The City of Toronto has 303 building permits on record for Arrow Rd in North York, going back to 1985. Declared construction value totals $91.7M. Half of the 281 permits issued here came through within 36 days of the application. The most recent permit was applied for Oct 5, 2026 at 700 Arrow Rd.

Permits on record
3031985–2026
Declared construction value
$91.7Mas filed, not adjusted
Homes created
0dwelling units
Homes removed
0net +0
Typical wait
36 days9 days slower than the city

Permits issued per year

20002026 (part year)

Zoning

Most common zone
EH100.0% of permits · by-law 60.30
In detached-house zones
0.0%38.0% below the city’s 38.0%
Permits with a zone
163of 303 on record
  • Employment Industrial163 · 100%

The zoning categories the permits on Arrow Rd fall in, under Zoning By-law 569-2013. These are the City's own category names. This counts permits, not land: it says where the building work happened under which rules, not how the area is carved up. What each zone allows, and what gets built in it.

Other streets in M9M

Sheppard Ave W4,023 permits
Weston Rd3,307 permits
Rivalda Rd134 permits
Wallasey Ave111 permits
Yorkdale Cres111 permits
Aura Lea Blvd101 permits
Lou Pomanti St97 permits
Lovilla Blvd88 permits

Looking for one address on Arrow Rd? The address lookup shows every permit filed against a single house or building number.

