Type of work · 70 of 103 by permit count
HVAC: Groups D & E permits in Toronto
The City of Toronto has 535 hvac: groups d & e permits on record for Toronto, going back to 2001. Declared construction value totals $54.1M. Half of the 504 permits issued here came through within 21 days of the application. The most recent permit was issued Oct 28, 2026 at 130 King St W.
- Permits on record
- 5352001–2026
- Declared construction value
- $54.1Mas filed, not adjusted
- Homes created
- 0dwelling units
- Homes removed
- 0net +0
- Typical wait
- 21 days6 days faster than the city
Permits issued per year
Zoning
- Most common zone
- CR85.2% of permits · by-law 40.10
- In detached-house zones
- 0.3%37.7% below the city’s 38.0%
- Permits with a zone
- 304of 535 on record
The zoning categories the permits in HVAC: Groups D & E fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.
Most common work
Structures worked on
Postal areas
Most recent permits
| Issued | Address | Work | What was filed | Value | Status |
|---|---|---|---|---|---|
| Oct 28, 2026 | 130 King St W | HVAC: Groups D & E | Proposal for interior demolition to bring the 17th floor back to base. | $1K | Open |
| Oct 22, 2026 | 3401 Dufferin St | HVAC: Groups D & E | Proposal for interior demolition to CRU 171 to bring back to base condition including HVAC | $500K | Open |
| Oct 20, 2026 | 2775-2777 St Clair Ave E | HVAC: Groups D & E | Proposal for commercial kitchen ventilation and fire suppression systems installation. | $5K | Open |
| Oct 19, 2026 | 3 Nassau St | HVAC: Groups D & E | HVAC permit for as built heating and cooling system, relocation of existing heat pump. | $2K | Open |
| Oct 9, 2026 | 199 Bay St | HVAC: Groups D & E | Proposal for interior demolition to suite 3210 to bring back to base condition including HVAC | $200K | Open |
| Oct 7, 2026 | 369 Queen St W | HVAC: Groups D & E | Revision 1: Proposal for HVAC re - A new commercial building, 3 stories above grade, 1 storey underground. Building area is 288.1 m², we got the building permit, the owner engages another mechanical engineer to prepare a new set of mechanical drawings. We want to apply for HVAC and Plumbing permit. | — | Open |
| Oct 6, 2026 | 5372-5374 YONGE ST | HVAC: Groups D & E | Proposal for commercial kitchen ventilation. | $65K | Open |
| Sep 30, 2026 | 846-850 EGLINTON AVE E | HVAC: Groups D & E | Proposal for HVAC standalone. Add ventilation to existing 6ix Nails Spa. | $10K | Open |
| Sep 25, 2026 | 632 Queen St E | HVAC: Groups D & E | HVAC permit required to close out Plumbing Permit.Related 26-155352 BLD 00 BA | $2K | Closed |
| Sep 22, 2026 | 1510-1512 EGLINTON AVE W | HVAC: Groups D & E | Proposal to add new kitchen hood, exhaust fan and makeup air. | $30K | Open |
| Sep 1, 2026 | 1001 Queen St E | HVAC: Groups D & E | Proposed Mechanical Stand-Alone (Proposed Commercial Kitchen Ventilation). | — | Open |
| Sep 1, 2026 | 6923 Steeles Ave W | HVAC: Groups D & E | Proposal for kitchen hood and related fire suppression system. | $10K | Open |
| Aug 27, 2026 | 1571 Sandhurst Crcl | HVAC: Groups D & E | Proposal for HVAC Replacement - (2) like for like RTU's | $136K | Open |
| Jun 5, 2026 | 349 College St | HVAC: Groups D & E | Proposal for HVAC alterations including exhaust fan installation and ductwork modifications for ventilation improvements | $10K | Open |
| May 26, 2026 | 80 Richmond St W | HVAC: Groups D & E | Proposal for interior HVAC fit-out | $5K | Closed |
| May 5, 2026 | 61 Front St W | HVAC: Groups D & E | Kitchen exhaust damper installation | $15K | Open |
