Street · 3121 of 8,516 by permit count
Building permits on Flemington Rd, North York
The City of Toronto has 54 building permits on record for Flemington Rd in North York, going back to 1997. Declared construction value totals $92.2M. Half of the 47 permits issued here came through within 21 days of the application. The most recent permit was issued Apr 7, 2026 at 160 Flemington Rd.
- Permits on record
- 541997–2026
- Declared construction value
- $92.2Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 21 days6 days faster than the city
Permits issued per year
Zoning
- Most common zone
- RM100.0% of permits · by-law 10.80
- In detached-house zones
- 0.0%38.0% below the city’s 38.0%
- Permits with a zone
- 25of 54 on record
The zoning categories the permits on Flemington Rd fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Where this street runs
Other streets in M6A
Looking for one address on Flemington Rd? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Apr 7, 2026 | Other(BA) | Proposal for water-damage restoration due to failed sprinkler heads. | — | Open |
| Jan 20, 2025 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - To construct a new Community Recreation Centre and Childcare Centre located within the Lawrence Heights community Master Plan. The Recreation Centre will be located on 2.4 acres of land. The 4-storey building ncludes a 6-lane lap pool, therapy pool, multi-purpose rooms, | — | Open |
| Dec 23, 2024 | Alternative Solution | Alternative Solution - The following outlines the proposed alternative solution for the applicable building code requirements, relative to fire protection and life safety, as they relate to the Lawrence Heights Community Recreation Centre and Childcare Centre (Project), located in North York, Ontari | — | Closed |
| Dec 23, 2024 | New Building | To construct a new Community Recreation Centre and Childcare Centre located within the Lawrence Heights community Master Plan. The Recreation Centre will be located on 2.4 acres of land. The 4-storey building ncludes a 6-lane lap pool, therapy pool, multi-purpose rooms, youth space, fitness and gymn | $91.0M | New build |
| Dec 23, 2024 | Site Service | Drain - To construct a new Community Recreation Centre and Childcare Centre located within the Lawrence Heights community Master Plan. The Recreation Centre will be located on 2.4 acres of land. The 4-storey building ncludes a 6-lane lap pool, therapy pool, multi-purpose rooms, youth space, fitness | $100K | Open |
| Dec 23, 2024 | Building Permit Related(MS) | HVAC - To construct a new Community Recreation Centre and Childcare Centre located within the Lawrence Heights community Master Plan. The Recreation Centre will be located on 2.4 acres of land. The 4-storey building ncludes a 6-lane lap pool, therapy pool, multi-purpose rooms, youth space, fitness a | — | Open |
| Dec 23, 2024 | Building Permit Related (DR) | Drain - To construct a new Community Recreation Centre and Childcare Centre located within the Lawrence Heights community Master Plan. The Recreation Centre will be located on 2.4 acres of land. The 4-storey building ncludes a 6-lane lap pool, therapy pool, multi-purpose rooms, youth space, fitness | — | Open |
| Dec 23, 2024 | Building Permit Related(PS) | Plumbing - To construct a new Community Recreation Centre and Childcare Centre located within the Lawrence Heights community Master Plan. The Recreation Centre will be located on 2.4 acres of land. The 4-storey building ncludes a 6-lane lap pool, therapy pool, multi-purpose rooms, youth space, fitne | — | Open |
| Dec 17, 2019 | Backflow Prevention Devices (Water only) | Proposal to install new premise isolation backflow preventer. | $10K | Closed |
| Jul 24, 2019 | Fire Alarm | Proposal to replace fire alarm control panel in existing apartment building. | $10K | Closed |
| Jul 24, 2019 | Fire Alarm | Proposal to replace the existing fire alarm control panel. | $10K | Closed |
| Jul 23, 2019 | Fire Alarm | Proposal to replace fire alarm control panel. | $10K | Closed |
| Jul 23, 2019 | Fire Alarm | Proposal to replace fire alarm control panel in existing apartment building. | $10K | Closed |
| Jul 23, 2019 | Fire Alarm | Proposal to replace the existing fire alarm control panel | $10K | Closed |