Most recent permits

Issued Work What was filed Value Status
Oct 5, 2026 Interior Alterations Proposal for removal of an existing abandoned underground storage tank and replacement of existing waste oil aboveground storage tank in a new area. $1.9M Open
Oct 5, 2026 Building Permit Related(MS) HVAC - Proposal for removal of an existing abandoned underground storage tank and replacement of existing waste oil aboveground storage tank in a new area. — Open
Aug 31, 2026 Solar Collector Proposal for the installation of a rooftop 321kW-DC solar photovoltaic system at Univar Solutions, $538K Open
Aug 20, 2026 Partial Permit - Structural Framing Conditional Permit - Part Permit - Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors, mezzanine levels, freezer and cooler room, designated alcohol concentrated — Closed
Aug 20, 2026 Building Permit Related(PS) Plumbing - Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors, mezzanine levels, freezer and cooler room, designated alcohol concentrated storage room, chemical s — Open
Aug 20, 2026 Building Permit Related(MS) HVAC - Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors, mezzanine levels, freezer and cooler room, designated alcohol concentrated storage room, chemical stora — Open
Jun 12, 2026 Partial Permit - Foundation Conditional Permit - Part Permit - Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors, mezzanine levels, freezer and cooler room, designated alcohol concentrated — Closed
Jun 12, 2026 Building Permit Related (DR) Drain - Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors, mezzanine levels, freezer and cooler room, designated alcohol concentrated storage room, chemical stor — Open
Jun 12, 2026 Site Service Conditional Permit - Drain - Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors, mezzanine levels, freezer and cooler room, designated alcohol concentrated storag — Open
Apr 23, 2026 Site Service REV 01: Revision to include adjustment to routing layout of storm lines to suit inverts determined by site conditions Proposal for new piping to be installed with manholes and connection to City storm at street. — Open
Mar 23, 2026 Addition(s) Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors, mezzanine levels, freezer and cooler room, designated alcohol concentrated storage room, chemical storage room $17.5M Open
Mar 12, 2026 Building Permit Related(PS) Plumbing - Proposed to install a sales trailer on a vacant industrial site, as a permanent structure. — Closed
Mar 5, 2026 Building Permit Related(MS) HVAC - Proposed to install a sales trailer on a vacant industrial site, as a permanent structure. — Closed
Mar 3, 2026 New Building REVISION - due to minor changes that have come up due to the sales trailer specificationsProposed to install a sales trailer on a vacant industrial site, as a permanent structure. — New build
Feb 27, 2026 Demolition Demolition of one-storey steel-clad workshop located at 30 Arrow Road and one-storey brick building located at 24 Arrow Road. Demolition includes removal of building envelope, structural framing, slabs, foundations, and footings. See 25 144000 WET 07 SA for future development. — Demolition
Jan 29, 2026 Demolition Proposal to demolish the 1.5 storey storage building.See 25 144000 WET 07 SA for future development. — Demolition
Jan 14, 2026 Building Permit Related(MS) HVAC - Proposal to replace six(6) bus hoists and associated components in an existing TTC bus maintenance facility. — Open
Jan 14, 2026 Building Permit Related(PS) Plumbing - Proposal to replace six(6) bus hoists and associated components in an existing TTC bus maintenance facility. — Open
Jan 13, 2026 Other(BA) Proposal to replace six(6) bus hoists and associated components in an existing TTC bus maintenance facility. $9.9M Open
Dec 3, 2025 Building Permit Related(PS) Plumbing - Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material. — Open
Oct 28, 2025 Interior Alterations Proposal for interior alterations for structural bracing modifications to enlarge an existing interior wall opening. $50K Closed
Sep 8, 2025 Inside and Outside Drains Drain - Proposed to install a sales trailer on a vacant industrial site, as a permanent structure. $175K Closed
Aug 21, 2025 Addition(s) REV 01: Removal of ceiling & relocation of siamese connection.Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material. — Closed
Jul 11, 2025 Building Permit Related(FS) FS - Sprinkler Shop Drawing - The current CETI Rectification project involves modifications to the building systems to ensure that MTO programs can be executed to strict laboratory requirements and provide a functional and safe working environment. The rectifications mainly encompass mechanical HVAC — Closed
Jul 11, 2025 Multiple Projects The current CETI Rectification project involves modifications to the building systems to ensure that MTO programs can be executed to strict laboratory requirements and provide a functional and safe working environment. The rectifications mainly encompass mechanical HVAC and exhaust systems along wit $16.0M Open
Jul 11, 2025 Building Permit Related(MS) HVAC - The current CETI Rectification project involves modifications to the building systems to ensure that MTO programs can be executed to strict laboratory requirements and provide a functional and safe working environment. The rectifications mainly encompass mechanical HVAC and exhaust systems al — Open
Apr 16, 2025 Backflow Prevention Devices (Water only) Proposal to replace existing backflow prevention device and associates $6K Closed
Apr 8, 2025 Alternative Solution Proposal for an alternative solution to omit the standpipe system — Closed
Mar 18, 2025 Sprinklers Fire protection $50K Open
Nov 29, 2024 Building Permit Related(MS) HVAC - Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material. — Open
Oct 24, 2024 Alternative Solution A TIMED EGRESS ANALYSIS HAS BEEN COMPLETED BASED ON THE SFPE HANDBOOK OF FIRE PROTECTION ENGINEERING, 5TH EDITION, CHAPTER 59, ¿EMPLOYING THE HYDRAULIC MODEL IN ASSESSING EMERGENCY MOVEMENT¿ TO COMPARE THE ALTERNATIVE SOLUTION TO A THEORETICAL ACCEPTABLE SOLUTION DEVELOPED TO REFLECT THE SAME AVAILA — Closed
Sep 18, 2024 Other(BA) REVISION - increase the concrete pad height below the tanks, increase the height of the service platform, modifications to the retaining wall design above the padExterior concrete pad for 3 exterior alcohol tank and service platform (Beverage filling facility) — Open
Aug 16, 2024 Building Permit Related(MS) HVAC - To add one exterior exit door - Arrow Road Garage — Open
Aug 16, 2024 Interior Alterations To add one exterior exit door - Arrow Road Garage $20K Open
Aug 9, 2024 Inside and Outside Drains Drain - Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material. $1.0M Open
Aug 1, 2024 Partial Permit - Structural Framing Part Permit - Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material. — Closed
Aug 1, 2024 Partial Permit - Foundation Part Permit - Proposal to construct an addition to an existing recycling facility to accommodate more capacity to process recycling material. — Closed
Jul 29, 2024 Other(BA) SHORING - Excavate & shoring for the removal of existing underground tanks at TTC bus garage at 3 locations, totaling 90.95m2 of shoring. There is a building permit for the work but does not include the shoring. The permit number is 22 229761 BLD 00 BA.Dispose and replace underground storage tanks a — Open
Jul 5, 2024 Alternative Solution A TIMED EGRESS ANALYSIS HAS BEEN COMPLETED BASED ON THE SFPE HANDBOOK OF FIRE PROTECTION ENGINEERING, 5TH EDITION, CHAPTER 59, EMPLOYING THE HYDRAULIC MODEL IN ASSESSING EMERGENCY MOVEMENT , TO COMPARE THE ALTERNATIVE SOLUTION TO A THEORETICAL ACCEPTABLE SOLUTION DEVELOPED TO REFLECT THE SAME AVAILA — Closed
Nov 27, 2023 Other(DS) Replacement of two existing 45,000L volume diesel fuel above ground storage tanks and associated appurtnenances $3.0M Closed