| May 4, 2026 | 367 King St W | HVAC: Groups D & E | Proposed Commercial Kitchen Ventilation System | $35K | Closed |
| Jan 20, 2026 | 100 Wellington St W | HVAC: Groups D & E | Proposed addition of one (1) HVAC VAV into room. | $50K | Closed |
| Jan 9, 2026 | 230 Front St W | HVAC: Groups D & E | Mechanical work for 19TH, 20TH AND 24TH floor hub rooms | $250K | Closed |
| Nov 25, 2025 | 538 Dundas St W | HVAC: Groups D & E | Proposal to install a kitchen ventilation system. | $20K | Open |
| Nov 12, 2025 | 345 Bloor St E | HVAC: Groups D & E | Proposal to install an exhaust hood. | $150K | Closed |
| Sep 4, 2025 | 238 Augusta Ave | HVAC: Groups D & E | Proposed Commercial Kitchen Ventilation System _ Mechanical Stand-Alone Only | $35K | Open |
| Aug 18, 2025 | 351 King St E | HVAC: Groups D & E | Proposal for mechanical alterations to the 18th floor. | $10K | Closed |
| Jul 29, 2025 | 525 University Ave | HVAC: Groups D & E | Proposal for alterations to mechanical systems. | $7K | Closed |
| Jul 22, 2025 | 2466 Kingston Rd | HVAC: Groups D & E | Proposal to install an exhaust fand and a make-up air unit. | $30K | Open |
| Jun 10, 2025 | 0 YORKVILLE AVE | HVAC: Groups D & E | Proposed addition of HVAC system to allow for more cooling in the existing space. | $10K | Open |
| Apr 14, 2025 | 2 Strachan Ave | HVAC: Groups D & E | Proposal for the demolition of existing make-up air units serving and the building and provision of two (2) roof-mounted air-sourced heat pumps including ductwork, insulation, power & control wiring. | $550K | Closed |
| Mar 27, 2025 | 5555 Eglinton Ave W | HVAC: Groups D & E | Proposed adding 20' kitchen hood, fire suppression syste, KEF, MAU supply fan, electric duct heater to existing store. | $20K | Closed |
| Jan 27, 2025 | 16 York St | HVAC: Groups D & E | New dedicated cooling unit for existing boardroom | $70K | Closed |
| Jan 15, 2025 | 400 University Ave | HVAC: Groups D & E | Proposed mechanical updates - third and fourth floors | $150K | Closed |
| Nov 8, 2024 | 5801-5865 YONGE ST | HVAC: Groups D & E | new HVAC for existing vacant office. | $100K | Closed |
| Oct 18, 2024 | 1881 Steeles Ave W | HVAC: Groups D & E | Proposal to Supply and install (4) replacement like for like roof top HVAC units | $96K | Closed |
| Oct 16, 2024 | 45 Overlea Blvd | HVAC: Groups D & E | Supply and install (2) replacement RTU's due to end of useful life | $75K | Closed |
| Sep 6, 2024 | 2038 Kipling Ave | HVAC: Groups D & E | Proposal to supply and install (5) replacement roof mounted HVAC units and (4) replacement split AC systems. | $20K | Closed |
| Sep 6, 2024 | 2700 Kipling Ave | HVAC: Groups D & E | Supply and install (1) replacement RTU due to end of useful life. | $35K | Closed |
| Aug 27, 2024 | 2611 Eglinton Ave W | HVAC: Groups D & E | Rev 01 - Revision to the existing permitProposed addition of new kitchen exhaust in existing food takeout / retail store. | — | Open |
| Aug 19, 2024 | 870 St Clair Ave W | HVAC: Groups D & E | Proposal for installation of (2) replacement HVAC roof top units. Like for like replacements | $56K | Closed |
| Jul 4, 2024 | 120 Bremner Blvd | HVAC: Groups D & E | Proposed Tenant upgrades to Heating, Ventilation and Cooling for specific rooms on Level 25. | $350K | Closed |
| Jun 20, 2024 | 313 Burnhamthorpe Rd | HVAC: Groups D & E | Proposal to add new kitchen exhaust system in existing restaurant - Shawarma Club. | $15K | Open |
| Jun 10, 2024 | 65 King St E | HVAC: Groups D & E | Installation of a new ecology unit for existing kitchen | $600K | Closed |
The 40 most recent of 535 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.