Street · 633 of 8,567 by permit count
Building permits on Galloway Rd
The City of Toronto has 276 building permits on record for Galloway Rd, going back to 1997. Those permits created 206 homes and removed 10, a net change of +196. Declared construction value totals $77.0M. The most recent permit was applied for Sep 8, 2026 at 144 Galloway Rd.
- Permits on record
- 2761997–2026
- Declared construction value
- $77.0Mas filed, not adjusted
- Homes created
- 206dwelling units
- Homes removed
- 10net +196
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Where this street runs
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Sep 8, 2026 | Partial Permit - Structural Framing | Conditional Permit - Part Permit - Proposal for construction of a new 10-storey rental apartment building with 2-storey underground parking.See also 20-220827 SA | — | Open |
| Aug 5, 2026 | Building Permit Related (DR) | Drain - Proposal to demolish existing single family dwelling and construct a three-storey fourplex building. See also 25-228691 ZAP 00 ZR | — | Closed |
| Aug 5, 2026 | Building Permit Related(PS) | Plumbing - Proposal to demolish existing single family dwelling and construct a three-storey fourplex building. See also 25-228691 ZAP 00 ZR | — | Closed |
| Jul 30, 2026 | Demolition | Proposal to demolish existing single family dwelling and construct a three-storey fourplex building. See also 25-228691 ZAP 00 ZR & 26-211460 BLD 00 NH | — | Demolition |
| Jul 30, 2026 | New Building | Proposal to demolish existing single family dwelling and construct a three-storey fourplex building. See also 25-228691 ZAP 00 ZR | $1.0M | New build |
| Jul 15, 2026 | Building Permit Related(PS) | Plumbing - Proposed interior alterations and add of a walk-out stair for owner's use only. | — | Open |
| Jul 15, 2026 | Multiple Projects | Proposed interior alterations and add of a walk-out stair for owner's use only. | $50K | Open |
| Jul 8, 2026 | Partial Permit - Shoring | Conditional Permit - Part Permit - Proposal for construction of a new 10-storey apartment building with 2-storey underground parking. | — | Open |
| Jun 24, 2026 | Garage Repair/Reconstruction | Proposed localized concrete balcony slab repairs and waterproofing installation on 5th floor. | $56K | Open |
| Feb 9, 2026 | Building Permit Related(MS) | HVAC - Proposal for construction of a new 10-storey apartment building with 2-storey underground parking. | — | Open |
| Feb 9, 2026 | Building Permit Related(PS) | Plumbing - Proposal for construction of a new 10-storey apartment building with 2-storey underground parking. | — | Open |
| Feb 9, 2026 | Inside and Outside Drains | Drain - Proposal for construction of a new 10-storey apartment building with 2-storey underground parking. | $100K | Open |
| Feb 9, 2026 | New Building | Proposal for construction of a new 10-storey rental apartment building with 2-storey underground parking.See also 20-220827 SA | $60.0M | New build |
| Feb 9, 2026 | Building Permit Related (DR) | Drain - Proposal for construction of a new 10-storey apartment building with 2-storey underground parking. | — | Open |
| Nov 21, 2025 | Fire Damage | Proposal for Fire Damage Repairs - Replacing patio doors, guardrails, and waterproofing membrane, replacing damaged soffit, gutter, downspout, and attic insulation, repairing interior drywall, and cleaning smoke-affected areas - UNIT 49 | — | Open |
| Aug 19, 2025 | Interior Alterations | Proposed reconfigure main floor for new accessible washroom | $15K | Open |
| Aug 19, 2025 | Building Permit Related(PS) | Plumbing - Proposed reconfigure main floor for new accessible washroom | — | Open |
