thepermitmap

Street · 296 of 8,516 by permit count

Building permits on Chaplin Cres

The City of Toronto has 479 building permits on record for Chaplin Cres, going back to 1993. Those permits created 26 homes and removed 14, a net change of +12. Declared construction value totals $32.4M. Half of the 459 permits issued here came through within 16 days of the application. The most recent permit was issued Sep 25, 2026 at 203 Chaplin Cres.

Permits on record
4791993–2026
Declared construction value
$32.4Mas filed, not adjusted
Homes created
26dwelling units
Homes removed
14net +12
Typical wait
16 days11 days faster than the city

Permits issued per year

20002026 (part year)

Zoning

Most common zone
RD71.9% of permits · by-law 10.20
In detached-house zones
71.9%34.0% above the city’s 38.0%
Permits with a zone
449of 479 on record
  • Residential437 · 97%
  • Open Space10 · 2%
  • Commercial Residential2 · 0%

The zoning categories the permits on Chaplin Cres fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Most common work

Structures worked on

Postal areas

Where this street runs

Yonge-Eglinton 229 permits
Forest Hill South 206 permits
Forest Hill North 36 permits

Other streets in M5P

Forest Hill Rd629 permits
Dunvegan Rd578 permits
Glenayr Rd388 permits
Colin Ave352 permits
Vesta Dr349 permits
Lascelles Blvd306 permits
Duplex Ave293 permits

