Street · 2924 of 8,567 by permit count
Building permits on Grangeway Ave
The City of Toronto has 60 building permits on record for Grangeway Ave, going back to 2002. Those permits created 450 homes and removed 0, a net change of +450. Declared construction value totals $412.7M. The most recent permit was issued Aug 12, 2026 at 140 Grangeway Ave.
- Permits on record
- 602002–2026
- Declared construction value
- $412.7Mas filed, not adjusted
- Homes created
- 450dwelling units
- Homes removed
- 0net +450
Permits issued per year
20022026 (part year)
Most common work
Structures worked on
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Aug 12, 2026 | Partial Permit - Foundation | Conditional Permit - Part Permit - Construction of the Scarborough Centre Station for the SSE-SRS project | — | Open |
| Dec 3, 2025 | Other(BA) | The proposed work will include excavation works to construct the future Scarborough Centre Station | $1.0M | Closed |
| Nov 4, 2025 | Alternative Solution | The proposed alternative solution is to extend the prescribed 15 m maximum distance from the principal building entry to the fire department access route by 5 m, to a total of 20 m. | — | Open |
| Nov 4, 2025 | Alternative Solution | To remove the requirement for standard prescriptive provisions (sprinkler coverage, full-height access, emergency lighting, and additional passive fire separations) within a 1 m high crawl space underneath each platform, as the inclusion of such in a space with limited height access may be impractic | — | Open |
| Nov 4, 2025 | Alternative Solution | The proposed alternative solution required for OBC Div. B 3.13.3.3 (4) - Service Rooms and Ancillary Spaces demonstrates compliance with the minimum performance level and objectives, as outlined in the assessment presented. | — | Open |
| Nov 4, 2025 | Alternative Solution | It is proposed to instead supply emergency power from two alternate power supplies from Toronto Hydro in lieu of one primary power supply from Toronto Hydro and a back-up generator as prescribed by the OBC. | — | Open |
| Nov 3, 2025 | Alternative Solution | Proposal to remove the requirement for a 1-hour fire-rated enclosure around the elevator shafts by implementing controls such as the minimization of fire loads adjacent to elevator shafts, installing smoke detectors in the top of shafts, fire separating shafts from service floors, and installing lam | — | Open |
| Sep 23, 2025 | Site Service | The proposed work is located Scarborough Center Station, on the southwest corner of the Progress Avenue and Grangeway Avenue intersection. The subject site is approximately 1.8 ha in area, which consists of three properties: #110, #120 and #140 Grangeway Avenue (Proposed SCS ¿ Construction laydown a | $410K | Open |
| Aug 22, 2025 | Temporary Structures | Proposal to place the temporary site trailers in the laydown area for the proposed Scarborough Centre Station | — | Open |
| Aug 21, 2025 | Site Service | The proposed work is located at 110,120 and 140 Grangeway (which will be used as construction laydown area for proposed Scarborough Centre Station Construction). As part of this application, STC seeks approval for installing storm sewers, catch basins, MH -1, Hydrodome MH and two storm attenuation t | $1.3M | Open |
| Jul 3, 2025 | Partial Permit - Shoring | Conditional Permit - Part Permit - Construction of the Scarborough Centre Station for the SSE-SRS project | — | Closed |
| Apr 17, 2024 | New Building | Construction of the Scarborough Centre Station for the SSE-SRS project | $372.6M | New build |
| Sep 7, 2023 | Building Permit Related(MS) | HVAC - PROPOSED: DEMOLITION AND CONSTRUCTION OF NON-LOAD BEARING DRYWALL PARTITIONS. MODIFICATIONS TO LIGHTING/HVAC/SPRINKLER LAYOUT TO SUIT. ADDITION OF SINK USING EXISTING PLUMBING ROUGH-IN. | — | Closed |
| Sep 7, 2023 | Building Permit Related(PS) | Plumbing - PROPOSED: DEMOLITION AND CONSTRUCTION OF NON-LOAD BEARING DRYWALL PARTITIONS. MODIFICATIONS TO LIGHTING/HVAC/SPRINKLER LAYOUT TO SUIT. ADDITION OF SINK USING EXISTING PLUMBING ROUGH-IN. | — | Open |