| Dec 3, 2018 | Backflow Prevention Devices (Water only) | New premise isloation backflow preventer installation | $10K | Closed |
| Nov 27, 2018 | Backflow Prevention Devices (Water only) | Proposal to install one backflow prevention device in existing apartment building. | $10K | Closed |
| Nov 27, 2018 | Backflow Prevention Devices (Water only) | Proposal to install one backflow prevention device in existing apartment building. | $10K | Closed |
| Nov 27, 2018 | Backflow Prevention Devices (Water only) | Proposed Backflow Prevention Devices (Water only) | $10K | Closed |
| Jun 29, 2016 | Building Permit Related(PS) | Plumbing - Interior alterations to provide washrooms in an existing FDK classroom on ground floor - Flemington Elementary School | — | Closed |
| Jun 29, 2016 | Building Permit Related(MS) | HVAC - Interior alterations to provide washrooms in an existing FDK classroom on ground floor - Flemington Elementary School | — | Closed |
| Jun 14, 2016 | Interior Alterations | Interior alterations to provide washrooms in an existing FDK classroom on ground floor - Flemington Elementary School | $80K | Closed |
| Apr 26, 2016 | MGO 565 Remediation | Clean up of mould growth at former marijuana grow operation. Clearance of Unsafe Order 15-262159 MGO 00 VI | $9K | Closed |
| Sep 28, 2011 | Backflow Prevention Devices (Water only) | Installation of backflow preventor | $5K | Closed |
| Sep 8, 2011 | Backflow Prevention Devices (Water only) | Backflow prevention device | $5K | Closed |
| Sep 8, 2011 | Backflow Prevention Devices (Water only) | Backflow prevention device | $5K | Closed |
| Sep 8, 2011 | Backflow Prevention Devices (Water only) | Backflow prevention device | $5K | Closed |
| Sep 8, 2011 | Backflow Prevention Devices (Water only) | Backflow prevention device | $5K | Closed |
| Sep 8, 2011 | Backflow Prevention Devices (Water only) | Backflow prevention device | $5K | Closed |
| Sep 8, 2011 | Backflow Prevention Devices (Water only) | Backflow prevention device | $5K | Closed |
| Sep 8, 2011 | Backflow Prevention Devices (Water only) | Backflow prevention device | $5K | Closed |
| May 3, 2011 | Piping: Other Buildings | Flemington Public school - new watermain and backflow preventer | $110K | Open |
| May 3, 2010 | Backflow Prevention Devices (Water only) | Backflow preventor | $6K | Closed |
| Mar 10, 2009 | Building Permit Related(PS) | Plumbing - Office partitioning to part of the first and second floors of the existing New Heights Community Health Centre | — | Closed |
| Mar 10, 2009 | Building Permit Related(MS) | HVAC - Office partitioning to part of the first and second floors of the existing New Heights Community Health Centre | — | Closed |
| Feb 26, 2009 | Interior Alterations | Part of the first and second floors - New Heights Community Health Centre | $100K | Closed |
| Jul 9, 2008 | Building Permit Related(PS) | Plumbing - 1st floor washroom alterations | — | Closed |
| Jun 17, 2008 | Building Permit Related(MS) | HVAC - 1st floor washroom alterations | — | Closed |
| Jun 17, 2008 | Interior Alterations | 1st floor washroom alterations | $60K | Open |
| Mar 12, 2008 | Special Ventilation System | HVAC - Install new opening for roof top units. | — | Closed |
| Mar 12, 2008 | Other(BA) | Install new opening for roof top units. | $300K | Closed |
The 40 most recent of 54 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Flemington Rd with a permit on record · 21
- 1 Flemington Rd2 permits · to 2019
- 2 Flemington Rd12 permits · to 2025
- 3 Flemington Rd6 permits · to 2019
- 4 Flemington Rd5 permits · to 2019
- 5 Flemington Rd5 permits · to 2019
- 6 Flemington Rd4 permits · to 2019
- 7 Flemington Rd7 permits · to 2019
- 8 Flemington Rd5 permits · to 2019
- 9 Flemington Rd3 permits · to 2018
- 10 Flemington Rd9 permits · to 2016
- 11 Flemington Rd2 permits · to 2018
- 12 Flemington Rd10 permits · to 2010
- 14 Flemington Rd5 permits · to 2019
- 15 Flemington Rd4 permits · to 2011
- 16 Flemington Rd4 permits · to 2011
- 17 Flemington Rd4 permits · to 2011
- 18 Flemington Rd5 permits · to 2019
- 19 Flemington Rd4 permits · to 2011
- 20 Flemington Rd4 permits · to 2011
- 63 Flemington Rd1 permit · to 2000
- 160 Flemington Rd1 permit · to 2026