Street · 4353 of 8,516 by permit count
Building permits on Charlottetown Blvd, Scarborough
The City of Toronto has 31 building permits on record for Charlottetown Blvd in Scarborough, going back to 2003. Those permits created 3 homes and removed 0, a net change of +3. Declared construction value totals $1.9M. Half of the 24 permits issued here came through within 17 days of the application. The most recent permit was issued May 14, 2025 at 90 Charlottetown Blvd.
- Permits on record
- 312003–2025
- Declared construction value
- $1.9Mas filed, not adjusted
- Homes created
- 3dwelling units
- Homes removed
- 0net +3
- Typical wait
- 17 days10 days faster than the city
Permits issued per year
Most common work
Structures worked on
Postal areas
Other streets in M1C
Looking for one address on Charlottetown Blvd? The address lookup shows every permit filed against a single house or building number.
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| May 14, 2025 | Second Suite (New) | Proposal to legalize the basement as a secondary suite to the existing dwelling. | — | Open |
| Dec 3, 2024 | Second Suite (New) | Proposal to legalize the basement as a secondary suite to the existing dwelling. | — | Closed |
| Aug 22, 2024 | Second Suite (New) | Proposal to legalize the basement as a secondary suite to the existing dwelling. | — | Closed |
| Apr 5, 2024 | Back Water Valve (Sewer only) | Proposal to install a back water valve | — | Open |
| Dec 15, 2023 | Other(FS) | PROPOSING INSTALLATION OF BARRIER FREE DOORS (DOOR HOLD-OPEN DEVICE) & CONNECTION TO FIRE ALARM PNL PANEL | $25K | Closed |
| Aug 16, 2022 | Multiple Projects | Proposal for a rear/side ground floor addition, a 2nd floor addition and interior alterations to an existing SFD-detached dwelling. | $70K | Closed |
| Aug 16, 2022 | Building Permit Related(PS) | Plumbing - Proposal for a rear/side ground floor addition, a 2nd floor addition and interior alterations to an existing SFD-detached dwelling. | — | Closed |
| Nov 1, 2021 | Back Water Valve (Sewer only) | Back water valve (sewer only) install. | — | Closed |
| Aug 4, 2021 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to existing single family dwelling | — | Closed |
| Jun 29, 2021 | Interior Alterations | Proposal for interior alterations to existing single family dwelling | $10K | Closed |
| Jun 29, 2021 | Building Permit Related(PS) | Plumbing - Proposal for interior alterations to existing single family dwelling | — | Closed |
| May 12, 2021 | Building Permit Related (DR) | Drain - Proposal to finish existing basement | — | Closed |
| May 12, 2021 | Finishing Basements | Proposal to finish existing basement | $40K | Closed |
| May 12, 2021 | Building Permit Related(PS) | Plumbing - Proposal to finish existing basement | — | Closed |
| Mar 18, 2021 | Back Water Valve (Sewer only) | Proposal to install a back water valve | — | Closed |
| Dec 9, 2019 | Back Water Valve (Sewer only) | Proposal to install a back water valve. | — | Closed |
| Aug 22, 2018 | Interior Alterations | install 1 rooftop unit on school | $10K | Open |
| Aug 9, 2018 | Special Ventilation System | install 1 rooftop unit on school | $248K | Closed |
| Apr 11, 2018 | Building Permit Related(MS) | HVAC - Proposal to construct second floor addition to existing sfd. | — | Closed |
| Apr 4, 2018 | Addition(s) | Proposal to construct second floor addition to existing sfd. | $100K | Closed |
| Apr 4, 2018 | Building Permit Related(PS) | Plumbing - Proposal to construct second floor addition to existing sfd. | — | Closed |
| May 17, 2017 | Other(BA) | Foundation and slab-on-grade repairs | $165K | Open |
| Jul 26, 2013 | Building Permit Related(PS) | Plumbing - FDK-interior alterations, playground expansion | — | Closed |
| Jul 26, 2013 | Building Permit Related(MS) | HVAC - FDK-interior alterations, playground expansion | — | Closed |
| Jul 26, 2013 | Interior Alterations | FDK-interior alterations, playground expansion | $175K | Closed |
| Mar 13, 2013 | Building Permit Related(PS) | Plumbing - addition to kindergarten, interior alterations | — | Closed |
| Mar 13, 2013 | Building Permit Related(MS) | HVAC - addition to kindergarten, interior alterations | — | Closed |
| Mar 13, 2013 | Multiple Projects | addition to kindergarten, interior alterations FDK- all day kindergarten program, Charlottetown Junior P.S. | $1.0M | Closed |
| Apr 8, 2009 | Backflow Prevention Devices (Water only) | install 1 backflow prevention device | $6K | Closed |
| Apr 19, 2006 | Backflow Prevention Devices (Water only) | INSTALL 1 DEVICE IN BASEMENT | $4K | Closed |
| Aug 1, 2003 | Fire Alarm | install fire alarm system upgrade | $50K | Closed |
The 31 most recent of 31 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.
Every address on Charlottetown Blvd with a permit on record · 10
- 66 Charlottetown Blvd2 permits · to 2022
- 76 Charlottetown Blvd3 permits · to 2018
- 82 Charlottetown Blvd1 permit · to 2024
- 85 Charlottetown Blvd12 permits · to 2023
- 88 Charlottetown Blvd3 permits · to 2021
- 90 Charlottetown Blvd3 permits · to 2025
- 95 Charlottetown Blvd1 permit · to 2019
- 102 Charlottetown Blvd1 permit · to 2021
- 111 Charlottetown Blvd1 permit · to 2006
- 112 Charlottetown Blvd4 permits · to 2021