Looking for one address on Chaplin Cres? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Sep 25, 2026 Back Water Valve (Sewer only) Backwater Valve installation — Open
Jul 27, 2026 Building Permit Related(PS) Plumbing - Proposal for second storey addition over existing first floor & interior alterations. — Open
Jul 27, 2026 Building Permit Related (DR) Drain - Proposal for second storey addition over existing first floor & interior alterations. — Open
Jul 27, 2026 Multiple Projects Proposal for second storey addition over existing first floor & interior alterations. $400K Open
Jul 21, 2026 Multiple Projects Rev 06: Removal of second unit in basement.REVISION #5: Interior layout changesREVISION#4: Interior layout changes and associated structural changes; and identification of correct sizes of windows.Interior alterations and two storey rear addition and deck, third floor balcony — Closed
Jul 7, 2026 Underpinning Proposal for underpinning. 37 m linear. $120K Open
Jul 7, 2026 Building Permit Related (DR) Drain - Proposal for underpinning. 37 m linear. — Open
Apr 13, 2026 Building Permit Related(MS) HVAC - interior alterations, underpinning and basement walkout and front porch,Rear deck — Open
Mar 18, 2026 Deck CONSTRUCTION OF A NEW WOOD DECK IN THE FRONT YARD. $1K Closed
Mar 12, 2026 Multiple Projects PERMIT REVISION TO INCLUDE STRUCTURAL UPDATES DUE TO SITE CONDITIONS,Rev 01 - INCLUDING REMOVAL AND RECONSTRUCTION OF EXISTING FRONT BAY WINDOW TO ROOF LEVEL.(ADITTION TO SCEOND FLOOR)interior alterations, underpinning and basement walkout and front porch,Rear deck — Open
Jan 21, 2026 Building Permit Related (DR) Drain - PROPOSED: EXISTING TWO STORY DETACHED HOUSE, REAR , SIDE & 1 STORY ADDITION — Closed
Jan 21, 2026 Multiple Projects Proposal to construct a two-storey rear addition, interior alteration and rear deck. $500K Closed
Jan 21, 2026 Building Permit Related(PS) Plumbing - PROPOSED: EXISTING TWO STORY DETACHED HOUSE, REAR , SIDE & 1 STORY ADDITION — Closed
Nov 18, 2025 Building Permit Related (DR) Drain - interior alterations, underpinning and basement walkout — Closed
Nov 18, 2025 Building Permit Related(PS) Plumbing - interior alterations, underpinning and basement walkout — Open
Nov 4, 2025 Building Permit Related (DR) Drain - Proposal for multiple projects (interior alterations, basement underpinning and walk-out stair). — Closed
Nov 4, 2025 Multiple Projects Proposal for multiple projects (interior alterations, basement underpinning and walk-out stair, rear yard deck, front porch). $1.6M Closed
Nov 4, 2025 Building Permit Related(PS) Plumbing - Proposal for multiple projects (interior alterations, basement underpinning and walk-out stair). — Closed
Sep 23, 2025 Interior Alterations Existing load bearing walls removal, new beams on columns. $10K Open
Sep 8, 2025 Addition(s) Rev 01: changes to front addition design, new powder roomProposal to construct a new one storey front addition — Open
Aug 27, 2025 Building Permit Related (DR) Drain - Proposal to construct a new one storey front addition — Closed
Aug 27, 2025 Building Permit Related(PS) Plumbing - Proposal to construct a new one storey front addition — Open
Jul 7, 2025 Building Permit Related(MS) HVAC - Proposal for a 2 storey rear addition, 3rd floor dormer addition, interior alterations and a wood deck. See also 24 253252 ZAP and 25 114041 MV. — Open
Jul 2, 2025 Building Permit Related(PS) Plumbing - Proposal for a 2 storey rear addition, 3rd floor dormer addition, interior alterations and a wood deck. See also 24 253252 ZAP and 25 114041 MV. — Open
Jul 2, 2025 Multiple Projects Proposal for a 2 storey rear addition, 3rd floor dormer addition, interior alterations and a wood deck. See also 24 253252 ZAP and 25 114041 MV. $150K Open
May 12, 2025 Building Permit Related(MS) REV 01: Revision to HVAC layout.HVAC - Interior alterations and two storey rear addition and deck, third floor balcony — Closed
Mar 21, 2025 Back Water Valve (Sewer only) Proposal for back water valve for single family dwelling. — Closed
Mar 6, 2025 Building Permit Related(PS) Plumbing - Proposed installation of the residential washer and dryer, puchased by the Toroto Fire Services for existing fire station. — Closed
Mar 6, 2025 Building Permit Related(MS) HVAC - Proposed installation of the residential washer and dryer, puchased by the Toroto Fire Services for existing fire station. — Closed
Mar 6, 2025 Interior Alterations Proposed installation of the residential washer and dryer, puchased by the Toroto Fire Services for existing fire station. $25K Closed
Feb 24, 2025 New Building REV 03: Second floor window (West Elevation).Rev 02: to revise the driveway orientation of the existing building permitRevision 01: revised rear yard landscaping and front yard stair configuration.ORIG.Permit: Proposal to construct a 2 storey single family dwelling with finished basement and integra — New build
Dec 5, 2024 Back Water Valve (Sewer only) Back water valve installation — Closed
Oct 23, 2024 Deck Proposal to construt a deck in the rear yard of an existing SFD-detached dwelling. $200K Closed
Sep 30, 2024 Back Water Valve (Sewer only) Installation of back water valve in existing dwelling — Closed
Sep 30, 2024 Multiple Projects Revision 01: revisions to front wall, rear awning, skylight, Minor Interior ChangeProposal to construct a rear addition, front addition and interior alterations. Also for alterations to landscaping and driveway. No new secondary suite is proposed. — Closed
Sep 25, 2024 Back Water Valve (Sewer only) BWV — Closed
Sep 12, 2024 Deck Revision - changing stairs at deck from concrete to wood.PROPOSAL TO RECONSTRUCT CONCRETE DECK AT REAR. — Closed
Aug 12, 2024 Deck PROPOSAL TO RECONSTRUCT CONCRETE DECK AT REAR. $9K Closed
Jul 31, 2024 Deck PROPOSAL TO RECONSTRUCT CONCRETE DECK AT REAR. $9K Closed
Jul 2, 2024 Back Water Valve (Sewer only) Proposed Backwater Valve Installation. — Closed

