Street · 85 of 8,567 by permit count
Building permits on Bridletowne Crcl
The City of Toronto has 1,272 building permits on record for Bridletowne Crcl, going back to 2000. Those permits created 114 homes and removed 0, a net change of +114. Declared construction value totals $282.1M. The most recent permit was issued Jun 29, 2026 at 3151 Bridletowne Crcl.
- Permits on record
- 1,2722000–2026
- Declared construction value
- $282.1Mas filed, not adjusted
- Homes created
- 114dwelling units
- Homes removed
- 0net +114
Permits issued per year
20002026 (part year)
Most common work
Structures worked on
Where this street runs
East L'Amoreaux 1,207 permits
L'Amoreaux West 30 permits
Most recent permits
| Issued | Work | What was filed | Value | Status |
|---|---|---|---|---|
| Jun 29, 2026 | Building Permit Related(MS) | HVAC - Proposal for interior alterations to construct and expand three storage rooms within the existing apartment (Unit 507) | — | Closed |
| May 6, 2026 | Interior Alterations | Proposal for interior alterations to construct and expand three storage rooms within the existing apartment (Unit 507) | $5K | Closed |
| Jan 13, 2026 | Building Permit Related(MS) | HVAC - Proposed replacement of existing 175kw diesel generator with new in the same room including ATS with associated emergency distribution equipment and all related mechanical systems. replacement of standpipe fire pump with new including controller and ATS. Sprinkler branch extension. | — | Open |
| Jan 6, 2026 | Multiple Projects | Proposed replacement of existing 175kw diesel generator with new in the same room including ATS with associated emergency distribution equipment and all related mechanical systems. replacement of standpipe fire pump with new including controller and ATS. Sprinkler branch extension. | $1.0M | Open |
| Dec 3, 2025 | Other(MS) | Proposal for replacement of the make-up air units and decommissioning of wood burning fireplaces | $500K | Open |
| Dec 1, 2025 | Alter: Boiler/Furnace/AC Replacement | Replacement of Recreation/Pool area air-handling units and heating boilers. | $900K | Open |
| Jul 29, 2025 | Other(BA) | Proposal for Compactor Room Waterproofing Repairs | $90K | Closed |
| Mar 31, 2025 | Backflow Prevention Devices (Water only) | Proposed Backflow Prevention Devices (Water only) | $2K | Open |
| Feb 24, 2025 | Garage Repair/Reconstruction | Revision: Additional area of work to be added to the scope. Additional area will include wholesale replacement of the landscaping, waterproofing replacement, and structural concrete repairs | — | Open |
| Dec 13, 2024 | Building Permit Related(MS) | HVAC - Construction of a new 4 storey building for SHN nephrology program,medical clinics, YMCA health and fitness, childcare, and partner programs | — | Closed |
| Nov 25, 2024 | Sprinklers | Install sprinkler protection in two newly covered stairwells | $3K | Closed |
| Nov 4, 2024 | Fire Damage | Fire Damage Repair to the Residential Building - unit # 901 and corridor (common element) to pre-loss conditions. | — | Closed |
| Oct 16, 2024 | New Building | Construction of a new 4 storey building for SHN nephrology program,medical clinics, YMCA health and fitness, childcare, and partner programs | $224.7M | New build |
| Oct 16, 2024 | Building Permit Related(PS) | Plumbing - Construction of a new 4 storey building for SHN nephrology program,medical clinics, YMCA health and fitness, childcare, and partner programs | — | Closed |
| Sep 3, 2024 | Garage Repair/Reconstruction | Targeted concrete repairs to the single-level parking garage (walls, columns, soffits, and slab-on-grade) | $957K | Open |
| Jul 24, 2024 | Other(BA) | Proposal for garage Ramp Repairs (replacement of existing topping and embedded heating cables) and Mechanical Penthouse Waterproofing replacement | $244K | Open |
| May 3, 2024 | Garage Repair/Reconstruction | Proposal for localized concrete repairs to the parking garage and replacement of the ramp topping and heating system of an existing apartment building. | $454K | Open |
| Jul 27, 2023 | Balcony/Guard Repairs | Balcony Restoration - Topside blacony slab concrete repairs, soffit blacony slab concrete repairs, balcony through slab concrete repairs, balcony slab edge concrete repairs, vertical shear wall structure concrete repairs, Waterproofing and Railing Replacement | $2.4M | Closed |
| Apr 6, 2023 | Garage Repair/Reconstruction | Repairs to the parking Garage | $2.8M | Closed |
| Mar 8, 2023 | Garage Repair/Reconstruction | Revision 01. Localized garage ramp repairs, includes localized concrete repairs, and grade replacement | — | Open |
| Oct 19, 2022 | Garage Repair/Reconstruction | Front Entrance Garage Roof Repairs: Complete overburden removals, existing waterproofing membrane removal, and on-grade removal in the work area; installing new waterproofing, overburden materials, on-grade materials and site furnishings in select areas | $1.6M | Open |
| Apr 30, 2021 | Garage Repair/Reconstruction | Proposed complete overburden removals, waterproofing r3emove, and on-grade removals in the work area; Completing localized concrete repairs; Installing new waterproofing, overburden materials, and on-grade materials in the work areas on the drawings provided. | $760K | Closed |
| Aug 12, 2019 | Re-Roofing/Re-Cladding | Proposed Bridletowne Recreation Centre Roof Deck repairs. Scope of work includes overburden removal, roof deck concrete repairs, roof deck re-waterproofing, overburden replacement to match existing. | $280K | Open |
| Apr 25, 2019 | New Building | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "M1" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
| Apr 25, 2019 | New Building | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "G1" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
| Apr 25, 2019 | New Building | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "G1" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
| Apr 25, 2019 | New Building | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "U1" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
| Apr 25, 2019 | New Building | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "U1" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
| Apr 25, 2019 | New Building | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "G1" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
| Apr 25, 2019 | New Building | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "U2" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
| Apr 25, 2019 | New Building | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "U1" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
| Apr 25, 2019 | New Building | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "U2" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
| Apr 25, 2019 | New Building | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "U2" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
| Apr 25, 2019 | New Building | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "U1" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
| Apr 25, 2019 | New Building | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "M1" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
| Apr 25, 2019 | New Building | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "U2" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
| Apr 25, 2019 | New Building | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "M1" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
| Apr 25, 2019 | New Building - Lead | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "G1" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
| Apr 25, 2019 | New Building | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "G1" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
| Apr 25, 2019 | New Building | Rev 01 - Proposed revision including: Soundproofing around mechanical and plumbing, additional area drain at porch, structural modifications at front porch and interior structural changes (layout, beam type and specifications)MODEL # "M1" BLOCK D - 3 storey stacked townhouses- 24 houses | — | New build |
The 40 most recent of 1,272 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.