The 40 most recent of 303 permits on record. Figures come from the City’s active and cleared permit datasets, refreshed daily — what that covers, and what it misses.

Every address on Arrow Rd with a permit on record · 59

  • 1 Arrow Rd3 permits · to 2026
  • 3 Arrow Rd9 permits · to 2020
  • 4 Arrow Rd9 permits · to 2020
  • 5 Arrow Rd9 permits · to 2020
  • 6 Arrow Rd9 permits · to 2020
  • 7 Arrow Rd9 permits · to 2020
  • 8 Arrow Rd9 permits · to 2020
  • 9 Arrow Rd9 permits · to 2020
  • 10 Arrow Rd9 permits · to 2020
  • 11 Arrow Rd9 permits · to 2020
  • 16 Arrow Rd6 permits · to 2010
  • 22 Arrow Rd7 permits · to 2015
  • 24 Arrow Rd9 permits · to 2026
  • 28 Arrow Rd3 permits · to 2026
  • 35 Arrow Rd4 permits · to 2016
  • 36 Arrow Rd4 permits · to 2016
  • 37 Arrow Rd4 permits · to 2016
  • 38 Arrow Rd4 permits · to 2016
  • 39 Arrow Rd4 permits · to 2016
  • 50 Arrow Rd4 permits · to 2023
  • 51 Arrow Rd4 permits · to 2023
  • 52 Arrow Rd4 permits · to 2023
  • 55 Arrow Rd7 permits · to 2012
  • 62 Arrow Rd11 permits · to 2023
  • 64 Arrow Rd4 permits · to 2026
  • 75 Arrow Rd7 permits · to 2018
  • 81 Arrow Rd6 permits · to 2014
  • 88 Arrow Rd1 permit · to 2009
  • 89 Arrow Rd1 permit · to 2009
  • 90 Arrow Rd1 permit · to 2009
  • 91 Arrow Rd18 permits · to 2014
  • 92 Arrow Rd18 permits · to 2014
  • 93 Arrow Rd18 permits · to 2014
  • 94 Arrow Rd18 permits · to 2014
  • 95 Arrow Rd27 permits · to 2025
  • 96 Arrow Rd18 permits · to 2014
  • 97 Arrow Rd18 permits · to 2014
  • 98 Arrow Rd1 permit · to 2009
  • 122 Arrow Rd54 permits · to 2025
  • 124 Arrow Rd1 permit · to 2022
  • 700 Arrow Rd39 permits · to 2026
  • 720 Arrow Rd6 permits · to 2026
  • 785 Arrow Rd2 permits · to 2022
  • 790 Arrow Rd7 permits · to 2015
  • 800 Arrow Rd5 permits · to 2010
  • 801 Arrow Rd1 permit · to 2016
  • 802 Arrow Rd1 permit · to 2016
  • 803 Arrow Rd1 permit · to 2016
  • 804 Arrow Rd1 permit · to 2016
  • 805 Arrow Rd1 permit · to 2016
  • 806 Arrow Rd1 permit · to 2016
  • 807 Arrow Rd1 permit · to 2016
  • 808 Arrow Rd1 permit · to 2016
  • 809 Arrow Rd1 permit · to 2016
  • 995 Arrow Rd9 permits · to 2017
  • 1000 Arrow Rd49 permits · to 2025
  • 1001 Arrow Rd2 permits · to 2023
  • 1100 Arrow Rd9 permits · to 2025
  • 1111 Arrow Rd12 permits · to 2016
Source
City of Toronto Open Data
Dataset
Building permits, active + cleared
Records
303
Data through
2026-10-20
Refresh
Daily from the City
Sheet
STR-762