The 40 most recent of 479 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Chaplin Cres with a permit on record · 133

  • 0 Chaplin Cres8 permits · to 2022
  • 3 Chaplin Cres2 permits · to 1994
  • 29 Chaplin Cres1 permit · to 2019
  • 30 Chaplin Cres2 permits · to 2015
  • 31 Chaplin Cres8 permits · to 2011
  • 33 Chaplin Cres5 permits · to 2005
  • 35 Chaplin Cres1 permit · to 2007
  • 37 Chaplin Cres1 permit · to 2019
  • 42 Chaplin Cres5 permits · to 2015
  • 43 Chaplin Cres1 permit · to 2021
  • 47 Chaplin Cres5 permits · to 2014
  • 55 Chaplin Cres7 permits · to 2016
  • 57 Chaplin Cres3 permits · to 2012
  • 58 Chaplin Cres1 permit · to 2016
  • 62 Chaplin Cres4 permits · to 2012
  • 63 Chaplin Cres3 permits · to 2026
  • 67 Chaplin Cres2 permits · to 2003
  • 69 Chaplin Cres1 permit · to 2019
  • 70 Chaplin Cres5 permits · to 2015
  • 78 Chaplin Cres3 permits · to 2010
  • 83 Chaplin Cres4 permits · to 2002
  • 85 Chaplin Cres5 permits · to 2014
  • 86 Chaplin Cres1 permit · to 2008
  • 87 Chaplin Cres2 permits · to 2000
  • 88 Chaplin Cres5 permits · to 2023
  • 89 Chaplin Cres1 permit · to 2006
  • 92 Chaplin Cres3 permits · to 2023
  • 93 Chaplin Cres4 permits · to 2018
  • 94 Chaplin Cres1 permit · to 2019
  • 95 Chaplin Cres2 permits · to 2006
  • 96 Chaplin Cres4 permits · to 2012
  • 97 Chaplin Cres1 permit · to 2018
  • 98 Chaplin Cres8 permits · to 2026
  • 99 Chaplin Cres5 permits · to 2024
  • 100 Chaplin Cres1 permit · to 2006
  • 101 Chaplin Cres2 permits · to 2009
  • 102 Chaplin Cres6 permits · to 2012
  • 112 Chaplin Cres2 permits · to 2016
  • 113 Chaplin Cres2 permits · to 2006
  • 114 Chaplin Cres2 permits · to 2012
  • 115 Chaplin Cres5 permits · to 2015
  • 116 Chaplin Cres1 permit · to 2014
  • 117 Chaplin Cres8 permits · to 2014
  • 121 Chaplin Cres6 permits · to 2019
  • 123 Chaplin Cres2 permits · to 2022
  • 125 Chaplin Cres2 permits · to 2017
  • 128 Chaplin Cres2 permits · to 1999
  • 129 Chaplin Cres5 permits · to 2011
  • 133 Chaplin Cres8 permits · to 2015
  • 135 Chaplin Cres2 permits · to 2015
  • 140 Chaplin Cres1 permit · to 2014
  • 145 Chaplin Cres21 permits · to 2019
  • 147 Chaplin Cres1 permit · to 2020
  • 149 Chaplin Cres3 permits · to 2020
  • 151 Chaplin Cres4 permits · to 2020
  • 153 Chaplin Cres1 permit · to 2016
  • 155 Chaplin Cres2 permits · to 2008
  • 157 Chaplin Cres1 permit · to 2014
  • 159 Chaplin Cres1 permit · to 2024
  • 161 Chaplin Cres1 permit · to 2024
  • 163 Chaplin Cres4 permits · to 2012
  • 166 Chaplin Cres1 permit · to 2020
  • 167 Chaplin Cres1 permit · to 2015
  • 169 Chaplin Cres4 permits · to 2018
  • 171 Chaplin Cres2 permits · to 2021
  • 173 Chaplin Cres6 permits · to 2024
  • 175 Chaplin Cres2 permits · to 2002
