Street · 303 of 8,516 by permit count
Building permits on Consilium Pl, Scarborough
The City of Toronto has 471 building permits on record for Consilium Pl in Scarborough, going back to 1997. Declared construction value totals $79.6M. Half of the 439 permits issued here came through within 27 days of the application. The most recent permit was issued Oct 30, 2026 at 300 Consilium Pl.
- Permits on record
- 4711997–2026
- Declared construction value
- $79.6Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 27 dayscity median
Permits issued per year
Most common work
Structures worked on
Postal areas
Other streets in M1H
Looking for one address on Consilium Pl? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Oct 30, 2026 | Building Permit Related(MS) | HVAC - Proposed interior alterations to floors 7, 8, and 9 of an existing office building. The scope of work is limited to interior spaces and does not include any alterations to the building core and shell.. | — | Open |
| Oct 30, 2026 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to floors 7, 8, and 9 of an existing office building. The scope of work is limited to interior spaces and does not include any alterations to the building core and shell.. | — | Open |
| Oct 29, 2026 | Interior Alterations | Proposed interior alterations to floors 7, 8, and 9 of an existing office building. The scope of work is limited to interior spaces and does not include any alterations to the building core and shell.. | $9.2M | Open |
| Oct 22, 2026 | Interior Alterations | REV 01: Revision to permit, updates to include the addition of ADO and finishes refresh, including water closet remove and re-installation and new automated faucet and sink, to existing building barrier free washrooms on the 11th, 12th, 13th, and 14th floorProposed interior alterations to exiting of | — | Open |
| Oct 19, 2026 | Building Permit Related(PS) | REV 01: Revision to permitPlumbing - Proposed interior alterations to exiting office floors 11-14 | — | Open |
| Oct 8, 2026 | Building Permit Related(MS) | REV 01: Revision to permitHVAC - Interior Alterations - office partitions, ceiling and interior finishing, HVAC and sprinkler revisions | — | Closed |
| Oct 8, 2026 | Interior Alterations | REV 01: Revision to permitInterior Alterations - office partitions, ceiling and interior finishing, HVAC and sprinkler revisionsThe following explains the room use in detail:1. R&T Area (Laboratory) Office-based testing/simulating and configuration (no chemical or industrial labuse)2. R&T Area (Asse | — | Open |
| Sep 14, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to floors 1 - 6. | — | Open |
| Sep 14, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to floors 1 - 6. | — | Open |
| Sep 14, 2026 | Interior Alterations | Proposal for interior alterations to floors 1 - 6. | $1.0M | Open |
| Sep 11, 2026 | Sign Building Permit Related | Application for a permit to erect and display one first party wall sign, displaying static copy and illuminated, erected at the upper-level storey. Dimensions:Wall sign: 1.83m L x 11.87m W x 0.2m D at a height of 65.41 on the north-west elevation.** HITACHI** | — | Open |
| Jul 27, 2026 | Building Permit Related(MS) | HVAC - Proposed interior alterations to exiting office floors 11-14 | — | Open |
| Jul 9, 2026 | Sign Building Permit Related | 1 Wall Sign ** HITACHI ** | — | Closed |
| Jul 8, 2026 | Building Permit Related(FS) | FS - Sprinkler Shop Drawing - Proposal for interior alterations to existing office space on the 10th Floor - Hitachi Rail GTS Canada Inc | — | Closed |
| Jun 15, 2026 | Electromagnetic Locks | Installation of two electromagnetic locks | $50K | Open |
| Jun 11, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations | — | Open |
| Jun 9, 2026 | Interior Alterations | Proposal for interior alterations | $700K | Open |
| Jun 1, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations | — | Closed |
| Jun 1, 2026 | Interior Alterations | Proposal for interior alterations | $700K | Closed |
| Apr 27, 2026 | Garage Repair/Reconstruction | Proposed localized concrete repairs, drain repalcement, catch basin replacement, expansion joint replacement, and waterproofing replacement. | $1.1M | Open |
| Mar 10, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to existing office space - 10th Floor, "SHN" | — | Open |
| Mar 10, 2026 | Interior Alterations | Proposal for interior alterations to existing office space - 10th Floor, "SHN" | $45K | Open |
| Feb 5, 2026 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to existing office space on the 10th Floor - Hitachi Rail GTS Canada Inc | — | Open |
| Feb 5, 2026 | Interior Alterations | Proposal for interior alterations to existing office space on the 10th Floor - Hitachi Rail GTS Canada Inc | $4.6M | Open |
| Feb 5, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to existing office space on the 10th Floor - Hitachi Rail GTS Canada Inc | — | Open |
| Jan 2, 2026 | Interior Alterations | Rev 01: see cover letterProposed interior alteration - office build-out (Floors 14-17) | — | Open |
| Dec 30, 2025 | Building Permit Related(PS) | Rev 01: see cover letterPlumbing - Proposed interior alteration - office build-out (Floors 14-17) | — | Open |
| Dec 30, 2025 | Building Permit Related(MS) | Rev 01: See cover letterHVAC - Proposed interior alteration - office build-out (Floors 14-17) | — | Open |
| Nov 3, 2025 | Other(BA) | Localized concrete repairs, waterproofing repairs and railing replacement at the existing podium deck stair. | $58K | Open |
| Oct 31, 2025 | Building Permit Related(MS) | HVAC - Proposal for interior renovation of office rooms. | — | Open |
| Oct 30, 2025 | Building Permit Related(PS) | Plumbing - construct demising wall within exsiting office unit 105 | — | Closed |
| Oct 30, 2025 | Building Permit Related(MS) | HVAC - construct demising wall within exsiting office unit 105 | — | Closed |
| Oct 30, 2025 | Interior Alterations | construct demising wall within exsiting office unit 105 | $90K | Closed |
| Oct 27, 2025 | Interior Alterations | Revision: removal of proposed FHC | — | Closed |
| Oct 8, 2025 | Interior Alterations | Proposal for interior renovation of office rooms. | $30K | Open |
| Jul 31, 2025 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to include demolition and construction of office partitions to suite new tenant layout. | — | Closed |
| Jul 31, 2025 | Building Permit Related(MS) | HVAC - Proposed interior alterations to include demolition and construction of office partitions to suite new tenant layout. | — | Closed |
| Jun 11, 2025 | Building Permit Related(PS) | REVISION 01: PROPOSED AS BUILT DRAWINGSPlumbing - Interior fit-up for a new medical imaging clinic within an existing office building. - Unit 201 & 202 - KMH Cardiology Centres Inc. | — | Closed |
| Jun 11, 2025 | Building Permit Related(MS) | REVISION 01: PROPOSED PER AS BUILT DRAWINGSHVAC - Interior fit-up for a new medical imaging clinic within an existing office building. - Unit 201 & 202 - KMH Cardiology Centres Inc. | — | Closed |
| May 15, 2025 | Building Permit Related(PS) | Plumbing - Proposed interior alterations to an existing office at Unit 101 for a Day Care Centre. | — | Open |
The 40 most recent of 471 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Consilium Pl with a permit on record · 4
- 0 Consilium Pl1 permit · to 2021
- 100 Consilium Pl177 permits · to 2026
- 200 Consilium Pl117 permits · to 2023
- 300 Consilium Pl176 permits · to 2026