| Jul 8, 2025 | Addition(s) | Proposal to construct a 1 storey addition at the rear of an existing SFD-detached dwelling.See also 24 215331 ZAP( Comment by OBC examiner: this is a two storey addition based on the drawings) | $50K | Open |
| Jul 8, 2025 | Building Permit Related(PS) | Plumbing - Proposal to construct a 1 storey addition at the rear of an existing SFD-detached dwelling. | — | Open |
| Jul 8, 2025 | Building Permit Related(MS) | HVAC - Proposal to construct a 1 storey addition at the rear of an existing SFD-detached dwelling. | — | Open |
| Apr 17, 2025 | Demolition | Proposal to demolish the existing 1 storey building & build a new 2 storey SFD | — | Demolition |
| Nov 13, 2024 | Building Permit Related(MS) | HVAC - Proposal to construct interior alterations to convert a portion of existing car wash into a sales office with minor alterations and improvements to exterior facade | — | Closed |
| Nov 13, 2024 | Interior Alterations | Proposal to construct interior alterations to convert a portion of existing car wash into a sales office with minor alterations and improvements to exterior facade | $150K | Closed |
| Sep 5, 2024 | New Laneway / Rear Yard Suite | Revision 01 - to construct two wood entrance decks to new garden suitePROPOSED: NEW SINGLE STOREY GARDEN SUITE IN EXISTING REAR YARD. | — | Closed |
| Aug 20, 2024 | Building Permit Related (DR) | Drain - Proposal for a Two Storey Residential Dwelling | — | Closed |
| Aug 20, 2024 | Building Permit Related(PS) | Plumbing - Proposal for a Two Storey Residential Dwelling | — | Closed |
| Aug 19, 2024 | New Building | Proposal to construct a new two storey detached SFD with an integral garage, front porch, finished basement, rear basement walkout and a rear deck. To demolish the existing dwelling. | $500K | New build |
| Jul 29, 2024 | Building Permit Related (DR) | Drain - PROPOSED: NEW SINGLE STOREY GARDEN SUITE IN EXISTING REAR YARD. | — | Closed |
| Jul 29, 2024 | Building Permit Related(PS) | Plumbing - PROPOSED: NEW SINGLE STOREY GARDEN SUITE IN EXISTING REAR YARD. | — | Closed |
| Jul 29, 2024 | Building Permit Related(MS) | HVAC - PROPOSED: NEW SINGLE STOREY GARDEN SUITE IN EXISTING REAR YARD. | — | Closed |
| Jun 24, 2024 | Interior Alterations | Proposal to restore front entrance beam and door | $356K | Closed |
| Apr 5, 2024 | Building Permit Related(PS) | Plumbing - CONVERT BASEMENT TO 2 SEPERATE DWELLING WITH 2 BELOW GRADE ENTRANCE, ANDGROUND FLOOR INTO ANOTHER 2 SEPERATE DWELLING. | — | Closed |
| Apr 4, 2024 | Building Permit Related(MS) | HVAC - CONVERT BASEMENT TO 2 SEPERATE DWELLING WITH 2 BELOW GRADE ENTRANCE, ANDGROUND FLOOR INTO ANOTHER 2 SEPERATE DWELLING. | — | Closed |
| Feb 26, 2024 | Demolition | Proposal to demolish the existing 1 storey SFD-detached dwelling. | — | Demolition |
| Jan 23, 2024 | Multiple Projects | Proposed podium deck re-waterproofing, localized concrete repairs and replacement of landscaping finishes. (Phase 2) | $650K | Closed |
| Nov 29, 2023 | New Laneway / Rear Yard Suite | Proposal to construct a new 1 storey garden suite in the rear yard of an existing fourplex.See also 23 177626 ZAP. | $95K | Closed |
| Nov 24, 2023 | Other(SR) | CONVERT BASEMENT TO 2 SEPERATE DWELLING WITH 2 BELOW GRADE ENTRANCE, ANDGROUND FLOOR INTO ANOTHER 2 SEPERATE DWELLING. | $100K | Closed |
| Oct 19, 2023 | Second Suite (New) | Interior alteration for legal basement unit. | $100K | Closed |
| Oct 19, 2023 | Building Permit Related(PS) | Plumbing - Interior alteration for legal basement unit. | — | Closed |
| Sep 14, 2023 | New Building | Proposal to construct a new 2 storey Fourplex (4 dwelling units) on an existing vacant lot. | $900K | New build |
The 40 most recent of 276 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.