| Sep 6, 2023 | Interior Alterations | PROPOSED: DEMOLITION AND CONSTRUCTION OF NON-LOAD BEARING DRYWALL PARTITIONS. MODIFICATIONS TO LIGHTING/HVAC/SPRINKLER LAYOUT TO SUIT. ADDITION OF SINK USING EXISTING PLUMBING ROUGH-IN. | $85K | Closed |
| Mar 16, 2020 | Garage Repair/Reconstruction | Localized concrete repairs in underground parking garage. Scope of work includes concrete slab repairs, vertical surface repairs, reinforcing steel repairs, and waterproofing. | $15K | Open |
| Sep 6, 2019 | Piping: Other Buildings | Proposed Kitec plumbing replacement for Amenities: Change Room &Party Room, for 1st Floor Suite # 6 and Guest Suite for 2nd Floor Suite # 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 15, 16, for the 3rd to the 19th Floor Suite #'s 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 15, 16, for the 20th Floor Suite #'s | $450K | Open |
| Dec 14, 2018 | Garage Repair/Reconstruction | Proposal to repair/replace the parking garage entrance ramp topping complete with new waterproofing. | $169K | Closed |
| Jun 1, 2015 | Backflow Prevention Devices (Water only) | INSTALL 4" DCVA BACKFLOW PREVENTER | $5K | Open |
| May 5, 2015 | Other(BA) | Proposal to repair balcony and cladding related to fire on the balcony of unit 2303 in the existing apartment building. | $4K | Closed |
| Jun 3, 2014 | Backflow Prevention Devices (Water only) | Install Backflow Prevention Device | $12K | Open |
| Dec 17, 2012 | Electromagnetic Locks | install 2 maglocks on second floor | $2K | Closed |
| Jul 27, 2012 | Interior Alterations | REV. #1- adding walls in servery area and relocating a doorway and relocate two sprinklers construct interior alterations on second floor (2nd) for RBC bank | — | Closed |
| Apr 18, 2012 | Building Permit Related(PS) | Plumbing - construct interior alterations on second floor (2nd) for RBC bank | — | Closed |
| Apr 18, 2012 | Building Permit Related(MS) | HVAC - construct interior alterations on second floor (2nd) for RBC bank | — | Closed |
| Jun 1, 2011 | Building Permit Related(MS) | HVAC - renovate existing office space on 4th floor | — | Closed |
| May 31, 2011 | Interior Alterations | renovate existing office space on 4th floor | $90K | Closed |
| Mar 15, 2011 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - work description: new 26 storey condominium existing use: vacant propsed use: condominium | — | Closed |
| Jan 16, 2009 | Building Permit Related(PS) | Plumbing - Interior alterations to the 5th floor. | — | Closed |
| Jan 7, 2009 | Building Permit Related(MS) | HVAC - Interior alterations to the 5th floor. | — | Closed |
| Jan 7, 2009 | Interior Alterations | Interior alterations to the 5th floor. | $90K | Closed |
| Oct 5, 2007 | Building Permit Related(PS) | Plumbing - work description: new 20 storey condominium existing use: vacant propsed use: condominium - New Building | — | Closed |
| Oct 5, 2007 | Building Permit Related(MS) | HVAC - work description: new 20 storey condominium existing use: vacant propsed use: condominium - New Building | — | Closed |
| Sep 25, 2007 | Interior Alterations | interior tenant alterations | $40K | Closed |
| Sep 20, 2007 | Building Permit Related(PS) | Plumbing - relocate office partitions for RBC | — | Closed |
| Sep 20, 2007 | Building Permit Related(MS) | HVAC - relocate office partitions for RBC | — | Closed |
| Sep 6, 2007 | Interior Alterations | relocate office partitions for RBC | $100K | Closed |
| Nov 6, 2006 | Building Permit Related(PS) | Plumbing - Interior renovation, incl. minor plumbing | — | Closed |
| Nov 6, 2006 | Building Permit Related(MS) | HVAC - Interior renovation, incl. minor plumbing | — | Closed |
| Nov 6, 2006 | Interior Alterations | Interior renovation, incl. minor plumbing | $10K | Closed |
The 40 most recent of 60 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.