  • 185 Chaplin Cres1 permit · to 1999
  • 191 Chaplin Cres5 permits · to 2018
  • 193 Chaplin Cres2 permits · to 2018
  • 197 Chaplin Cres3 permits · to 2007
  • 199 Chaplin Cres7 permits · to 2022
  • 201 Chaplin Cres5 permits · to 2018
  • 203 Chaplin Cres2 permits · to 2026
  • 205 Chaplin Cres6 permits · to 2012
  • 207 Chaplin Cres4 permits · to 2013
  • 209 Chaplin Cres6 permits · to 2010
  • 211 Chaplin Cres3 permits · to 2009
  • 215 Chaplin Cres4 permits · to 2013
  • 217 Chaplin Cres4 permits · to 2026
  • 219 Chaplin Cres3 permits · to 2024
  • 221 Chaplin Cres1 permit · to 2013
  • 222 Chaplin Cres5 permits · to 2026
  • 223 Chaplin Cres4 permits · to 2021
  • 224 Chaplin Cres3 permits · to 2007
  • 225 Chaplin Cres3 permits · to 2015
  • 226 Chaplin Cres1 permit · to 2008
  • 229 Chaplin Cres1 permit · to 2013
  • 231 Chaplin Cres5 permits · to 2015
  • 233 Chaplin Cres1 permit · to 2013
  • 234 Chaplin Cres5 permits · to 2025
  • 235 Chaplin Cres6 permits · to 2014
  • 237 Chaplin Cres4 permits · to 2016
  • 238 Chaplin Cres3 permits · to 2013
  • 239 Chaplin Cres1 permit · to 2013
  • 241 Chaplin Cres5 permits · to 2021
  • 242 Chaplin Cres4 permits · to 2017
  • 243 Chaplin Cres2 permits · to 2013
  • 245 Chaplin Cres4 permits · to 2011
  • 247 Chaplin Cres1 permit · to 2014
  • 249 Chaplin Cres5 permits · to 2015
  • 251 Chaplin Cres7 permits · to 2015
  • 253 Chaplin Cres7 permits · to 2009
  • 255 Chaplin Cres6 permits · to 2015
  • 256 Chaplin Cres6 permits · to 2026
  • 257 Chaplin Cres1 permit · to 2013
  • 263 Chaplin Cres1 permit · to 2013
  • 265 Chaplin Cres2 permits · to 2025
  • 266 Chaplin Cres1 permit · to 2017
  • 267 Chaplin Cres5 permits · to 2015
  • 271 Chaplin Cres1 permit · to 2024
  • 272 Chaplin Cres6 permits · to 2013
  • 273 Chaplin Cres6 permits · to 2013
  • 274 Chaplin Cres1 permit · to 2018
  • 275 Chaplin Cres7 permits · to 2019
  • 276 Chaplin Cres1 permit · to 2020
  • 277 Chaplin Cres3 permits · to 2010
  • 279 Chaplin Cres5 permits · to 2010
  • 285 Chaplin Cres9 permits · to 2024
  • 289 Chaplin Cres4 permits · to 2008
  • 297 Chaplin Cres1 permit · to 2015
  • 299 Chaplin Cres1 permit · to 2017
  • 301 Chaplin Cres5 permits · to 2025
  • 305 Chaplin Cres1 permit · to 2013
  • 307 Chaplin Cres1 permit · to 2015
  • 311 Chaplin Cres3 permits · to 2018
  • 320 Chaplin Cres1 permit · to 2016
  • 321 Chaplin Cres7 permits · to 2024
  • 325 Chaplin Cres13 permits · to 2025
  • 329 Chaplin Cres6 permits · to 2016
  • 340 Chaplin Cres10 permits · to 2023
  • 515 Chaplin Cres1 permit · to 2014
  • 570 Chaplin Cres5 permits · to 2023
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
479
Data through
2026-09-30
Refresh
Daily from the City
Sheet
STR-549