dwelling New build
Aug 2, 2018 Building Permit Related (DR) Drain - Proposal to construct a new 2 storey SFD with integral garage and finished basement. See ZZC, COA, and Demo. Closed
Aug 2, 2018 Demolition Proposal to demolish existing 1 storey SFD. See BLD for new dwelling. Demolition
Aug 2, 2018 New Building Proposal to construct a new 2 storey SFD with integral garage and finished basement. See ZZC, COA, and Demo. $700K New build
Aug 2, 2018 Building Permit Related(PS) Plumbing - Proposal to construct a new 2 storey SFD with integral garage and finished basement. See ZZC, COA, and Demo. Closed
Jul 25, 2018 Building Permit Related(MS) HVAC - Proposal to demolish existing one storey dwelling and construct a new one storey dwelling Open
May 31, 2018 New Building Revision to interior layout and landscaping. New build
May 24, 2018 Building Permit Related(MS) HVAC Revision - Construct new 2-storey single family detached dwelling with finished basement Closed

The 40 most recent of 119 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
119
City refresh
2026-09-12 10:24
Page built
2026-09-12
Sheet
STR-047